USMarketsToday.com
ENE

Eneva S.A.

ENEV3.SA · SAO · BR
$29.38+$0.66 ↗ 2.30%
At close: Nov 27, 6:05:44 PM -03
Volume
Market Cap$56.42B
Open$29.49
Trailing P/E64.43
Day Range$29.00–$30.24
Dividend Yield0.00%
52W Range$17.70–$32.42
EPS$0.62
Volume19.74M
Avg Volume13.20M
50-Day Avg$28.33
200-Day Avg$26.02
Why is ENEV3.SA moving?

ENEV3 rose as rate-sensitive Brazilian stocks, including utilities, rallied on hopes for lower interest rates and steadier public finances after Lula named Luiz Carlos Trabuco finance minister, the real strengthened and IPCA-15 inflation came in softer than expected.

Bull vs Bear

Every version →
▲ Bull caseManagement expects roughly half of the BRL 18 billion capex financed by year-end through receivables discounts, preferred shares and development banks. Eneva should enter 2027 with stronger cash and less dependence on capital markets, supporting an intense investment year with great liquidity.[1]
▼ Bear caseRates staying higher for longer make financing the LRCAP projects costlier. Only about 25% of capex was raised by September, CDI- and TLP-linked funding becomes pricier, and over US$1 billion remains unhedged while the real has depreciated more than 15%, raising fiscal and currency risk.[4]
Largest moves in the past year from daily prices
Oct 25, 2026
Sharp DropVolume 3.0× avgGap Down 14.3%
ENEV3.SA fell 15.3% to close at $26.67, opening 14.3% below the prior close. Intraday range of $4.50 ($23.00 – $27.50) spanned 19.6% in a volatile session. Volume reached 40.34M shares (3.0× the 20-day average). Recovered from the lows into the upper part of the range as dip buyers stepped in.
-15.3%
Oct 4, 2026
Big RallyNew 52-Week HighVolume 3.4× avgGap Up 5.3%
ENEV3.SA gained 5.4% to close at $30.26, opening 5.3% above the prior close. Intraday range of $1.72 ($29.97 – $31.69) spanned 5.7% in a volatile session. Volume reached 30.37M shares (3.4× the 20-day average). Set a new 52-week high of $31.69.
+5.4%
Jul 9, 2026
Big RallyGap Up 2.6%
ENEV3.SA gained 5.2% to close at $27.55, opening 2.6% above the prior close. Intraday range of $0.94 ($26.61 – $27.55) spanned 3.5% in a volatile session. Volume reached 16.18M shares (2.3× the 20-day average). Closed near the session high, with buyers in control into the close.
+5.2%
Mar 18, 2026
New 52-Week HighVolume 3.3× avg
ENEV3.SA gained 3.9% to close at $25.30. Intraday range of $1.88 ($24.11 – $25.99) spanned 7.8% in a volatile session. Volume reached 50.12M shares (3.3× the 20-day average). Set a new 52-week high of $25.99.
+3.9%
Mar 17, 2026
Big RallyNew 52-Week HighVolume 4.7× avg
ENEV3.SA gained 15.1% to close at $24.35. Intraday range of $3.94 ($20.91 – $24.85) spanned 18.8% in a volatile session. Volume reached 65.13M shares (4.7× the 20-day average). Set a new 52-week high of $24.85. Closed near the session high, with buyers in control into the close.
+15.1%
Feb 12, 2026
Big RallyGap Up 7.9%
ENEV3.SA gained 8.1% to close at $21.44, opening 7.9% above the prior close. Closed near the session high, with buyers in control into the close.
+8.1%
Feb 9, 2026
Sharp DropNew 52-Week LowVolume 5.8× avgGap Down 15.5%
ENEV3.SA fell 9.7% to close at $19.82, opening 15.5% below the prior close. Intraday range of $2.18 ($17.70 – $19.88) spanned 12.3% in a volatile session. Volume reached 111.43M shares (5.8× the 20-day average). Set a new 52-week low of $17.70. Recovered from the lows into the upper part of the range as dip buyers stepped in.
-9.7%
Jan 22, 2026
New 52-Week High
ENEV3.SA gained 0.5% to close at $22.49. Intraday range of $0.85 ($21.94 – $22.79) spanned 3.9% in a volatile session. Set a new 52-week high of $22.79.
+0.5%
Jan 21, 2026
New 52-Week High
ENEV3.SA gained 3.9% to close at $22.38. Intraday range of $0.80 ($21.74 – $22.54) spanned 3.7% in a volatile session. Volume reached 22.65M shares (1.8× the 20-day average). Set a new 52-week high of $22.54. Closed near the session high, with buyers in control into the close.
+3.9%
Jan 20, 2026
New 52-Week HighVolume 2.7× avg
ENEV3.SA gained 2.9% to close at $21.55. Intraday range of $0.80 ($20.94 – $21.74) spanned 3.8% in a volatile session. Volume reached 29.88M shares (2.7× the 20-day average). Set a new 52-week high of $21.74.
+2.9%
Jan 14, 2026
New 52-Week HighVolume 10.4× avg
ENEV3.SA fell 1.8% to close at $20.90. Intraday range of $0.91 ($20.59 – $21.50) spanned 4.4% in a volatile session. Volume reached 76.81M shares (10.4× the 20-day average). Set a new 52-week high of $21.50.
-1.8%
Jan 13, 2026
New 52-Week High
ENEV3.SA gained 4.0% to close at $21.29. Intraday range of $0.68 ($20.64 – $21.32) spanned 3.3% in a volatile session. Set a new 52-week high of $21.32. Closed near the session high, with buyers in control into the close.
+4.0%

Latest news

Earnings Earnings history → · Earnings calls →

Next report · Q4 FY2026

DateMar 5, 2027
EPS Est.—
Revenue Est.—
Avg 1-Day Move±—

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
Q3 FY2026 Nov 12, 2026 -$0.01 $0.14 +1,093.4% $2.33B $3.24B +39.2% —
Q2 FY2026 Aug 13, 2026 $0.02 $0.02 -17.0% $2.65B $4.00B +51.0% —
Q1 FY2026 May 14, 2026 $0.09 $0.26 +192.5% $2.98B $4.68B +56.9% —
Q4 FY2025 Mar 6, 2026 $0.16 $0.06 -58.9% $2.92B $6.05B +106.9% —
Q3 FY2025 Nov 12, 2025 $0.15 $0.28 +82.8% $3.70B $4.43B +19.5% —
Q2 FY2025 Aug 14, 2025 $0.23 $0.33 +42.2% $2.86B $3.51B +22.9% —
Q1 FY2025 May 15, 2025 $0.34 $0.43 +25.5% $2.43B $4.42B +82.4% —
Q4 FY2024 Mar 21, 2025 $0.17 -$0.55 -424.8% $2.52B $4.86B +92.7% —

Latest earnings analysis · Q3 FY2026 · Nov 12, 2026

Q3 2026 consolidated EBITDA was R$1.407 billion, down 23% year over year mainly due to the expiration of the PCS contract in Espírito Santo (a R$391 million drop). Year-to-date EBITDA exceeded R$4.3 billion. Offsets included R$340 million from the Vale LNG contract termination, R$135 million more from the gas trading desk, and R$50 million from Azulão 1. Operating cash flow was R$1.728 billion, the second highest in company history.
Leverage fell to 3.0x net debt/EBITDA from 3.2x in Q2, with net debt of R$17.3 billion and cash of R$6.8 billion. Average debt maturity is 6.1 years and IPCA exposure rose to 93% from 86%. The company completed the sales of Pesseng 2 and Itaqui, exiting coal, and now owns 100% of the Ceará and Espírito Santo hubs.
The three gas hubs will give Eneva 56 million cubic meters per day of regasification capacity, with room for about 2 GW of additional open-cycle plants. Contracted capacity is 2.9 GW at Sergipe, 1.7 GW at Ceará, and 0.7 GW at Espírito Santo, which is expected to start operating in August 2031. Contingent payments of up to R$149 million (Pesseng 2) and R$467 million (Itaqui) are tied to early contract starts.
Capex for the quarter was R$1.774 billion, with Azulão 2 at 93% progress and commercial operation planned for July 2027. The Parnaíba third liquefaction train is at 73% with COT planned for July 2027, and the Sergipe expansion is at 30% with contracts starting October 2028. The Ceará plant is at 31% and its terminal at 18%, with contracts starting August 2029.
Of the R$18 billion LRCAP capex, about 25% is funded, with another 25% targeted through development banks within roughly 40 days, for about 50% by year-end. Higher interest rates will raise financing costs, and roughly US$1 billion of US$1.5 billion in dollar exposure remains unhedged. Q4 LNG cargo volumes should be lower than Q3 but at wider spreads. Management called the 2027 LNG trading outlook positive but volatile, with no Sergipe dispatch before January 12.

Earnings call · Q3 FY2026 · Nov 12, 2026 · 8:00 AM EST

Full transcript →
≈ 31:26 · 39 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Lino Cançado

Good morning, everyone, thank you for joining us for Eneva's Q3 earnings conference call. I'll start with slide three with our most recent highlights. We began with solid results. Eneva's consolidated EBITDA reached BRL 1.4 billion, exceeding BRL 4.3 billion year-to-date. This result reinforces the progress we've made in our strategy and the resilience of our business models, which are capable of sustainably creating value for the Company through our assets and capabilities. During the period, five new regulated capacity contracts came into effect. These will secure new streams of fixed and variable revenue over the coming years for both new and existing assets in our portfolio.

The oil-fired power plants and the gas-fired power plants in Espírito Santo generated EBITDA of BRL 123 million during the period, a result that should be even higher in the coming months since several of these contracts were in effect for only part of the quarter. In addition, we reached an important milestone in implementing our business plan with the start of commercial operations for the Azulão I thermal power plant, the first power plant in the Azulão complex. In operation since early August, the plant was dispatched in real time on several occasions throughout the quarter. As a result, Azulão I contributed BRL 50 million in EBITDA in the third quarter and has already resumed continuous operation in the fourth quarter, reinforcing the importance of this asset to the power system and its potential to create value.

In the off-grid segment, EBITDA increased by BRL 316 million year-over-year, reflecting the receipt of BRL 340 million under the agreement to terminate the LNG supply contract with one of our customers. With this transaction, we fully recovered the capital invested in the first train of the liquefaction plant, and we've begun working to re-contract the available volume. If we're successful over the next 20 months, we will further increase the value generated by this asset. On-grid gas trading, in turn, delivered another quarter of extraordinary results, with EBITDA growing by BRL 135 million compared to the same period last year. The LNG cargo optimization transactions we executed generated BRL 202 million in the quarter. As a result, EBITDA from the gas trading desk has already reached BRL 453 million year-to-date, with more than 50% above the BRL 303 million reported for the whole of 2025.

Our operating cash flow reached the second-highest level in the Company's history, exceeding BRL 1.7 billion in the quarter, driven by the operating results and changes in working capital. As a result, total cash generation reached BRL 4.3 billion, supported by operating results, financing raised during the period, and proceeds from the sale of Pecém II. On the financial front, Eneva ended the quarter with leverage of 3x net debt to EBITDA, below the 3.2x recorded at the end of Q2 2026, leaving room for the Company's contracted growth. We also completed the first stage of another liability management transaction with the re-offering to the market of BRL 2.4 billion in tax-incentivized debentures and the early settlement of other instruments, aligning the Company's debt profile with the main index used to adjust our revenues, the IPCA inflation index, and extending its duration.

Finally, we took decisive steps to optimize our portfolio. From August to October, we completed the sales of Pecém II and Itaqui, bringing our coal-fired generation operations to a definitive end. We also acquired 100% ownership in two new natural gas hubs and determined the location of our hub in the Southeast, which will be developed in Espírito Santo in a SUDENE-incentivized area. With full control of the infrastructure at the Ceará and Espírito Santo hubs, we gain even greater flexibility to develop new opportunities and capture 100% of the value created. These milestones reflect the disciplined execution of our business plan and the strength of our investment thesis. We ended the quarter with an even more optimized portfolio, a growing base of long-term contracted revenues, and a capital structure suited to supporting our growth.

We remain committed to financial discipline and efficient capital allocation to continue creating value for our shareholders. Moving to slide five, I'd like to highlight completion of the divestment process for our coal-fired power plants, making Eneva's definitive exit from the segment. This milestone was the result of complementary transactions that were part of our strategy to enable and consolidate the new Ceará Hub while also repositioning our portfolio. We began planning in mid-2025 with the acquisition of the Jandaia portfolio of thermal power projects. From there, we developed the projects, secured equipment, and entered into a partnership to enable the gas supply solution. While this work allowed us to secure contracts for the Jandaia complex in LRCAP 2026, the capacity reserve auction. This is a group of new power plants that will be supplied by the regasification terminal we're developing at Pecém, forming the Ceará Hub.

Following our success, we ensured consolidation of a 100% ownership stake in the Ceará Hub through two transactions. The first was the sale of Pecém II, through which we received BRL 748 million and took over the contract for the port area. We also negotiated a contingent payment that could reach BRL 149 million if the plant's capacity contract starts ahead of schedule. The second transaction involved Itaqui and was structured as an asset swap. We received Diamante's remaining 50% stake in the Company responsible for developing the terminal, plus BRL 365 million in payment in exchange for the plant. As a result, our partner chose not to exercise its option to acquire a 30% stake. Here too, we negotiated a contingent payment linked to an early start, which could reach BRL 467 million.

As a result of these two moves, we now own 100% of the LNG terminal at Port of Pecém and Jandaia project. This allows us to focus our activities increasingly on the natural gas value chain, where we have structural competitive advantages, and we've also preserved potential for additional value through the contingent payments and further opportunities to optimize the hubs, as I'll discuss on the next slide. Moving to slide six, I'll present some of the latest developments related to our hubs. LRCAP 2026 expanded the scale of our gas hub model, which combines LNG terminals in strategic locations along the Brazilian coast, flexible thermal power generation, and gas trading. The Sergipe Hub was the first one we developed, starting with CELSE in 2022. Since then, we have connected the terminal to the gas pipeline network and established our gas trading desk.

Through gas trading on the pipeline network and LNG transactions, our desk has already added BRL 756 million in EBITDA since it began trading. Today, the Sergipe Hub has 2.9 GW of contracted capacity, including CELSE and the Porto de Sergipe II Thermal Power Plant, which won a contract in LRCAP 2026. The new plant will use the terminal's remaining capacity and can regasify up to 21 million cubic meters per day. In addition to our own thermal power complex, we also contracted the supply of 4.4 million cubic meters per day through flexible solutions for third parties over a 15-year period starting in 2028. The Ceará Hub, meanwhile, starts with 1.7 GW of contracted capacity, making the entire Jandaia complex viable. Its terminal will have a regasification capacity of 14 million cubic meters per day.

It will supply our plants and will also be connected to the local pipeline network. Here too, we signed a flexible contract for 1.3 million cubic meters per day for a 10-year period. Finally, we recently signed the contracts that secure development of our first gas hub in southeastern Brazil. The Espírito Santo Hub will be located in Port of Barra do Riacho in a SUDENE-incentivized area. In addition to the terminal, we will have a 100% ownership stake in the hub's thermal power projects. The Espírito Santo Hub already has 0.7 GW of contracted capacity, with operations expected to begin in August 2031. Its terminal will have a regasification capacity of 21 million cubic meters per day, with remaining capacity to supply new TPP projects and expand the reach of our gas trading activities.

With these three hubs, Eneva will have the largest regasification capacity in Brazil, 56 million cubic meters per day at terminals that are 100% owned by Eneva, located in tax-incentivized regions. In addition, this infrastructure can accommodate around two additional gigawatts of open-cycle TPP projects. Because these projects will use existing terminals, they will be highly competitive in future capacity auctions. In addition, we have expanded our ability to offer flexible solutions to third parties and created natural redundancy among the hubs, reducing operating risks and strengthening the flexibility and security of supply of our portfolio. Moving to slide seven, I will share the initial results from the Azulão 1 thermal power project. Azulão one is the first plant in the Azulão complex.

It operates under the Reservoir-to-Wire, or R2W, model, supplied by gas from our own fields in the region, and was the only new project contracted in LRCAP 2021 to enter commercial operation on schedule. This milestone reinforces the Company's ability to execute highly complex projects, particularly in a remote region with major logistical challenges, such as the interior of Amazonas state. With the start of its contract, the plant will contribute fixed revenues for the next 15 years, while also capturing attractive variable margins when dispatched, adding flexible dispatchable capacity to the system. Even with only partial quarter of operations, Azulão 1 has already demonstrated potential to create value. In the chart on the right, we show the plant's daily generation and the evolution of its CVU, or variable unit cost.

Shortly after starting operations, the plant was called upon by the ONS to dispatch in real time to provide capacity outside the merit order. in Q3 alone, following its operation date, the plant generated around 30 GWh in net electricity. Starting in October, the plant was again centrally dispatched, generating electricity for at least half of each day through early November, and resuming dispatch again this Monday. As a result, to date, the plant has already generated more than 80 GWh, nearly 3x the volume of the entire third quarter, compensated at CVU levels even higher than those of last quarter.

With only partial operations this quarter, the plant has already contributed BRL 50 million in EBITDA, BRL 20 million of which are in fixed margins, with only two months of revenue recognized, and BRL 30 million in variable margins, reflecting only the 32 GWh generated in the third quarter, as I mentioned. This is just the beginning of the plant's operations. It is the first project Eneva developed from scratch for a capacity reserve contract. It delivers exactly what the model is designed to provide, a stable base of contracted revenue and additional margins whenever the system needs power. Moving now to slide nine, I will go into more detail on the main factors that contributed to the change in EBITDA over the previous year's quarter. As I mentioned, consolidated EBITDA reached BRL 1,407,000,000 in Q3 2026, down 23% in the same quarter of 2025.

Among various offsetting factors, the decline was mainly due to the expiration of the PCS contract in its Pituá and Santa plants, whose EBITDA fell by BRL 391 million year-over-year. Briefly reviewing the main factors affecting the other business segments, in off-grid trading, EBITDA increased by BRL 316 million, driven by proceeds received from termination of the LNG supply contract with Vale. In oil-fired generation and Azulão I, the increase of BRL 110 million reflects the start of the plant's regulated capacity contracts. In gas-fired generation in Parnaíba and upstream, the decline of BRL 179 million reflected the lower level of dispatches during the period. At the Sergipe Hub, the decrease of BRL 128 million mainly reflected the non-cash reversal of the provision for riser insurance recorded in Q3 2025. These non-cash effects were partially offset by the BRL 135 million increase from the gas trading desk.

In Roraima, the decline resulted from scheduled maintenance outages during the quarter. Finally, in the last quarter in which coal-fired generation contributed to our results, the decline in EBITDA reflects the deconsolidation of Pecém II at the end of March and Itaqui at the end of August. Moving to slide 10, I will present the main changes in cash flow during the period. Operating cash flow reached BRL 1,728,000,000, the second-highest level in our history. In addition to operating performance, cash flow reflected a positive change in working capital and the reversal of non-cash effects recognized in EBITDA during the period. Investing cash flow represented an outflow of BRL 1,317,000,000, directed mainly to the Company's projects under construction. The expenditures partially offset by proceeds from the sale of Pecém II.

Financing cash flow, meanwhile, recorded a net inflow of BRL 3,848,000,000, supported by the funding raised during the period. As a result, Eneva ended the quarter with a cash balance of BRL 6,796,000,000, which was BRL 4.3 billion above the balance in the previous quarter, ensuring the liquidity needed for the Company's investment in the next quarters.

Marcelo Habibe

Moving now to slide 11, I present our leverage and debt profile. On the left, we show the evolution of the Company's net debt, which closed the third quarter at BRL 17.3 billion, with leverage at 3x net debt to EBITDA, maintaining headroom on the balance sheet. In the other charts, we show the quality of our debt, which closed the third quarter with an average maturity of 6.1 years, with 66% of maturities concentrated post-2030 and generally stable spread across periods. As a reflection of our most recent liability management initiative, we increased the Company's consolidated debt exposure to the IPCA, moving from 86% in June to 93% at the end of the third quarter, aligning our financial obligations with the primary index of our fixed revenues. With that, I hand over the floor to Andrea Monte, who will detail Eneva's investment and capital projects.

Andrea Monte

Thank you, Habibe. Moving now to slide 13, we highlight the investments made in the quarter, which totaled BRL 1,774,000,000, with nearly 90% dedicated to capital projects at the development and the Company's exploration and production activities. During the period, BRL 650 million were allocated to the developing projects contracted in the 2026 capacity reserve auction. The Azulão complex investments totaled BRL 507 million in the quarter, as the project approaches its completion in mid-2027. In upstream, investments totaled BRL 276 million, with BRL 175 million allocated to the development and connection of the Gavião Belo and Gavião Mateiro fields, and BRL 102 million allocated to exploration activities in Amazonas. Finally, regarding sustaining activities for the Company's operating assets, the BRL 190 million were primarily allocated to the Parnaíba 2 TPP and Jaguatirica 2 TPP, which underwent scheduled outages during the period.

Moving now to slide 15, I present updates on the Azulão 950 project. Among various achievements in the quarter, we highlight the oil flushing, setup transformer backfeed, and mechanical coupling of the gas turbine generator set for Azulão II. Furthermore, we completed the hydrotesting test for the Azulão II steam turbine boiler. Through activities carried out in the period, the project's physical progress advanced to 93%. The photos on the slide show updated aerial views of the complex, the plants, and the water intake system. As upcoming milestones, the gas turbine first fire and steam turbine turning gear will take place by the end of this year. In the first quarter of 2027, boiler and steam line blowing is scheduled, followed by the steam turbine first steam and combined cycle commissioning throughout the second quarter of 2027, preparing the plant for commercial operation in July 2027.

Moving now to slide 16, I share updates on the Parnaíba Liquefaction Plant Expansion Project, featuring the construction of the third liquefaction train. We have already completed detailed engineering, transport, and site delivery of the last OEM equipment, and we are wrapping up the delivery of the final BOP equipment still this November. With progress made during the period, the project's cumulative physical progress reached 73%. The slide photos show an updated general view of the site, the interconnecting pipe rack with the UTG, and the 3D layout of the gas scrubbing system. As upcoming milestones, I highlight mechanical completion scheduled for the first quarter of 2027 to enable commissioning and plant startup during the second quarter of 2027, with COD planned for July 2027. Moving now to slide 17, I share updates on the Sergipe Hub Expansion, one of our projects contracted under the 2026 LRCAP.

The quarter was marked by the construction progress, notably in earthworks and civil works execution. Consequently, the project's cumulative physical progress has reached 30%. Beyond physical advances, the qualification of the Sergipe II TPP project under REIDI was published, and that's an important milestone allowing tax incentives during asset deployment. The slide photos show piping installation for the electrical underground works, the setup of the contractor's permanent construction site, and progress in constructing the turbine generator and stack foundations for the first of five turbo generator units to be installed. As upcoming milestones, I highlight the start of the step-up transformer foundations in the fourth quarter of 2026. In 2027, BOP assembly is scheduled to begin in the second quarter and turbine assembly in the third quarter.

First fire for the first turbine is planned for the second quarter of 2028 to enable regulated contracts to start in October of that same year. Moving now to slide 18, I highlight updates on the Ceará Hub. Progress percentages and milestones presented on this slide reflect winning projects from the 2029 product. During the quarter, we continued advancing power plant and terminal projects. On the power plant front, we reached a cumulative physical progress of 31%. Among the quarter's achievements, we completed procurement for several key critical equipment and materials, including the generator circuit breaker and GRMS, the gas reduction management station. We started earthworks as shown in the site area view photos. Additionally, on the financial front, we secured project qualification under REIDI.

As upcoming milestones for the plants, I highlight the start of foundations in the first quarter of 2027, the start of turbine assembly in the second quarter of 2028, and the first fire of the first turbine in the second quarter of 2029, with the plant's first regulated contracts starting in August of that same year. At the terminal, cumulative physical progress reached 18%. Over the period, we started the gangway revamp for FSRU access alongside loading arms. We also began pile driving and concreting activities, and the terminal superstructure fabrication was initiated. As upcoming terminal milestones, I highlight civil works completion in the second quarter of 2027, electromechanical completion in the first quarter of 2028, and FSRU arrival in the third quarter of 2028, in line with the start of the Ceará TPP's first regulated contracts in August 2029.

With that, I hand the floor over to Felippe Valverde for the Q&A session.

Felippe Valverde

Thank you, Andrea. Good morning, everyone. We will now begin our Q&A session. I would like to remind you all that questions should be submitted in writing via the Zoom platform. First question from Daniel Travitzky from Safra. "Good morning. Could you please comment on the contracting of funding for the LRCAP? How can the recent rise in interest rate curves affect financing? Additionally, REIDI contracted for the whole CapEx."

Marcelo Habibe

Good morning, Daniel. Thank you for your question. Regarding the first part related to LRCAP financing. We announced BRL 18 billion CapEx. We have already taken, right after the auction, to date, the first six months, roughly BRL 4.5 billion stamped for LRCAP, BRL 3 billion recently for discount of receivables, and around BRL 1 billion, slightly more than BRL 1.5 billion of preferred shares.

This corresponds to around 25% of our CapEx. We are working here on the next 40 days until the end of this year to close a relevant percentage of other 25% of our CapEx through development banks. We believe that by the end of the year, we will have raised 50% of the funding or financing for the CapEx from attractive diversified sources, and we will enter 2027 with a more robust cash without depending on capital markets, without depending on third-party sources, so that we will have an intense year of investments, and we will have great liquidity. You have also asked about interests, if this will impact the costs of funding. Regarding preferred and receivable, we will have higher levels, and the costs of the financing will be higher.

What we see regarding development banks, we have a relation with [F&B], which is strongly linked to TLP, and [BNDES] and TMB is releasing 770 roughly depending. This financing will be more expensive if it were 6.5 or 6. Third question was related to hedging and CapEx with high exchange of out of the BRL 18 billion, it is likely $1.5 billion converted at the rate of 5.50, and that would be BRL 18 billion. So, $1.5 billion we had as part of the BRL 18 billion, almost $0.5 billion, around $400 million have been used. We still have around $1 billion more to go, and this has not been hedged. The first month of the implementation, when we invested over $400 million, we had a saving compared to the 5.5, which had been planned.

Now, the exchange rate is closer to that level. If the real goes on depreciating, we will consume part of that amount. We also have some US dollar revenues in this quarter. Over the year, actually, we have had good results in the gas trading desk, reallocating LNG loads, and they are 100% dollarized. With more depreciated Brazilian real, we will have a higher revenue in reais with the sales of these LNG loads, kind of offsetting the effect of the foreign exchange rate.

Felippe Valverde

A second question by Fillipe Andrade from Itaú. "Good morning. Could you please talk about LNG cargo? Are the LNG cargo volumes allocated for the fourth quarter comparable to those allocated for the third quarter, or are they higher?"

Lino Cançado

Good morning, Fillipe. Thank you for the question. Part of these LNG cargoes, we try to capture at the best moments.

The volumes, we have 20 a year, which we are entitled to, is not necessarily linear over the quarters. What we could say is that the volume of cargoes for the fourth quarter will be less than we have had in the third quarter, and we see bigger spreads for the fourth quarter compared to what we had in the third quarter. We will have a— In Brazilian reais, will be less than the third quarter. In March, we will disclose the results, and then we will see what the figures will look like.

Felippe Valverde

Last question by Guilherme Lima with Santander. "Good morning. Could you please talk on the current outlook for LNG cargo trading next year, considering the current JKM gas and Brent oil price spreads, as well as expectations for thermal dispatch at CELSE in 2027?

Lino Cançado

Good morning, Guilherme, and thanks for your question. When we look forward, for instance, the spread between the international LNG and Brent, it is very clear that there is a spread. These are two hyper-volatile commodities. If you look at the same basis point tomorrow, the numbers will be different. It is a positive expectation and forecast. Of course, there is cargo, but it is too soon to say whether we will dispatch next year in Sergipe. Today is November 12. We have not yet been called upon in November and December. We will not dispatch. It is 60 days of advance notice, so we know that at least before January 12, we will not dispatch. We will know essentially week-on-week whether we will start dispatching 60 days from that date.

Today, we do not know when it will happen, but we do know that we need to look at the cargoes to start reassigning the cargoes. What I can tell you is that the forecast is positive. This is all volatile, so things can change very quickly.

Felippe Valverde

Thank you. The next question comes from Raul Cavendish from XP. He says, "Can we expect third-party gas-fired power plants under the LRCAP to generate positive dispatch margins, given that the CVU established in the auction includes a premium on gas prices?"

Lino Cançado

Yes, we can expect positive margins. They are not large margins. They are going to be tight, but they are going to be positive. Honestly, our expectation is not to have a very large dispatch volume. What we want is a small margin, a small but positive margin, and this will result in significant positive numbers for us.

Felippe Valverde

Well, as we have no additional questions, this concludes our Q&A sessions for our earnings call. Thank you all for joining us, and we hope to see you again in the next call.

Historical data USD · newest first

DateOpenHighLowCloseChangeVolume