USMarketsToday.com
DUO

Duos Technologies Group, Inc.

DUOT · NASDAQ ·
$2.78+$0.08 ↗ 2.78%
At close: Nov 27, 1:00:01 PM EST
$2.78+$0.00 ↗ 0.00%
After-hours: Nov 27, 1:15:00 PM EST
Volume
Forward P/E15.63
Market Cap$95.14M
Open$2.88
Trailing P/E3.02
Day Range$2.69–$2.93
Dividend Yield0.00%
52W Range$2.42–$15.28
EPS$1.01
Volume652.75K
Avg Volume1.01M
50-Day Avg$6.38
200-Day Avg$8.50
Why is DUOT moving?

DUOT was roughly flat to slightly lower, giving back a bit after a wide intraday swing, as investors weighed the company's updated 2026 outlook (Q4 revenue above $31M, full-year above $50M) and chose to take profits rather than extend the gains.

What analysts say

Updated 43m ago

Wall Street's consensus on DUOT is a Buy, with 2 of 3 analysts (66.7%) bullish, 1 neutral (33.3%), and no bearish ratings. The average price target is $14.83 and the median is $15.00. The range is wide, from a low of $5.50 to a high of $24.00, which shows real disagreement on valuation even though the ratings themselves are favorable. Targets were cut sharply in mid-November. Cantor Fitzgerald (Overweight) lowered its target from $24 to $15 on Nov. 17, after raising it as high as $27 over the summer. Chardan Capital (Neutral) cut its target from $9.50 to $5.50 on Nov. 18, about five weeks after initiating coverage. Ascendiant Capital has the most bullish published target at $24 with a Buy rating, set in September. That target predates the November cuts and may be stale. Sentiment still looks constructive on fundamentals, including a reported $400M+ 10-year data center deal with deployment expected in Q2 2027 and Q4 revenue guidance above $31M. The recent target reductions suggest analysts are now applying more cautious valuation assumptions.

Bull vs Bear

Every version →
▲ Bull caseSigned leases totaling 92 MW, improving lease terms, stronger tenant credit quality and a 10-year deal above $400 million support the Overweight case. Management targets 25 MW of contracted capacity deployed by end of 2026, with identified near-term catalysts supporting a $15 to $24 target range.[2][9]
▼ Bear caseCantor's successive target cuts, from $27 to $24 and then $15, reflect a more conservative view of the capacity ramp. The third-quarter miss, with $10.5 million revenue against $14.75 million expected, strengthens doubts. Chardan's Neutral rating at $9.50 signals limited growth visibility and execution risk.[2][9]
Largest moves in the past year from daily prices
Nov 23, 2026
Big RallyGap Up 15.1%
DUOT gained 15.1% to close at $2.98, opening 15.1% above the prior close. Intraday range of $0.30 ($2.86 – $3.16) spanned 10.5% in a volatile session. Volume reached 2.61M shares (2.1× the 20-day average).
+15.1%
Nov 17, 2026
Sharp DropNew 52-Week LowVolume 5.0× avgGap Down 14.1%
DUOT fell 27.4% to close at $3.39, opening 14.1% below the prior close. Intraday range of $1.07 ($3.22 – $4.29) spanned 33.2% in a volatile session. Volume reached 4.47M shares (5.0× the 20-day average). Set a new 52-week low of $3.22. Closed near the day's low as sellers pressed into the close.
-27.4%
Nov 5, 2026
Sharp DropNew 52-Week Low
DUOT fell 16.0% to close at $4.73. Intraday range of $1.01 ($4.66 – $5.67) spanned 21.7% in a volatile session. Set a new 52-week low of $4.66. Closed near the day's low as sellers pressed into the close.
-16.0%
Aug 17, 2026
Big RallyVolume 8.8× avgGap Up 13.6%
DUOT gained 12.8% to close at $10.28, opening 13.6% above the prior close. Intraday range of $1.70 ($9.24 – $10.94) spanned 18.4% in a volatile session. Volume reached 6.31M shares (8.8× the 20-day average).
+12.8%
Jul 31, 2026
Big RallyGap Up 14.7%
DUOT gained 5.8% to close at $8.61, opening 14.7% above the prior close. Intraday range of $0.84 ($8.50 – $9.34) spanned 9.9% in a volatile session. Volume reached 1.66M shares (2.1× the 20-day average).
+5.8%
Jun 5, 2026
Sharp Drop
DUOT fell 15.5% to close at $11.76. Intraday range of $2.26 ($11.44 – $13.70) spanned 19.8% in a volatile session. Closed near the day's low as sellers pressed into the close.
-15.5%
May 26, 2026
Big RallyNew 52-Week HighVolume 2.8× avgGap Up 6.1%
DUOT gained 17.0% to close at $14.39, opening 6.1% above the prior close. Intraday range of $1.85 ($12.56 – $14.41) spanned 14.7% in a volatile session. Volume reached 1.89M shares (2.8× the 20-day average). Set a new 52-week high of $14.41. Closed near the session high, with buyers in control into the close.
+17.0%
May 22, 2026
Big RallyNew 52-Week High
DUOT gained 13.5% to close at $12.30. Intraday range of $1.48 ($10.92 – $12.40) spanned 13.6% in a volatile session. Volume reached 1.26M shares (2.0× the 20-day average). Set a new 52-week high of $12.40. Closed near the session high, with buyers in control into the close.
+13.5%
May 21, 2026
Big Rally
DUOT gained 20.3% to close at $10.84. Intraday range of $1.99 ($8.87 – $10.86) spanned 22.4% in a volatile session. Volume reached 1.34M shares (2.4× the 20-day average). Closed near the session high, with buyers in control into the close.
+20.3%
Feb 27, 2026
Sharp DropNew 52-Week LowVolume 13.1× avgGap Down 14.7%
DUOT fell 14.1% to close at $7.55, opening 14.7% below the prior close. Intraday range of $0.59 ($7.31 – $7.90) spanned 8.1% in a volatile session. Volume reached 2.70M shares (13.1× the 20-day average). Set a new 52-week low of $7.31.
-14.1%
Feb 6, 2026
Big Rally
DUOT gained 14.1% to close at $9.56. Intraday range of $1.17 ($8.45 – $9.62) spanned 13.8% in a volatile session. Closed near the session high, with buyers in control into the close.
+14.1%
Dec 30, 2025
Big RallyNew 52-Week HighVolume 5.3× avgGap Up 4.3%
DUOT gained 16.7% to close at $11.87, opening 4.3% above the prior close. Intraday range of $1.76 ($10.41 – $12.17) spanned 16.9% in a volatile session. Volume reached 887.70K shares (5.3× the 20-day average). Set a new 52-week high of $12.17. Closed near the session high, with buyers in control into the close.
+16.7%

Latest news

Price forecast 12-month price targets from 3 analysts

Price, past year Buy target Hold target Sell target Consensus high · average · low
Average price target
$14.83
▲ 434.4% upside
High$24.00 +764.9%
Median$15.00 +440.5%
Low$5.50 +98.2%
Current price$2.78

Change is measured from the current price. Targets are analysts’ 12-month views, not facts.

Analyst estimates · fiscal years · E = consensus estimate

MetricFY2024FY2025FY2026EFY2027E
Revenue$7.28M$27.02M$48.80M$152.25M
Revenue growth-2.5%+271.2%+80.6%+212.0%
EPS (diluted)-$1.39-$0.64$1.32$0.23
EPS growth———-83.0%
Net income-$10.76M-$9.84M$44.12M$23.38M

Analyst rating changes 3 analysts Forecast & rating history →

Recent rating actions

DateFirmAnalystActionRatingPrice Target
Nov 18 Chardan Capital Bill Papanastasiou Maintains Neutral $10 → $6
Nov 17 Cantor Fitzgerald Brett Knoblauch Maintains Overweight $24 → $15
Oct 21 Cantor Fitzgerald Brett Knoblauch Reiterates Overweight $24
Oct 16 Cantor Fitzgerald Brett Knoblauch Maintains Overweight $27 → $24
Oct 9 Chardan Capital Bill Papanastasiou Initiates Coverage On Neutral $10
Sep 14 Ascendiant Capital Edward Woo Maintains Buy $22 → $24
Aug 18 Cantor Fitzgerald Brett Knoblauch Maintains Overweight $26 → $27
Jul 31 Cantor Fitzgerald Brett Knoblauch Initiates Coverage On Overweight $26
Jun 15 Ascendiant Capital Edward Woo Maintains Buy $17 → $22
Apr 17 Ascendiant Capital Edward Woo Maintains Buy $14 → $17
Dec 30 Ascendiant Capital Edward Woo Maintains Buy $12 → $14
Sep 24 Ascendiant Capital Edward Woo Maintains Buy $11 → $12

Research

Independent reports

DUOT: Duos Technologies Group, Inc.
Ascendiant Capital Markets, LLC·Apr 15, 2026 bullish

Ascendiant maintained a Buy rating and raised its 12-month price target to $17 from $14, citing the EDC deployment pipeline, strong data-center demand, and a $65 million capital raise; it projected 2026 revenue of $48 million and 2027 revenue of $60 million. The report recognized commercialization and other execution risks but judged the growth opportunity and potential rewards compelling.

Earnings Earnings history → · Earnings calls →

Next report · Q4 FY2026

DateApr 1, 2027
EPS Est.$0.20
Revenue Est.$29.05M
Avg 1-Day Move±12.7%

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
Q3 FY2026 Nov 16, 2026 -$0.01 -$0.26 -2,500.0% $14.14M $10.50M -25.8% -27.4%
Q2 FY2026 Aug 17, 2026 -$0.02 -$0.13 -550.0% $4.90M $6.18M +26.0% +12.7%
Q1 FY2026 May 18, 2026 -$0.03 -$0.15 -400.0% $9.60M $2.72M -71.6% -5.4%
Q4 FY2025 Mar 31, 2026 -$0.01 -$0.15 -1,400.0% $10.00M $9.46M -5.4% -5.2%
Q3 FY2025 Nov 12, 2025 -$0.12 -$0.06 +50.0% $10.00M $6.88M -31.2% +1.1%
Q2 FY2025 Aug 14, 2025 -$0.22 -$0.30 -36.4% $4.94M $5.74M +16.2% +1.0%
Q1 FY2025 May 15, 2025 -$0.18 -$0.18 0.0% $4.30M $4.95M +15.2% +9.3%
Q4 FY2024 Mar 31, 2025 -$0.30 -$0.41 -36.7% $2.75M $1.46M -46.9% -7.4%

Latest earnings analysis · Q3 FY2026 · Nov 16, 2026

Q3 2026 revenue was $10.5 million, up over 100% from $5.2 million, with gross margin of 42% versus 33%. Net income was $864,000 ($0.02 per share), adjusted EBITDA was about $500,000, and cash ended at $44.8 million with essentially zero debt.
Duos completed its transformation into a colocation compute center company by selling its rail business, winding down the APR asset management work, and selling its GPU-as-a-service entity to Axe Compute. Axe covered about $87.8 million of GPU debt and will pay $42.9 million in monthly installments of $715,000, with the balance due by September 30, 2027.
Columbus, Georgia began full operations in October with more than 7 megawatts installed in about 75 days and a 5-year, 5-megawatt agreement. Duos also signed a 10-year, 20-megawatt colocation deal worth over $400 million with a public cloud provider, with deployment expected in Q2 2027 and billing on delivered megawatts.
Guidance: Q4 2026 revenue is expected to be at least $30 million, full year 2026 revenue above $50 million with positive adjusted EBITDA, and the $160 million 2027 revenue target is unchanged. Full 2027 EBITDA guidance will come on the year-end call, though solid EBITDA growth is expected.
Site economics are about $6.5 million of CapEx per megawatt, $2 to $2.5 million of annual revenue and about $1.5 million of site-level EBITDA per billable megawatt, with payback just under 5 years. Duos is pursuing about 100 megawatts of powered land (25 under contract) and plans mostly non-dilutive project-level debt to fund a $480 to $650 million build program, building only after customers sign.

Earnings call · Q3 FY2026 · Nov 16, 2026 · 4:30 PM EST

Full transcript →
≈ 35:40 · 64 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Operator

Good afternoon and welcome to Duos Technologies Third Quarter 2026 Earnings Presentation. I would like to remind everyone that this call is being recorded. Earlier this afternoon, the company released its third quarter 2026 financial results via press release and filed its Form 10-Q for the three months ended September 30, 2026. Joining us for today's call are Duos CEO, Doug Recker, and CFO, Chris DeAlmeida. Following management's remarks, we will open the call to questions from the company's covering analysts. Individual investors who have additional questions not addressed through live Q&A may contact Duos' investor relations team at duot@duostech.com. Before we conclude today's call, I will provide the necessary cautions regarding the forward-looking statements made by management during this call. With that, I will turn it over to Doug. Sir, you may proceed.

Doug Recker

Thank you. Welcome, and thank you all for joining us this afternoon. I am going to spend most of my time today on where Duos is going, not on walking through the quarter line by line. Chris will take you through the numbers, but this quarter's numbers are a snapshot of the company in the middle of change. The more useful conversation is about who we are, where we are going, and what we are building. Here are the headlines. In the third quarter, we completed the transformation of Duos into a colocation compute center company. We develop, own, and operate compute centers built on our modular architectural design.

We are targeting sites from 1 MW to 20 MW across the United States, with a driving focus on sites between 5 MW and 10 MW going forward. We provide the building, the power, the cooling, the connectivity, and the security. Our customers bring the compute.

That is the business now. During the year, we have executed three major transformations, starting with selling our legacy rail business. We also wound down the asset management work for the new APR Energy. On September 30, we sold our GPU-as-a-Service entity to Axe Compute. Every dollar of capital, every hour of management time now goes to one thing, compute centers. I want to spend a moment on the last step, because it is the deliberate choice we made. Our GPU business did its job. It proved we could find sites, bring power online, and stand up high-density AI infrastructure for demanding customers. But owning GPUs is a different business from owning the compute center. GPUs can lose value and carry technology risk. Compute centers give us long-term contracts and assets that hold their value.

With the GPU-as-a-Service SPV sale that we announced at the end of the quarter, Axe covered approximately $87.8 million of debt tied to the GPU fleet. Axe will pay us an additional $42.9 million in monthly installments of $715,000, with the remaining balance due no later than September 30, 2027, or earlier if Axe or an affiliate obtains financing secured by the GPU cluster. As for Duos, we continue to serve the end customer from our Columbus campus just as before. But now, under an extended five-year agreement, we have entered into a lease of the GPUs with Axe to service the customer. Additionally, as our balance sheet no longer carries GPU risk, our capital now goes to compute centers development. So why compute centers, and why focus on the 5 to 10 MW range? The demand for high-performance computing keeps growing, but the bottleneck has moved.

It's no longer chips. It's power, and it's time. Large hyperscale campuses can take years to permit, connect to the grid, and build. Meanwhile, cloud providers, AI platforms, and enterprise need capacity now. The capacity is beyond everyday life. It shows you in stream at night, on the online game your kids play, the AI tool the students use to study for exams, and the telehealth visits with doctors in other cities. More and more, the capacity needs to be spread across more locations closer to the people and businesses using it. That's the gap we're built for. A 5 MW to 10 MW size site is big enough to matter to a cloud provider, yet small enough that we are able to find stranded power without waiting years in utility queue. That opens up markets the large developers are overlooking, include Tier Three and Tier Four markets.

Because our architecture is modular, we can bring capacity online in months, not years, and add more in phases as additional customers sign. Just as important, we build differently. Our compute centers use closed-loop cooling so they don't consume the millions of gallons of water many large facilities need. We go where the power already exists, open capacity that's sitting unused. That's stranded power, so we're not adding strain to the grid that local families and businesses depend on. We aim to leave every community better than we found it. Better connectivity in areas that have been underserved, local jobs in engineering, construction, and operations, and new tax revenue for schools, roads, public services, and local infrastructure. In many of the towns where we operate, this makes a real difference. Columbus, Georgia is the proof. We acquired the campus in July of this year.

Within about 75 days, we had installed more than 7 MW of new infrastructure, all with local workforce, and the campus began full operation in October. Today, it supports a cluster of 2,304 NVIDIA B300 GPUs, and we have a five-year, 5 MW agreement now. Speed of power is what our customers are paying for, and Columbus shows we can deliver it. It's also our template. What we did in Columbus is what we intend to repeat in every site. The second proof point is who's signing with us. Last month, we signed a 10-year, 20 MW colocation agreement with a mature, publicly traded cloud service provider. It's valued at more than $400 million in total contract value, and deployment is expected to begin in the second quarter of 2027. That agreement tells you three things. A 10-year term is twice as long as our earlier agreements.

It came from a sophisticated counterparty that did its due diligence and chose Duos. The 20 MW is exactly the size of site we're built to deliver. So where are we headed? Let me be specific about the next 12 months. First, power and land. We're working to secure approximately 100 MW of additional powered compute center zoned land across multiple U.S. markets. About 25 MW of that is already under contract, and we're in active negotiations on the other 75 MW. Second, delivery. Just as we did in Columbus, we're already developing the 20 MW site for our new cloud customer, which is scheduled to go live in the second quarter of 2027. We're on track to deliver at or before the ready for service date. We're also developing an additional site in Georgia that could go live as early as the first quarter of 2027.

Stay tuned for more information on that in the future. Additionally, we are seeing stronger demand from larger, better financed, and more diversified customer base than we did six months ago. This is a strong indication of how far we have come in such a short period of time, and where we are headed. Third, funding. We plan to fund our growth primarily with non-dilutive financing at both the project level and the corporate level, matched the contracts we have signed. Chris will say more about that in a few minutes. Additionally, let me update you where we are with the other agreements we have announced. We are still progressing with the 10 MW site announced earlier this year, but working through the additional power delivery from Georgia Power has delayed the project.

However, our equipment is already on site, and we have a solution that we expect will be up in Q2 of 2027. Additionally, we are still progressing on the 55 MW and actively looking at sites to support that capacity. Finally, our technology solutions group is growing rapidly. Duos Technology Solutions became our largest revenue line this year, and the amazing team is not stopping anytime soon. This group serves customers building data center and AI infrastructure across the country. It also gives us sourcing scale and supply chain assets for our own compute centers built. When long-lead equipment decides who delivers on time, that is a real advantage. Before I turn it over to Chris, I want to thank our team. What we have done this year is remarkable.

In less than 12 months, this team has sold our legacy rail business, wound down the new APR agreement, raised more than $120 million, acquired and stood up a Columbus campus, completed the sale of the GPU business, and signed a 10-year agreement with a publicly traded cloud service provider. Any one of those would be huge, big, big year for the company our size. This team did all them while running the business every day. I especially want to recognize our field and construction crews in Columbus. They installed more than 7 MW in about 75 days, and that is the kind of execution our customers need. I also want to thank our Duos Technology Solutions team, who built our largest revenue line from zero in about a year. Thank you to our board and our shareholders who backed us through a year of big decisions.

We have also strengthened our leadership team this next phase. During that past few months, we have welcomed Dipan Patel, our new Chief Operating Officer, who is leading the build-out of our sites, as well as Matt Polimeni, who joined September as our Chief Legal Officer. Also, I am glad to have Chris DeAlmeida, our new CFO. Chris is actually helping to guide the capital raise decisions and focus on funding the business with minimal equity dilution. With that, I will turn it over to Chris. Chris?

Chris DeAlmeida

Thanks, Doug, and thanks again for joining us. Since this is my first call with Duos, a quick introduction. I joined as CFO in late August after spending most of my career as a CFO in the publicly traded construction and infrastructure industries. My priorities are simple: give investors a clear, consistent view of how this business makes money, fund our growth in a way that protects shareholders, and build the financial discipline and reporting structure a company at our stage needs. Because the business has changed so much this quarter, let me start with three things that will help you read the results. First, the rail business, which we sold on August 5, is presented as discontinued operations. Second, this quarter shows the business in transition. The asset management revenue that drove the third quarter of last year has wound down.

Technology Solutions is now our largest revenue line, and recurring colocation compute center revenue is just starting, with the Columbus site having begun full operations in October after the quarter closed. Third, the quarter includes several items tied to the GPU sale, including a gain on the sale and a loss on paying off the related debt. Now, beginning with our top line, total revenue for the third quarter 2026 was $10.5 million, up over 100% from $5.2 million in the third quarter of 2025. Technology Solutions contributed $6.8 million compared with virtually nothing a year ago. Services and consulting revenue was $3.5 million, which was primarily related to work for a new colocation customer. Related party services and consulting revenue for the third quarter 2026 was approximately $70,000, down from $5.2 million in the prior year period as the asset management agreement wound down.

Gross profit for the third quarter 2026 was $4.4 million, up 150% as compared to the same period a year ago. This led to a gross margin of 42% for the third quarter of 2026, as compared to a 33% gross margin for the prior year period. This improvement came from a shift in the revenue mix away from the asset management work. Technology Solutions earned a margin of about 15%, which is typical for a sourcing and integration business. The professional services work carried a much higher margin. Over time, we expect recurring colocation revenue to become the main driver of our margin, which will continue to drive gross margin improvement as more megawatts come online. Operating expense for the third quarter 2026 was $6.2 million compared with $2.6 million a year ago.

The increase came mainly from higher non-cash stock-based compensation, along with investment in business development and the team we need to scale. Stock-based compensation for the third quarter 2026 was $2.3 million. This resulted in a third quarter 2026 loss from operations of $1.9 million compared with a loss of operations of $900,000 in the prior year period. Other income for the third quarter 2026 was $1.4 million. This included a $4.7 million gain on the deconsolidation of the GPU-as-a-Service business and $740,000 of interest income. These were partially offset by a $2.8 million loss on extinguishment of debt and $1.6 million of interest expense, both tied to the GPU facility that actually paid at closing. Loss from continuing operations before income taxes was $500,000 compared with a loss of $800,000 in the prior year period.

Net income for the third quarter 2026 was $864,000 or $0.02 per fully diluted share, as compared with a net loss of $1 million or a loss of $0.06 per diluted share, fully diluted share, sorry, in the prior year period. Adjusted EBITDA for the third quarter 2026 was approximately $500,000. The company did not report adjusted EBITDA in the prior year period. For the first nine months of 2026, revenue was $18.8 million, up 36% from the prior year period, with a gross profit of $8.9 million for the first nine months of 2026, or an increase of 87% from the prior year period. Income from continuing operations before tax was $50.1 million, which includes a one-time $53.5 million gain during the second quarter from realizing our interest in the parent of new APR Energy.

Excluding this gain, loss from continuing operations before income tax for the first nine months of 2026 was $3.4 million compared with a loss of $3.3 million in the prior year period. We ended the quarter with $44.8 million in cash compared with $15.5 million at the end of 2025. During the quarter, we spent significant cash on ordering long lead items for current and future projects, as well as securing additional sites for development and the finalization of the Columbus build-out. As of September 30, 2026, we had essentially zero debt outstanding. We remain comfortable that cash flow from operations and current receivables will continue to support the ongoing operations of the business outside of future site developments. Now, for anyone modeling the company, here's how our revenue works. We track each site in three stages: signed, in service, and billing.

Recurring revenue starts when a customer's capacity is ready and accepted, not when the contract is signed. That's why recurring colocation revenue starts to materially show in the fourth quarter as the Columbus site has a full quarter of operations. Several of you have asked us to be clear on what a site earns, so let me take this opportunity to clarify the details for the framework going forward. I realize some of these numbers are updated from what we said previously, but this is a business that has moved quickly and refined its focus and operating model in real time. As a result, we have streamlined our approach to the markets and reduced operating costs for future sites. Moving forward, our total CapEx built per megawatt, including land and site work, is approximately $6.5 million.

This is the per megawatt CapEx level we can expect on each site for the total available megawatts per site, not just the critical IT load. Now, let's look at each megawatt from a return perspective. At our current contract rates, each billable megawatt generates roughly $2 million-$2.5 million of revenue per year. A billable megawatt is what we can contractually bill the customer for. Typically, this is the critical IT load. On the cost side, we expect to pass power through to the customer going forward, eliminating power costs for the critical IT load from our operating site expenses. Therefore, after site operating costs, each megawatt should produce around $1.5 million of site-level EBITDA on an annual basis. I also want to clear up the payback question. Some of our earlier materials referred to a payback of about less than three years.

That figure compared revenue to build cost. Measured on a site-level EBITDA, excluding financing costs, but including non-critical IT power costs, which we would pay for, the payback is just under five years. With project debt or lower non-critical IT power costs, the payback on our own equity is considerably shorter. However, returns will vary by site. The biggest drivers are the contract rate, the cost of power, and how much additional work a site needs to be fully operational. That is why we pick sites with stranded power first and sign the customer before we build. As we enter the fourth quarter, the transformation of Duos into a colocation compute center company is materially complete. Our operating model is now built around long-term recurring contracts, plus the addition of our rapidly growing technology solutions infrastructure business.

Based on contracts already performing, a full quarter of colocation revenues, and orders scheduled for delivery in the fourth quarter, we expect fourth quarter 2026 revenue to be at least $30 million. As a result, we remain comfortable that total revenue for 2026 will exceed $50 million, and we expect positive adjusted EBITDA for the full year. I want to point out that the sale of the GPU-as-a-Service transaction will impact EBITDA going forward, including the fourth quarter. Specifically, we are no longer paying interest on the GPU financing, but now we are paying GPU rent that runs through cost of revenues. This, of course, moves the expense from an EBITDA add-back to a site-specific operating expense. As a result, selling the GPUs changes the EBITDA calculation and will affect Q4, but as I just said, we still expect positive adjusted EBITDA for the full year 2026.

Regarding the full year 2027 guidance, I have been here a little less than three months and still trying to fully clarify all the puts and takes in a very fast-changing business. Additionally, I always want to provide relevant, clear guidance so investors can understand where we are and what we are looking to achieve. In that regard, we are not changing the previously stated $160 million of full year 2027 revenues. However, given some of the recent changes in the business, it is premature to provide a full year 2027 EBITDA range. In any case, we anticipate we will see solid EBITDA growth in 2027 and plan to give full year guidance on our year-end 2026 earnings call. With the transformation of the business materially complete, our near-term priorities are clear.

We will finalize site agreements on approximately 100 MW of powered land, and we will prepare for commencement of the 20 MW cloud deployment in the second quarter of 2027. With that, let us talk about the question we hear most from shareholders: How are we going to pay for this? Starting with the size of it. At roughly $6.5 million per megawatt, our next 75-100 MW is a program of roughly $480 million-$650 million built over several years. That is a big number for a company our size, but we won't build it all at once. We will build it site by site and in phases, and we will continue to commit construction capital to a site once a customer has signed. Here is how we will fund each site going forward.

Our goal is to fund the majority of each site using non-dilutive project-level debt and debt-like instruments secured by site and its customer contracts. Long-term contracts with creditworthy customers, like our 10-year cloud service agreement, are exactly what lenders want to finance. The rest of the site build is equity in the project, and we have several sources for it, including cash on our balance sheet, receivables that are on our balance sheet today, continuing cash flow from operating sites, and where it makes sense, partners to invest alongside of us at the project level. Corporate-level financing sits on top of that and gives us the flexibility across the portfolio. What does this capital cost? I won't quote rates before terms are final, but what I can tell you is how we think about returns.

A site must earn a yield well above what it costs to finance it. With unlevered returns in the mid-20s, 20% levels, that spread gives us room for today's debt rate levels while still creating value for shareholders. On dilution, our clear preference is not to issue common equity to fund the business. That said, we are evaluating a range of structures, and we won't rule out any tool, but every financing decision gets the same test. Does it grow megawatts and recurring cash flow per share? Equity remains one of the tools available to us, and if we were to use it would be to fund growth with returns we believe are clearly accretive to shareholders over time. But let me be clear, our number one focus and top priority is non-dilutive financing at the project and corporate level. With that said, here's where things stand today.

Columbus has been funded from our balance sheet. For the 20 MW cloud deployment and our next sites, we're in active discussions with several potential lenders and capital providers at both the project and corporate level, and we'll update the market as agreements are finalized. However, we are not stopping. We have already begun work securing sites and ordering of equipment for upcoming contracts. This is reflected in the cash we used during the third quarter, and that is solely focused on driving site development and increased future EBITDA. Like I said earlier, our cash and expected ongoing cash flow from operations will cover our current non-site-related commitments. External financing is what lets us build the next sites at the pace our customers want. To sum it up, the business model is now straightforward.

We sign the customer, build in phases, and finance each site against its contracted cash flows, with a clear preference for non-dilutive capital. We'll measure our success by megawatts in service and recurring cash flow per share, and we'll keep reporting our progress on that basis. Going forward, my job is to make sure every dollar we put to work earns its keep for shareholders. With that, I'll turn the call back over to Doug.

Doug Recker

Thanks, Chris. Let me leave you with three things. One, Duos is now a colocation compute center company. The model is simple. We build, run the compute center, and our customers bring the compute. Two, the model works. In Columbus, we installed more than 7 MW in about 75 days, and the campus is full operation. Additionally, a publicly traded cloud service provider just chose to partner with us for a 10-year deal. Why? Because they've seen what we can deliver. Three, the runway in front of us, about 100 MW of powered land in development, focused on distributed sites from 5 MW to 10 MW in markets and communities that we partner with that others overlook. And each one funded site by site against signed contracts. That's key. We're building something durable, and we appreciate your support. Operator, we would like to open it up for questions, please.

Operator

Thank you. The company will now be taking questions from its covering analysts. If you would like to ask a question, please press star one on your telephone keypad. A confirmation tone will indicate your line is in the question queue. You may press star two to remove yourself from the queue. For participants using speaker equipment, it may be necessary to pick up the handset before pressing the star keys. Now, our first question will come from Scott Buck with Titan Partners. Please proceed with your question.

Scott Buck

Hi, good afternoon, guys. I appreciate all the added color over the prepared commentary, especially around the financing. First question, I'm curious, Doug, the 20 MW CSP contract, is the 2Q start a full 20 MW, or is that a phased ramp?

Doug Recker

Megawatt on when it's delivered, whether the customer is installed or not.

Scott Buck

Okay. If you deliver a full 20 MW by the second quarter, they are paying for a full 20 MW?

Doug Recker

That is correct.

Scott Buck

Yeah. Okay. Perfect. Then, that CSP deployment, that is on the existing flagship campus, or that is on a new site?

Doug Recker

I am sorry, you broke up. The 10 MW, is that what you are asking? The additional 10 MW?

Scott Buck

No, no. The 20 MW contract.

Doug Recker

No, no. The 20 MW is not in Columbus. It is not. It's a new facility.

Scott Buck

Okay. All right, perfect. Then, I guess my last question on the land pipeline, the 100 MW land pipeline. Said you have about 25 MW currently under contract and 75 MW in negotiation. What is the timeline to close there? Then, are any of these sites tied to specific customer demand, or is this somewhat of a speculative build?

Doug Recker

Sure. The 75 MW, actually most of it is under LOI and hard money down, so deposits are down. I think we should know a majority of that by the end of this year, or going into January. But those sites, there are multiple sites, obviously, average about 10 MW to 20 MW per site. Those are going to be picked based on customer worthiness, basically creditworthiness. So we're in a position now where we can pick and choose. Our backlog is huge, and six, eight months ago, it would have been a different story. But now we're looking for the future. We're looking for longer-term deals and high creditworthy customers.

Chris DeAlmeida

One thing to keep in mind, Scott, is we do not do speculative, so we look for signed contracts with customers before we build.

Scott Buck

Perfect. That is it for me, guys. I appreciate the time. Thank you.

Chris DeAlmeida

Thank you.

Doug Recker

Thank you, sir.

Operator

Thank you. As a reminder, if anyone has any questions, you may press star one on your telephone keypad to join the queue. Our next question comes from the line of Ed Woo with Ascendiant Capital Markets. Please proceed with your question.

Ed Woo

Yeah. Congratulations on all the progress. You guys are very close to, obviously, what's going on with all the data centers and AI trends. Are you seeing any big changes so far, particularly, obviously, with the recent change in political landscape?

Doug Recker

Yeah. Actually, great question. Our secret sauce right now is, obviously, if you follow us for the last year, you see where we deploy in Tier Three and Tier Four markets, right? We've actually had the pitch down pretty well. We go into these markets first, and we actually sell the community first before we actually engage in the land. Because what we don't want to do is basically buy the land or put money down on the land and find out the community does not want us. Every piece of property that we're talking about today and in the future, we've already vetted the community. Their buy-in is there. There is one site where I have a final buy-in. I believe that's mid-December in Ohio, and that's one of our larger sites. But yeah, the key here is to educate the market.

When we go into a market right now, the first thing you're getting is, "We don't want data centers." And we understand that. We totally understand that. What we do, and Dipan has been excellent at this, and our marketing team, is they go into the market, and they do basically a show and tell. They'll go into the community center, and they'll have booths set up where the community can come in, and we show them what we're building. We also show them what a mega campus looks like, because that's what they think everybody's building when you say data center. When they actually see our layout and how we build, and we don't use water, and we're in the community, we're actually there to help them grow their connectivity and everything, they actually like it.

What's very interesting, what's really cool about what we're doing is, the majority of our sites, I would say nine out of 10 of them, they come to our Columbus facility. Just last week, we had one of the towns come with their Chamber of Commerce, with their elected officials. And they came in and toured the facility. We've had a couple other folks do that as well, and we welcome that because they can see the size of the facility we're building. It's totally different. They actually bring They calculate the noise, they look at the water intake. So it's not we're just saying it, they're actually, we're willing, "Hey, come look at it. Come see what we're doing," and we actually educate the community. That's worked out huge for us. Plus, we're going to where the power is already, right?

They are not building new infrastructure out in the town. We are not taking and using power that the community is already using. It is stranded power, basically, is what we call it. It is at the transformer level, and it is sitting there at the substation. That is our approach.

Ed Woo

Great. That is a great answer to my questions. Thank you, and I wish you guys continued good luck. Thank you.

Doug Recker

Thank you, sir.

Operator

Thank you. Our next question comes from the line of Bill Papanastasiou with Chardan Capital Markets. Please proceed with your question.

Bill Papanastasiou

Yeah, good evening. Thank you, gentlemen, for taking my questions.

Doug Recker

Yes, sir.

Bill Papanastasiou

Yeah, great. Just wanted to add on to the prior question. Doug, was hoping you'd be able to share a boots-on-the-ground perspective of the supply-demand environment for data center colo capacity and how you expect it to evolve. Curious to hear how availability of powered land opportunities are trending and whether you're seeing market dynamics shift given the regulatory headwinds. Do you anticipate new entrants will start seeking out smaller-scale deployments, and how do you see competition kind of sifting out here? Thank you so much.

Doug Recker

Yeah, Bill. Yeah, great question. I think that it would be crazy if we don't start to see other folks getting into that space because the demand is obviously there. We didn't invent the demand. The demand is there, and now they're seeing it's easier to get to the 5 MW to 20 MW, not just for inference, but actually even for enterprise, even for regular compute. Obviously, we're deploying 5 MW of B300s right now, right? Or 7 MW. So the need is there, and they can use it. The question everybody's asking is that going to be affected like the big ones are? I can tell you right now from being boots on the ground, I go to every one of those communities before we get engaged, and the 20 MW doesn't really move the needle for them.

Now, they are interested, they want to understand it, but it is a lot easier to deploy in the 5 MW to 20 MW. I do not mean easier, but it is easier to get past the political piece, and it is easier to find the 5 MW to 20 MW. You see a lot of Bitcoin mining sites, right, that were out there, and people are going crazy over those. There is 5 MW and 10 MW available. The problem with a lot of those sites is they are not in heavy industrial usually, and you cannot put generators. There is tons of land out there right now with 5 MW to 10 MW that people could buy tomorrow. If you do your due diligence, you find out you cannot put generators there. If I cannot put generators there, it does me no good.

They are out there, you have to find them, and you want to make sure that they are zoned correctly and the community still knows what you are doing. They do not like it when you backdoor them at all, and they will shut you down. We have seen that with another person that is deploying. That is why our key is to get out there first and see if we are even welcome before we get engaged.

Operator

Thank you. This concludes our question and answer session. If your question was not addressed on the call, you can reach out to the company's investor relations team at duot@duostech.com. I would now like to turn the call back over to Mr. Recker for his closing remarks.

Doug Recker

Thanks, operator. Thank you all for the support and joining us today. We look forward to talking to you in the future. Have a great night. Thank you so much.

Operator

Thank you. Before we conclude today's call, I would like to provide Duos' safe harbor statement that includes important cautions regarding forward-looking statements made during this call. This earnings call contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking terminology such as believes, expects, may, will, should, anticipates, plans, and their opposites or similar expressions are intended to identify forward-looking statements. We caution you that these statements are not guarantees of future performance or events and are subject to a number of uncertainties, risks, and other influences, many of which are beyond our control, which may influence the accuracy of the statements and the projections upon which the statements are based and could cause Duos Technologies Group Inc.'s actual results to differ materially from those anticipated by the forward-looking statements.

These risks and uncertainties include, but are not limited to, those described in Item 1A in Duos' annual report on Form 10-K, which is expressly incorporated herein by reference, and other factors as may periodically be described in Duos' filings with the SEC. During this call, Duos also referred to adjusted EBITDA, which is a non-GAAP measure. A reconciliation to the most comparable GAAP measure is in today's press release, available in the investor relations section of the company's website. Thank you for joining us today for Duos Technologies Group's third quarter 2026 earnings call. You may now disconnect.

Financials USD · E = consensus estimate · column links open the source filing

Revenue and net income

FY2022FY2023FY2024FY2025FY2026EFY2027E
Revenue $15.01M $7.47M $7.28M $27.02M $48.80M $152.25M
Revenue Growth +81.7% -50.2% -2.5% +271.2% — —
Gross Profit $4.75M $1.31M $469.22K $7.88M $19.14M $69.71M
Gross Margin 31.6% 17.5% 6.4% 29.2% — —
EBITDA -$6.51M -$10.90M -$8.82M -$7.65M $3.13M $36.85M
EBITDA Margin -43.4% -145.8% -121.2% -28.3% — —
Net Income -$6.86M -$11.24M -$10.76M -$9.84M $44.12M $23.38M
Net Margin -45.7% -150.5% -147.8% -36.4% — —
Diluted EPS -$1.11 -$1.56 -$1.39 -$0.64 $1.32 $0.23
EPS Growth -31.9% +40.5% -10.9% -54.0% — —
Operating Cash Flow -$7.87M -$8.75M -$3.49M -$13.75M — —
CapEx -$344.92K -$496.69K -$1.83M -$23.66M — —
Free Cash Flow -$8.22M -$9.24M -$5.32M -$37.41M — —
Cash $1.12M $2.44M -$15 -$14 — —
Total Debt $5.34M $5.05M $8.53M $4.64M — —
Enterprise Value $18.53M $23.79M $61.88M $234.68M — —

Ratios · FY2025

Valuation
P/E-17.58×
P/S8.51×
P/B1.73×
P/FCF-6.15×
EV/Sales8.68×
EV/EBITDA-30.67×
FCF Yield-16.3%
Profitability
Operating Margin-36.1%
Net Profit Margin-36.4%
Return on Equity-9.4%
Return on Invested Capital-20.8%
Return on Assets-19.8%
R&D to Revenue0.03
Health
Current Ratio0.66
Quick Ratio0.61
Debt / Equity0.03
Debt Ratio0.07
Net Debt$4.64M
Growth
Revenue 1Y Growth271.2%
Revenue 3Y CAGR21.6%
Revenue 5Y CAGR27.4%
Diluted EPS 1Y Growth-54.0%
Diluted EPS 3Y CAGR-16.8%
Diluted EPS 5Y CAGR-20.6%

Holders 124 institutions on file

InstitutionShares% of Shares OutValueChange QoQFiled
Blackrock, Inc. 1.90M 5.53% $16.77M +14.46% Nov 13, 2026
Bleichroeder Lp 1.63M 4.75% $14.39M 0.00% Nov 13, 2026
Alyeska Investment Group, L.p. 1.42M 4.15% $12.57M -28.91% Nov 16, 2026
Shay Capital Llc 1.24M 3.63% $10.99M +33.40% Nov 16, 2026
Northern Right Capital Management, L.p. 1.22M 3.56% $10.78M 0.00% Nov 16, 2026
Morgan Stanley 1.22M 3.54% $10.74M +3.16% Nov 25, 2026
Vanguard Capital Management Llc 1.18M 3.45% $10.46M +4.65% Nov 13, 2026
Cantor Fitzgerald, L. P. 784.14K 2.29% $6.93M +161.38% Nov 16, 2026
Geode Capital Management, Llc 725.96K 2.12% $6.42M +14.32% Nov 6, 2026
Private Advisor Group, Llc 587.27K 1.71% $5.19M +14.93% Nov 10, 2026
State Street Corp 526.43K 1.54% $4.65M +22.01% Nov 12, 2026
Ubs Group Ag 485.24K 1.42% $4.29M +50.14% Nov 10, 2026
Silvercrest Asset Management Group Llc 436.72K 1.27% $3.86M +80.07% Nov 16, 2026
Highmark Wealth Management Llc 330.38K 0.96% $2.92M +13.97% Nov 17, 2026
Peak6 Llc 327.40K 0.95% $2.89M +316.74% Nov 13, 2026

Insider and Congress trading All insider trades →

Insider trades · SEC Form 4

Latest 25 filings: 0 sales ($0) · 4 buys ($218K)
DateInsiderTypeSharesPriceValueOwned afterFiling
Sep 30, 2026
filed Oct 15
Frank Douglas Recker
Chief Executive Officer
Award 2.80K $8.93 $25K 2.80K SEC ↗
Sep 22, 2026
filed Oct 15
Frank Douglas Recker
Chief Executive Officer
Buy 9.25K $9.14 $84.5K 9.25K SEC ↗
Aug 17, 2026
filed Oct 15
Frank Douglas Recker
Chief Executive Officer
Award 880.00K — — 880.00K SEC ↗
Sep 8, 2026
filed Oct 13
Matthew J. Polimeni
Chief Legal Officer
— 0 — — 200.00K SEC ↗
Mar 31, 2026
filed Oct 13
Matthew J. Polimeni
Chief Legal Officer
— 0 $5.64 $0 7.47K SEC ↗
Sep 30, 2026
filed Oct 9
Ned Mavrommatis
Director
Award 2.24K $8.93 $20K 67.78K SEC ↗
Sep 30, 2026
filed Oct 9
James Craig Nixon
Director
Award 2.10K $8.93 $18.7K 86.62K SEC ↗
Sep 30, 2026
filed Oct 9
Frank A. Lonegro
Director
Award 2.80K $8.93 $25K 43.42K SEC ↗
Sep 30, 2026
filed Oct 9
Frank Douglas Recker
Chief Executive Officer
Award 2.80K $8.93 $25K 2.80K SEC ↗
Sep 30, 2026
filed Oct 9
Charles Parker Ferry
Director
Award 2.80K $8.93 $25K 4.87K SEC ↗

Historical data USD · newest first

DateOpenHighLowCloseChangeVolume