Engineers India Limited

ENGINERSIN.NS · NSE · India
$301.65+$10.50 ↗ 3.61%
At close: Nov 27, 3:29:59 PM IST
Volume
Market Cap$169.54B
Open$290.20
Trailing P/E18.90
Day Range$289.80–$302.00
Dividend Yield1.82%
52W Range$163.55–$323.65
EPS$12.04
Volume1.82M
Avg Volume5.98M
50-Day Avg$291.62
200-Day Avg$248.41

Bull vs Bear

Every version →
▲ Bull caseRevenue is forecast to expand 18.5% annually, well ahead of the Indian market's 11.1% and the construction industry's 12.3%. Revenue growth of 26.95% last year beat the three-year CAGR of 5.61%. Forecast ROE of 23.1% in three years suggests strong returns on a growing order book.[1][7]
▼ Bear caseEarnings are forecast to grow only 7.7% annually, far below the Indian market's 17.3% and the construction sector's 21.4%. EPS growth of 5.7% is weaker still. Revenue growth falls short of the high-growth threshold of 20%, and the growth score is only 3/6.[1]
Largest moves in the past year from daily prices
Nov 1, 2026
Big RallyVolume 8.9× avgGap Up 3.3%
ENGINERSIN.NS gained 15.0% to close at $289.65, opening 3.3% above the prior close. Intraday range of $33.90 ($260.00 – $293.90) spanned 13.0% in a volatile session. Volume reached 35.88M shares (8.9× the 20-day average). Closed near the session high, with buyers in control into the close.
+15.0%
Oct 7, 2026
Sharp Drop
ENGINERSIN.NS fell 6.3% to close at $289.00. Intraday range of $30.05 ($277.75 – $307.80) spanned 10.8% in a volatile session. Volume reached 14.48M shares (2.3× the 20-day average).
-6.3%
Sep 24, 2026
Big RallyNew 52-Week High
ENGINERSIN.NS gained 6.4% to close at $315.65. Intraday range of $23.85 ($295.05 – $318.90) spanned 8.1% in a volatile session. Volume reached 19.62M shares (2.5× the 20-day average). Set a new 52-week high of $318.90. Closed near the session high, with buyers in control into the close.
+6.4%
Sep 20, 2026
Big Rally
ENGINERSIN.NS gained 7.1% to close at $285.25. Intraday range of $18.65 ($268.25 – $286.90) spanned 7.0% in a volatile session. Volume reached 10.64M shares (1.8× the 20-day average). Closed near the session high, with buyers in control into the close.
+7.1%
Aug 31, 2026
Big RallyNew 52-Week HighVolume 18.7× avg
ENGINERSIN.NS gained 6.9% to close at $280.05. Intraday range of $29.20 ($260.45 – $289.65) spanned 11.2% in a volatile session. Volume reached 57.54M shares (18.7× the 20-day average). Set a new 52-week high of $289.65.
+6.9%
Aug 4, 2026
Big RallyVolume 6.4× avg
ENGINERSIN.NS gained 6.8% to close at $240.27. Intraday range of $15.45 ($226.45 – $241.90) spanned 6.8% in a volatile session. Volume reached 8.57M shares (6.4× the 20-day average). Closed near the session high, with buyers in control into the close.
+6.8%
May 21, 2026
Sharp DropVolume 4.0× avgGap Down 6.9%
ENGINERSIN.NS fell 8.9% to close at $216.00, opening 6.9% below the prior close. Intraday range of $12.55 ($213.00 – $225.55) spanned 5.9% in a volatile session. Volume reached 19.34M shares (4.0× the 20-day average).
-8.9%
Mar 31, 2026
Big RallyGap Up 5.1%
ENGINERSIN.NS gained 10.3% to close at $200.98, opening 5.1% above the prior close. Intraday range of $13.53 ($188.46 – $201.99) spanned 7.2% in a volatile session. Volume reached 7.25M shares (2.2× the 20-day average). Closed near the session high, with buyers in control into the close.
+10.3%
Mar 1, 2026
Sharp DropGap Down 6.2%
ENGINERSIN.NS fell 4.2% to close at $212.47, opening 6.2% below the prior close. Intraday range of $11.70 ($207.06 – $218.76) spanned 5.7% in a volatile session.
-4.2%
Feb 15, 2026
Big RallyNew 52-Week HighVolume 14.1× avg
ENGINERSIN.NS gained 12.4% to close at $226.62. Intraday range of $36.43 ($200.22 – $236.65) spanned 18.2% in a volatile session. Volume reached 125.65M shares (14.1× the 20-day average). Set a new 52-week high of $236.65.
+12.4%
Feb 12, 2026
Big RallyNew 52-Week HighVolume 57.2× avgGap Up 10.1%
ENGINERSIN.NS gained 11.5% to close at $201.67, opening 10.1% above the prior close. Intraday range of $12.85 ($197.15 – $210.00) spanned 6.5% in a volatile session. Volume reached 134.02M shares (57.2× the 20-day average). Set a new 52-week high of $210.00.
+11.5%
Dec 7, 2025
Sharp Drop
ENGINERSIN.NS fell 6.3% to close at $189.84. Intraday range of $14.10 ($188.50 – $202.60) spanned 7.5% in a volatile session. Volume reached 2.47M shares (1.6× the 20-day average). Closed near the day's low as sellers pressed into the close.
-6.3%

Latest news

Research

Independent reports

Engineers India Limited (EIL) — Equity Research
Dalal & Broacha Stock Broking Pvt Ltd·Nov 1, 2026 bullish

The report sees earnings growth supported by a record order book, a high-margin consultancy mix, improving turnkey execution and new overseas and specialist-sector opportunities. It forecasts FY27–FY29 standalone revenue, EBITDA and PAT CAGRs of 24%, 26% and 22%, respectively, and values the shares at 23x FY29 EPS for a Rs 393 target.

Engineers India Ltd. (ENGIND) — Q2FY27 Result Update
ICICI Securities — Retail Equity Research (ICICI Direct)·Nov 1, 2026 bullish

The report expects a consultancy-heavy order book, continued order inflows and margin improvement to underpin multi-year revenue visibility, with diversification providing additional growth opportunities. It forecasts FY26–FY28 revenue and PAT CAGRs of 13.7% and 17.4% and recommends BUY at 23x FY28 EPS.

Engineers India (ENGR IN) — Q2FY27 Result Update
Prabhudas Lilladher Pvt. Ltd. (PL Research)·Oct 30, 2026 bullish

The report attributes growth prospects to robust order inflows, a consultancy-led order book, recovering turnkey execution and opportunities in overseas markets and newer sectors. It maintains BUY and derives a Rs 328 target using a sum-of-the-parts valuation, including 24x consultancy and 10x turnkey earnings.

Engineers India Limited (EIL) — Management Meet Note
Dalal & Broacha Stock Broking Pvt Ltd·Sep 29, 2026 bullish

The management-meet report argues that a record order book, higher-margin consultancy, international expansion and diversification can support stronger execution and earnings. It forecasts FY27–FY29 standalone revenue, EBITDA and PAT CAGRs of 25%, 32% and 26%, and values the stock at 23x FY29 EPS for a Rs 400 target.

Engineers India Limited (EIL) — Q1FY27 Result Update
Dalal & Broacha Stock Broking Pvt Ltd·Aug 17, 2026 bullish

The report sees a structurally stronger earnings cycle as consultancy gains share and turnkey execution recovers, supported by a large order book, overseas business and emerging opportunities. It forecasts FY26–FY28 revenue, EBITDA and PAT CAGRs of 19%, 16% and 13%, and sets a Rs 307 target at 21x FY28 EPS.

Engineers India — Q1FY27 Results Update
ICICI Securities Limited·Aug 14, 2026 bullish

The report links medium-term visibility and potential margin improvement to a consultancy-heavy backlog, a strong tender pipeline and higher consultancy order inflows, while noting execution and JV risks. It maintains BUY with a Rs 290 target based on 30x FY28 core earnings.

Earnings Earnings history →

Next report · Q3 FY2027

DateFeb 12, 2027
EPS Est.—
Revenue Est.—
Avg 1-Day Move±—

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
Q2 FY2027 Oct 30, 2026 — $3.16 — $10.11B $7.93B -21.6% —
Q1 FY2027 Aug 14, 2026 — $2.37 — $9.85B $8.08B -18.0% —
Q4 FY2026 May 22, 2026 — $3.10 — $11.59B $8.99B -22.4% —
Q3 FY2026 Feb 13, 2026 — $2.40 — $9.52B $9.51B 0.0% —
Q1 FY2026 Aug 18, 2025 — $1.10 — $8.17B $8.57B +4.9% —
Q4 FY2025 Jun 3, 2025 — $4.98 — $9.55B $9.91B +3.7% —
Q3 FY2025 Feb 10, 2025 $1.50 $1.60 +6.7% $8.52B $7.50B -11.9% —
Q2 FY2025 Oct 30, 2024 $1.70 $1.77 +4.1% $8.38B $6.76B -19.3% —

Latest earnings analysis · Q2 FY2027 · Oct 30, 2026

Q2 FY27 turnover was Rs. 802 crore (consultancy Rs. 594 crore, turnkey Rs. 208 crore). PBT rose about 58% to Rs. 229 crore from Q1, PAT rose 65% to Rs. 180 crore, EPS was Rs. 3.20, and EBITDA margin including other income rose to 27% from 19%.
Order book hit an all-time high of Rs. 20,421 crore versus Rs. 14,424 crore at June 30. H1 order inflow was Rs. 7,428 crore (Rs. 5,762 crore consultancy, Rs. 1,666 crore turnkey), and inflow has reached about Rs. 8,100 crore to date, with management expecting to cross the Rs. 8,000 crore target and possibly revise guidance upward.
H1 revenue mix shifted to 68% consultancy and 32% turnkey from 47% and 53% a year earlier. Consultancy segment margin was about 30% in Q2 with no one-time items and about 28% in H1. Management guided to at least 25% for the full year, with upside likely, while turnkey margins were around 4-5% on new projects versus a normal 6-7%.
Forward guidance is FY27 revenue of about Rs. 4,200 crore, with turnkey expected to ramp up to at least 40% of H2 revenue. Management expects about 10% or higher revenue growth in FY28 based on the order book, EBITDA margin of 15-16%, and healthier bottom line from the Dangote project, which is ramping up and runs four to five years.
The Middle East remains unstable, with only about Rs. 500-600 crore of orders from there, while Africa has offset this. Nuclear orders are expected only next fiscal year, and the order book is about 75% consultancy and about 55-60% overseas. Other income of Rs. 65 crore included NRL and CIL dividends, and Ramagundam fertilizer contributed Rs. 20 crore profit in Q2 and Rs. 63 crore in H1.

Earnings call · Q2 FY2027 · Oct 30, 2026 · 6:30 AM EDT

Full transcript →
≈ 1:01:11 · 231 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Operator

Welcome to [audio distortion] Q2 conference call. DAM Capital Advisors Limited. As a reminder all participants will be in the listen only mode. There will be an opportunity for [audio distortion] after the. [audio distortion] Should you [audio distortion] during the conference call, an operator, then [audio distortion] zero phone. That this conference recorded. Over to Mr. Kishan Gopal from DAM Capital Advisors. Thanks sir.

Kishan Gopal Mundhra

A very good evening to [audio distortion] Thank you for joining to Engineers India FY27 conference call. From the management, Engineers India being represented by Sanjay Jindal, who is Director Finance, Mr. Shubham Borade, who is the [audio distortion] company and Mr. Vivek Midha, Chief General Manager. With that, I would [audio distortion] the conference to the management for opening remarks. We will have a Q&A session. Over to you, sir.

Sanjay Jindal

Thank you, Mr. Kishan Gopal ji. Good afternoon, everybody, and a warm welcome to all the investors who are attending the investor call. We have declared our financial results for the second quarter ended 30th September 2026 today. Company's order book position has reached its all-time high and stands at INR 20,421 crore as on 30th September 2026, as compared to INR 14,424 crore as on 30th June 2026. Order inflow in year up to second quarter of financial year 2026/27 stands at INR 7,428 crore. On the standalone results, we have declared results of quarter and half year ended September 2026 on 30th October 2026. As regard to financial performance for the three month ended September 2026, the company has registered a turnover of INR 802 crore, which is to INR 800 crore in the first quarter of financial year 2026/27.

Turnover from Consultancy & Engineering segments stood at INR 594 crore and from the Turnkey segment at INR 208 crore. During the current quarter ended September 2026, the company has recorded profit before tax of INR 229 crore in comparison to INR 145 crore during the first quarter of financial year 2026/27, showing an increase of around 58% in profit before tax and profit after tax of INR 180 crore in comparison to INR 109 crore during the first quarter of 2026/27, showing an increase of 65% increase in PAT. Notably, EPS for the quarter ended September 2026 stood at INR 3.20, which is June 2026 at INR 1.93 against the face value of INR 5 per share. Operating margin during the second quarter of financial year 2026/27 stood at INR 152 crore, that is 19%, which is INR 108, that is 14% during the first quarter of 2026/27.

It means our operating margin have increased from 14% to 19% in the second quarter of current year. EBITDA, including other income of company during second quarter 2026 stood at around INR 240 crore, that is EBITDA margin 27% in comparison to INR 155 crore EBITDA margin 19% during the first quarter of 2026/2027. It means from the first quarter to second quarter, our EBITDA margin have increased from 19% to 27%. On the half yearly front, up to 30th September 2026, the company recorded profit before tax of INR 375 crore in comparison to INR 243 crore and profit after tax of INR 288 crore against the INR 185 crore up to September 2025, showing an increase of 54% in profit before tax and around 56% increase in PAT.

Operating margin for the first half year of 2026/2027 stood at around 16% in comparison to 9% in the first half year of 2025/2026. EBITDA of the company for the first half year ended September 2026 stood at around INR 395 crore, EBITDA margin 23% in comparison to INR 265 crore, EBITDA margin 14% for the first [audio distortion]

Operator

Ladies and gentlemen, management line seems to be disconnected. Please wait while we reconnect them. Ladies and gentlemen, management line has been reconnected. Thank you for patiently holding. Over to you, sir.

Sanjay Jindal

I will start again from the EBITDA. EBITDA including other income of the company for the first half year ended 30th September 2026 stood at around INR 395 crore, which was INR 265 crore for the first half year ended 30th September 2025. Our EBITDA margin have increased from 14% to 23% in the same case. In the first half year of 2026/2027, the company achieved a turnover of INR 1,603 crore in comparison to INR 1,758 crore in the first half year of 2025/2026, with turnover from Consultancy & Engineering segment amounting to INR 1,093 crore and INR 510 crore in Turnkey segment. Notably, in the first half of 2026/2027, our revenue mix has been changed from 47% in Consultancy segment and 53% in Turnkey segment in the first half year of financial year 2025/2026 to 68% in Consultancy segment and 32% in Turnkey segment.

The Consultancy segment has higher margin as compared to Turnkey segment. The company is maintaining a healthy earning per share in the first year of 26/27. The earning per share stood at INR 5.13 per share for the first half year ended September 2026 in comparison to INR 3.29 per share for the first half ended September 30, 2025. This is against the face value of INR 5 per share. On the consolidated front, the company earned a profit of INR 197 crore for the quarter ended September 30, 2026 in comparison to profit of INR 158 crore for the quarter ended June 30, 2026. For the half year ended September 2026, the profit stood at INR 355 crore in comparison to profit of INR 149 crore for the first half year ended September 30, 2025. Thank you and over to Kishan Gopal.

Kishan Gopal Mundhra

Hello?

Operator

Yes sir, you are audible.

Kishan Gopal Mundhra

Yeah, okay. We can start question answer.

Operator

Sure, sir. Thank you very much. We will now begin the question and answer session. Anyone who wishes to ask a question may press star and one on the touch-tone telephone. If you wish to remove yourself from the question queue, you may press star and two. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles. The first question comes from the line of Mohit Kumar from ICICI Securities. Please go ahead.

Mohit Kumar

Yes, good afternoon, sir, and congratulations on a very, very good set of numbers. My first question is, was there any one-off in the Consultancy segment? The margins are pretty, margins are 30% compared to our usual run rate of 23%-24%.

Sanjay Jindal

Yeah, you are right, sir. For this second quarter, this is around 30%.

Mohit Kumar

INR 30 crore. So, if we adjust the INR 30 crore for-

Sanjay Jindal

30%.

Mohit Kumar

No, no, sir. My question is, sir, was there any one-off for anything you have booked for the past period in this quarter? Is that the reason why the consultancy income is very high, or is it that everything is as usual?

Sanjay Jindal

No, sir. This time we have changed the business mix. In the last first half year, our Consultancy segment was 47%. Execution was 47%. Now this time, turnover from the Consultancy segment is 68%. From the LSTK segment is 32%. Since margins in the Consultancy segments are higher, therefore profit is also higher. As such, there is no one-time item.

Mohit Kumar

Is it fair to expect that this 30%, most of it is sustainable going forward? Is the number which one should look at for the maybe going forward, given that the mix has changed?

Sanjay Jindal

Definitely, we will maintain our 24%-25% segment profit in the Consultancy segment on overall basis, yearly basis.

Mohit Kumar

Understood. My second question is, sir, of course, the presentation has not been uploaded as of now. Is it possible to give us the breakup of order inflow for the quarter between the two segments?

Sanjay Jindal

It is uploaded, but I will tell you the figure. Our order inflow for the current first half is INR 7,428 crore.

Mohit Kumar

Yes.

Sanjay Jindal

Out of which, INR 5,762 crore is from Consultancy segment, and balance INR 1,666 crore is from LSTK segment.

Mohit Kumar

Understood, sir. Understood. My third question, sir, given the fact that, of course, you have already, I think, around INR 7,400 crore as we speak, for the order inflow. If I remember correctly, I think we had guided for INR 8,000 crore order inflow. Would you like to revise our target and-

Sanjay Jindal

Definitely, sir, we will cross the figure of INR 8,000 crore.

Mohit Kumar

Can you give the new guidance, the new guidance?

Sanjay Jindal

No, no. We are putting all of our efforts to cross the figure of INR 8,000 crore.

Mohit Kumar

Okay, understood.

Sanjay Jindal

I hope next time we will revise the guidance on the count of this, if required.

Mohit Kumar

Understood. My last question, sir, how is the pipeline developing in the Middle East? Are you seeing some recovery? I think things are stabilizing now. Are you hopeful that we will be able to book some order inflow in this fiscal year?

Sanjay Jindal

[crosstalk]

Vivek Midha

I am just responding to this. Gentlemen, you know that the situation is not all right in the Middle East. Still, that situation is on. We will have to be hopeful on this. Businesses, we are doing a little bit well, and we are progressing and bidding for the various jobs. In Saudi, we are still waiting because the situation is not good there, because maybe attacks are still there. Let us hope for this. However, we have recovered this from the Africa side. Let us see how it goes, because the situation is not normal in Middle East at this point of time. We will have to wait for some more months.

Mohit Kumar

Understood, sir. Understood, sir. Thank you, and all the best, sir. Thank you.

Operator

Thank you. The next question comes from the line of Sanchita Sood from RoboCapital. Please go ahead.

Sanchita Sood

Yes. Thank you for the opportunity. Sir, my first question was that, what kind of revenue growth can we see for this financial year and FY 2028 as well? As well as some guidance that you could give on what kind of EBITDA margins we will be doing these two years.

Vivek Midha

We are taking into consideration the current order book. We have already given that we will be achieving a revenue of around INR 4,200 during the current financial year. Going forward, definitely we are taking into consideration the order book, the further growth of around 10% in the revenue side.

Sanchita Sood

Okay, got it. Sir, my second question is, what kind of order inflows can we see in H2 of this year and next year?

Sanjay Jindal

Mr. Vivek, [inaudible]

Vivek Midha

I am just responding to sir. We have already secured, you have seen that this is INR 7,400 crores we have secured in this quarter. We have, in fact, certain more orders have been received. As of today, we stand at INR 8,100 crores. As of today, we stand at INR 8,100 crores. Let us hope that we will achieve some of the more business out there. We are working towards it. Let us see how it goes. We still have six months to go.

Sanchita Sood

All right, understood. Thank you. That is all from my end.

Operator

Thank you. A reminder for all the participants. In order to ask a question, you may press star and one on your touch-tone telephone. A reminder for all the participants that in order to ask a question, you may press star and one on your touch-tone telephone. The next question comes from the line of Deep Sanghavi from Dalal & Broacha Stock Broking Private Limited. Please go ahead.

Deep Sanghavi

Yeah, thank you. Thank you so much for the question, and congratulations on a great set of numbers. My first question would be that you had guided for INR 4,200 crores of revenue for FY27, right? With a 55%-45% split.

Sanjay Jindal

Around INR 4,200, INR 4,300.

Deep Sanghavi

Yeah, correct. That come with a 55%-45% split, right? Turnkey, Consultancy and Turnkey, on an average, on approx basis. That comes out to almost INR 1,900 crores of revenue from Turnkey in the first two quarters.

Sanjay Jindal

This time, Consultancy segment is more and LSTK segment is lower because most of the big tickets project of LSTK segment is already over.

Deep Sanghavi

Okay.

Sanjay Jindal

New projects have been started, and it will take some time to get full revenue from these LSTK segments. In the current year, we expect that Consultancy segment will be more. It will be around more than 60% on overall basis.

Deep Sanghavi

More than 60%, is that right?

Sanjay Jindal

Around 60%.

Deep Sanghavi

Okay. Sir, just a follow-up to that question. Why are the margins at 4.3% for turnkey? Is there any reason for that or?

Sanjay Jindal

No, it is always-

Deep Sanghavi

Because the range, it generally is in the range of 6%-7%, right? That is why I am asking.

Sanjay Jindal

6%-7% are okay, but generally, in the new projects, cost progress are not there. Therefore, profits are little, 4%-5% behind. But as the project gets momentum, the profit will also get more.

Deep Sanghavi

Right. Sir, you had said that there are a lot of turnkey projects which will have faster execution in H2. Is that still the case? Are you expecting the execution to ramp up in H2?

Sanjay Jindal

Definitely, our execution in LSTK segment should ramp up because in the first half, it is 32% from the LSTK segment, and we are expecting it should be around at least 40% from the LSTK segment.

Deep Sanghavi

Right. Sir, the second question would be, it is on the nuclear segment. Just hypothetically taking a INR 10,000 crore nuclear project, a significant portion of CapEx would be towards nuclear reactor and the main, the nuclear island, right? Currently, we have opportunities in BOP and environmental studies, if I am not wrong. Could you give us a broad sense of how much of the project cost is addressable to EIL and BOP and environmental studies?

Vivek Midha

No, it's like this. I am just responding. On the nuclear side, we know that there are a lot of opportunities coming, but all of them are the initial stages. They are in the study phases. Some of them are in the environmental impact assessment study, some of them would be the initial phases of tendering. This phase would take some time, and time has to come because many of the project locations are still being finalized. We are working towards it. It will be a significant amount, but it will not be in this financial year. It will take some time, probably a year or so. Next financial year, we can see some good orders from there in this segment because we are also establishing our own systems in-house.

We have created verticals to handle all these things and sprucing up our manpower with all the kind of trainings and experiences. We are making them ready for all these jobs, and we are bidding for some of the assignments.

Deep Sanghavi

But sir, how much would, or like, for let's say-

Vivek Midha

We cannot tell you the figures. No, no. It is very difficult to tell the figures at this point of time. Depending on what kind of job is going to come and how much work we are going to come. It could be a detailed engineering assignment, could be a smaller assignment. If we get a bigger assignment, then the value will be making. So, it is very difficult to tell that.

Deep Sanghavi

No, I just wanted to understand if EIL will only do like BOP and environmental studies, or will there be a larger scope for the-

Vivek Midha

No, no. It is, it is EIL will be doing the engineering services, which will be balance of plant engineering consultancy and something related to construction supervision also, kind of engineering and supervision role, owner's engineers role, you can say.

Deep Sanghavi

Right. Okay, okay. Thank you. And the last question would be, are there any change orders or any provision write-backs you are expecting for this fiscal or the next fiscal?

Sanjay Jindal

Definitely, we have lots of change order which we are negotiating with our clients, and it is expected that all these change order will be settled in this financial.

Deep Sanghavi

Yeah. Okay, thank you. I will join back the queue.

Operator

Thank you. The next question comes from the line of Prateek Dugar from Intelsense. Please go ahead.

Prateek Dugar

Am I audible?

Operator

Yes, sir, you are audible.

Prateek Dugar

Okay. Thank you for the question, and congratulations to the management on a good set of numbers. Sir, actually, I wanted to ask about the consultancy division only. If you look at the specific margins for the consultancy division, what we are seeing that it has come at around 30%. There was this question by another participant also. Is this a normal course of margin that we can expect going forward, or was there a one-off in this time?

Sanjay Jindal

First of all, in this quarter, there is no one-time payment, no one-time payment or settlement. On the half-yearly basis, it is 27.7%. On overall basis, we are expecting that it will be settled around 25%. We are sure that we will maintain the figure of 25% in the consultancy sector because in the projects, the revenues are always cyclic. On the conservative side, we are ensuring that we will maintain our traditional margin of 25%. But definitely in this quarter, it is 30% without any one-time.

Prateek Dugar

Okay. Sir, regarding specifics of the depository orders that we had got, I think last FY 2026, the depository order execution had begun along with the Dangote order execution. FY 2027 is where Dangote should ramp up and depository orders should peak. With that mix, and obviously our overseas consultancy order would also again sort of accelerate in FY 2027. Wouldn't these specific orders like add up to the margin and the guidance of 25% you are giving? Is it on the lower side, or you are saying that 25% would be what one should expect and there's no upside to that?

Sanjay Jindal

No, definitely there is on the upside because we have lots of overseas orders which are under execution. Basically, it depends on the cost progress of the projects. 25% is the minimum figure I have given on the conservative side, because we are sitting on the half-year results. On the half-year basis, it is around 28% in the first half figure. So, I am saying we will definitely maintain our traditional figure of 25%, and definitely this time, this figure will be higher than the 25%. But exactly, I cannot commit that it will be 30%.

Prateek Dugar

And sir, if I extend-

Sanjay Jindal

Definitely, it will be higher than 25%.

Prateek Dugar

And sir, if I extend my view to say, first half of FY 2028, where Dangote would sort of be peaking, and we would be having a higher run rate on the revenue side as well. So, by H1 of FY 2028, do we see a meaningful inflection in the bottom line for the company?

Sanjay Jindal

Definitely, our bottom line will be healthier, more and more healthier in the coming years, because we are having order book of more than 20,000, and we will yielding more and more revenue, and our bottom line will be healthier in the coming years.

Prateek Dugar

Okay, sir. Sir, depository orders that we have, what should be the margins on specifically on the depository orders? And if you can explain, like, why do we categorize this at a difference? I mean, why do we not take it as a consultancy order only? Why is it categorized differently?

Sanjay Jindal

In the Depository segment, only fees part is coming in the top line. But in the Depository segment, all the plant and machinery cost and material cost is coming in the top line. It is just like LSTK business. So, that is why in the Depository segment, profit margin is around 7%.

Prateek Dugar

Okay. So, once the depository starts tapering off in H1 of FY 2028, then I think margins would again sort of be better for that period, because the lower margin segment is coming off, and Dangote would be peaking at that time.

Sanjay Jindal

We are keeping balance between the Consultancy segment and the Depository segment. In the Consultancy segment, we are focusing about 60%-65%, and balance from the LSTK segment. So, it is a balancing game. We are not leaving LSTK business totally.

Prateek Dugar

Okay. Thank you, sir. That will be all from my end. Congratulations once again.

Sanjay Jindal

Thank you.

Operator

Thank you. The next question comes from the line of Amit Anwani from PL Capital. Please go ahead.

Amit Anwani

Hi, sir. Thank you. First of all, congratulations for very good numbers.

Sanjay Jindal

Thank you, sir.

Amit Anwani

The first question, sir, in terms of order pipeline again. This year we did a very commendable job. We are already there in terms of the guidance which we had given, and we will be easily surpassing. There was a major contribution to this from the overseas consultancy, especially the Dangote orders, which we won. We just wanted to understand the order pipeline outside India, geography-wise. Are we looking for more large, lumpy orders in the pipeline in next 12-18 months? Second, what one should look for the order guidance for next year? Are we going to continue this run rate of INR 8,000 crore plus for next year after that?

Sanjay Jindal

Mr. Vivek Midha.

Vivek Midha

Amit, it's like this. We are bidding for a number of the projects, and you are seeing that something comes up in between. It's very difficult to tell you that which order is going to come, but we are bidding for number of projects all across the world, and in various territories also, and including India also. We are hopeful that we should be able to get more business out of it. As I already told you on the call that we have already reached INR 8,100 crore. Next year, naturally, it would remain at least INR 8,100 crore we'll definitely achieve, because we have been consistently maintaining almost at the same range. If everything goes on, politically everything remains same, and market remains the same, CapEx are invested, then we'll continue to grow and continue to improve our business opportunity.

Amit Anwani

Right. Second, in Middle East, we were in some long-term agreement with Aramco and expecting some orders. Any update on that, and what is the Middle East order book and-

Vivek Midha

Unfortunately, situation is no at this point of time. It is always published, it is already published all across. The situation is not stable there. We have not a major order we have anticipated, but we are bidding for various contracts out there. So, if something comes up, we will update you towards the end of this next financial. Sorry, end of this financial year, probably next quarter. By the time, hopefully, the things should stabilize or the war should stop. But as of now, there is lot of issues there in houses.

Amit Anwani

All right. Lastly, in terms of guidance for next year, we said, well, 10% plus. I think the order wins are very strong. Is it again a conservative guidance for next financial years also? I think we can-

Vivek Midha

Right now, it is conservative, but we are going to improve that. Maybe we will improve it. It depends on the situation in couple of years.

Amit Anwani

Right. Expectation is that the consultancy will still continue to be more than the turnkey. Last question on the-

Vivek Midha

Normally, it is likely it is always somewhere around 60%, 65%, and 60/40 ratio remains. It will always remain in that range somewhere. Sometimes you get a big ticket once, then the consultancy portion becomes heavy. Then sometimes you get a less figure, but it should always be in this range. Sometimes it is 60, sometimes it is 50. So, definitely it will be that range.

Amit Anwani

Lastly, on the other income, this other income number was higher this quarter at INR 65 crores. What contributed to that?

Sanjay Jindal

In the other income, there is a dividend from the NRL to the tune of INR 21 crores, and another dividend of INR 11 crores from the CEIL. Balance is regular income. Income on our surplus funds, rental income, and some other miscellaneous income.

Amit Anwani

Understood. And Rama-

Sanjay Jindal

Especially there is-

Amit Anwani

Yeah.

Sanjay Jindal

Especially there is increase on account of dividend from the CEIL and NRL.

Amit Anwani

Will that continue, or how is the dividend looking like for this full year?

Sanjay Jindal

We are receiving dividend on continuous basis from the NRL and CEIL.

Amit Anwani

Okay. Lastly, sir, Ramagundam, how is the situation there? I can see the numbers there also has been better, so outlook there would help. Thank you.

Sanjay Jindal

Definitely Ramagundam is doing better. In this quarter, we have got the profit of INR 20 crores, and in the first quarter it was INR 42 crores, and total profit up to this period, half year, INR 63 crores. So, we are expecting more and more good news from the RFCL.

Amit Anwani

Understood, sir. Thank you, sir. Thank you so much.

Operator

Thank you. The next question comes from the line of P. Jha, an individual investor. Please go ahead.

P. Jha

Thank you. First of all, some extraordinary numbers.

Sanjay Jindal

Thank you.

P. Jha

I would like to understand the domestic possibilities, especially in coal gasification and in green hydrogen, and in your 2G refinery, besides any other storage of crude. These, if you can throw light respectively on them for this current year. Yes, please, as you decide.

Vivek Midha

Yes, sir, with respect to the coal gasification, after this Government of India's initiative of additional INR 34,000, this funding for this VGF funding, there are studies which are on this. We are bidding for a couple of projects, the major projects also. Let's see how it realizes. Various studies we are bidding, and some of the studies we are also carrying on. One work we are carrying out for NTPC. That is the current situation of it. Let's see towards the end of this year, if the studies are completed, the studies are awarded, and then they go for the financial closure and go for the implementation of the project. That is the current situation of coal gasification. Regarding hydrogen, in this case, nothing much that we have at this point of time.

We are still looking for the good opportunity, and bio-refinery also at this point of view. There is no major significant work. However, we are implementing one CBG plant for our own. We are implementing it with our own investment. We are also thinking of having another CBG plant wherein we are investing on our own, in line with the government guidelines. That is one of the opportunities there.

P. Jha

How about crude storage, the thing that [crosstalk]

Vivek Midha

You know that after this, ISPRL is going to invest in, is thinking of having more strategic storages. All across like MP and Bina, MP, Dina, and there are other few, three more locations are there. Those will be opportunities available for us to get ready, because ISPRL, most of the projects have been done by us, strategic storages, and we are very good in strategic storages. Those will be there. Otherwise, other storages are part of the projects, major projects, so these are there. Whenever any major project comes, the crude storage and terminal, it always comes as a part of it. As well as the strategic storages, these ISPRL projects are on the anvil, which are published. We will be bidding for those, carrying out.

P. Jha

Outstanding. Another very broad, this thing that for the domestic order book for the remaining part of the year, or let us take during the next financial year also, what is the expected order book that you expect, domestically speaking? From all these segments, if you have any, the management would have some idea.

Vivek Midha

I can talk about the business intake at this point of time. It is around INR 8,100 we are there, so we are going to add something more. The next year we are going to maintain it like this. Overall order book is around INR 20,000 crore, wherein almost INR 60,000 crore is, that is almost 60% is from the overseas, and balance will be from the domestic, so around 40%. So, let us see. Typically, it remains around 40%, 50% we can be having from domestic market, if we maintain that percentage.

Sanjay Jindal

As of date on the order book portion, we have 75% from the Consultancy segment. This is good on the part of Engineers India, because we are higher margin in the Consultancy segment.

P. Jha

Naturally. Yeah, absolutely. Extraordinary, sir. Great feat achieved. All the best. Thank you.

Vivek Midha

Thank you.

Operator

Thank you. The next question comes from the line of Akshay Kulkarni from DB PMS. Please go ahead.

Akshay Kulkarni

Thank you for taking my question. Hope I am audible to you.

Operator

Yes, sure.

Akshay Kulkarni

My first question is on the INR 4,200 crore Dangote order. Given the ongoing court case in Kenya around the proposed refinery project, is there any impact on the project timeline or EIL scope of work? As the work commence on EIL mandate, is there any risk on execution of the order at this stage?

Vivek Midha

Just don't go by the news. The work is already on. We are working on the engineering side of it. That is contractor's, that is owner's perspective, and he is managing it, and he will handle all the legal issues and all. As of now, we have not been biased on this, but we are working on this, and engineering is on this project.

Akshay Kulkarni

Okay, thank you. The next question on order book, basically, on a broad basis, what could be the approximately split between consultancy and a turnkey in FY 2028 order inflow? Should we expect the turnkey order inflow to stay range around INR 3,000 crore in the next year?

Vivek Midha

So typically, it remains, this year it is around 25%-30% is from the LSTK, and rest is from the consultancy. Somewhere it generally remains, this side is consultancy heavy. This order book is, the order inflow is being consultancy heavy. But typically, it remains 60/40, is the normal ratio, 60% consultancy and 40% LSTK. Generally, it remains like this.

Akshay Kulkarni

What about the order inflow for turnkey? It will stay around INR 3,000 crore?

Vivek Midha

[inaudible] if your 8,000, it's around 8,000, then you can presume that around 30%, 40% from that.

Akshay Kulkarni

Okay, cool. Our next question is on operating margin. You have previously guided around 15%-16% EBITDA margin. Are you confident on reaching this at a same level?

Vivek Midha

Yeah, we are sure to maintain our EBITDA margin because we are executing more and more Consultancy segment, and margins are protected there.

Akshay Kulkarni

Okay, cool. Just a last question. Any update on IOCL Paradip Phase II and also on BPCL Andhra?

Vivek Midha

IOCL Paradip Phase II is still to be decided by the government, by the client, because I think they are looking for the land. As soon as they sort out the land, then the second phase will come. We will have to wait dependent on them. BPCL Refinery, it is still in the consultancy selection and study phase. Let's see. Towards the end of this year, some tender or something should come. They should come up with the final implementation plan for this.

Akshay Kulkarni

Okay, cool. Thank you. That is it from my side.

Operator

Thank you. The next question comes on the line of Shubham Borade from ICICI Securities Private Limited. Please go ahead.

Shubham Borade

Hi, yeah. Thanks for the opportunity and congratulations on a very well set of numbers. My question is, how is the progress on execution for Dangote order going on? The first one which we got in January 2026.

Vivek Midha

It is progressing well, and a lot of ordering is being done by the client and all. Our teams are also working on the exhaustive engineering is on this point of time. Teams are deployed there on the engineering activities. So, work is going in full blast.

Shubham Borade

Can we expect some number in percentage terms, if possible?

Vivek Midha

I don't have the percentage of progress at this point of time, boss. We'll have to see, because in this financial, it was awarded somewhere in January, and probably in this financial, we'll have to see. I don't have the percentage progress of exactly at this point.

Shubham Borade

Sure, sir. Sure. Thank you. Hello? Hello?

Operator

Participant line seem to be disconnected. The next question comes on the line of Anubhav Mukherjee from Prescient Capital. Please go ahead.

Anubhav Mukherjee

Hello?

Vivek Midha

Yes, sir.

Anubhav Mukherjee

Sir, thanks for the opportunity and congrats on very strong results. I joined a bit later, so this might have been covered, but if I look at the Consultancy segment EBITDA margin, it was 30% plus this quarter. Is there any one-off or any benefit from project closure? Yeah.

Sanjay Jindal

Our segment profit from Consultancy segment is 30%, and it does not include any one-time item. It is from the leverage.

Anubhav Mukherjee

Got it. Sir, typically, when we work on larger projects like the Dangote project, is the margin better for that? Do our Consultancy segment margin move up? Yeah.

Sanjay Jindal

Definitely, with the Dangote project, our margins will move upside only. But Dangote project is still picking momentum. So definitely in the coming second half and in the next year, full reflection will be there on the profit side.

Anubhav Mukherjee

Got it. And sir, will it be possible to share like how much of the order book, consultancy order book of INR 20,000 crores that we have, will be like get executed over next two or three years?

Sanjay Jindal

Out of INR 20,000, around 75% is from the consultancy segment, and around 55% is from the overseas business. And these projects will be delivered between 3-4 years.

Anubhav Mukherjee

Got it. Okay, I'll get back in touch. That's all the questions I have.

Operator

Thank you. The next question comes from the line of Saania Jain from Care PMS. Please go ahead.

Saania Jain

Hi, thank you for the opportunity and congratulations on the good set of numbers. Just want to take clarity that the recent Dangote project that we got for INR 4,000 crores, given it is a greenfield project, will this project still have the execution rate of 3-4 years?

Sanjay Jindal

Yes, ma'am. Generally, Dangote projects remain for 4-5 years.

Saania Jain

Okay, got it. Wanted to know a bit more on the competitive analysis. What would do in both the domestic and export market? What would be, can we assume is our strike rate in different sectors and in both domestic and export market?

Sanjay Jindal

Midha ji.

Vivek Midha

Can you repeat this question? I missed out on that question, please. Can you please do that?

Saania Jain

Yeah, just wanted to understand a bit more on the competitive intensity in the industry. What would be our-

Vivek Midha

Yeah.

Saania Jain

strike rate in both the domestic and export market?

Vivek Midha

Ma'am, it is very difficult to say what is the strike rate because in India, we are the leaders. We beat them in many companies in competition. All the mega jobs, we beat them in competition. And internationally also, there are a number of brands available. So, it all depends. It is very difficult to tell you in terms of percentage, how much to get the business. Our target is to get each and every job which we bid.

Saania Jain

Right.

Vivek Midha

Market is quite broad.

Saania Jain

Got it. And just wanted to understand if there is any update on the CPSE pay revision. Do we expect any increase for the labor cost in FY 2027 or 2028?

Vivek Midha

Yeah, right now, as such there is no commission for the pay revision. Whenever it will come, definitely we will take care of that.

Saania Jain

Do we expect it to come by FY 2028 or later?

Vivek Midha

Yeah, we cannot say right now. Basically, right now there is no commission for that, so we cannot say that when it will come. It is up to the Government of India.

Saania Jain

Okay, thank you.

Operator

Thank you. The next question comes from the line of Mayur Parkeria from Scripbox Wealth Managers Private Limited. Please go ahead.

Mayur Parkeria

Hello, am I audible?

Sanjay Jindal

Yeah.

Vivek Midha

Yes, sir.

Mayur Parkeria

Yeah, so thank you for taking my question. I joined the call a little late because I was still believing, I still thought it was 4:30. I got late intimation about the revised timing. Anyway, sorry if there is a duplication. I am trying to understand more in detail the company. Sir, I just wanted to understand that, assuming that if the global geopolitical situation settles down, let us say, it is assuming, so assuming theoretically it settles down tomorrow, would you say that from our core capabilities perspective on refineries and gas value chains and terminals, do you believe that the opportunities post this would increase for us, or will it remain the same, or has it gone down relative to what it was in the last four, five months?

Sanjay Jindal

Midha, [inaudible]

Vivek Midha

Naturally, the opportunities would increase for us. When the market is unstable, the project CapEx investment is not coming, and CapEx investment-

Mayur Parkeria

Right

Vivek Midha

is stabilized, then the opportunity will be stagnant. As soon as the market opens, more projects come, we will get an option of bidding more, and more market tenders will be out. So actually, it is going to increase for me with this kind of experience. Because we have-

Mayur Parkeria

Okay, so one minute-

Vivek Midha

international. Yeah, tell me.

Mayur Parkeria

Okay. Sorry, sir. Sorry to interrupt. You can please finish. I will still-

Vivek Midha

No, no, that is fine. I have concluded my answer. You can go ahead. Please.

Mayur Parkeria

Is it only primarily because of the fact that because of the disruption, the order, the tenders are not happening, or is it also because of the fact that the current war situation has actually disrupted a lot of refining capacities, and to that extent, there can be a meaningful jump in the opportunity over the next one year once the war situation settles down? For a player like us with global capabilities and relationships, the potential can be much more. Is that also a parameter, or it is just the fact that the current tenders are not coming?

Vivek Midha

It is like this. Opportunities somewhere would be going down and somewhere would be increasing. The impact of the market is the impact of the business in Africa has increased just because of this, because there is an alternative market created and alternative opportunities available to some other manufacturers, to producer. We setting up projects all around the world, so that is an opportunity created somewhere else. At somewhere else, the opportunity has gone down because in the Middle East, no major CapEx is coming or probably it will take some stabilization. It is reduced, but it is a temporary phase. If hope everything goes fine, then the opportunity will come out, and we will see because we will also be participating everywhere. Everybody is right now focused on getting the crude and getting the crude and managing their internal resources.

Later on, when everything is fine and projects and CapEx investments would come, India, we have not seen any major impact there. If any project has to come, it is coming. There is no visual project impact on this.

Mayur Parkeria

Okay. Sir, in the earlier call, your answer, have you mentioned that we were looking at around INR 8,000 crores of annual order in. Was that because in one of the answers you mentioned about INR 8,000 crore? I was just trying to understand. Was that the number which-

Vivek Midha

We had always told that we will be in the range of INR 7,800, INR 7,400. Last year's order we will try to match. We are meeting this year's also, and we have already crossed that, almost reached that order, inflow projection. We are hopeful it will be-

Mayur Parkeria

Sir, will it be also fair to say that despite so much of disruption going on, we are in a position to get this outlook, or our turnovers are much lower currently, revenue flow from the order book. We have already reached INR 20,000 crore, and we are talking of annual inflows of INR 8,000. In a normal situation, once this settles down, will it be fair to say that this number can theoretically or in your best guess estimate, this can actually materially go up, is a fair way to look at, or we believe that our target would be only in the region of INR 8,000 crore? That's how one should look at?

Vivek Midha

We will always be optimistic of having the higher number. We will always be optimistic. But to stabilize ourselves at this point of time, the way we look at it is the projection we have given. But we are always trying to improve on that, and 10%, 15%, 20%, we are definitely going to improve from the existing target, if everything goes fine. Our objective would be to get more, as more as we can do.

Mayur Parkeria

Great. Sir, last question from my side. Sir, in the last couple of years, while currently we have again started a new cycle over the last two, three years, and we have seen a good accretion in the order books which have started, but there was a very big lull period of decade before that. Over these couple of years, medium term, can you lay some qualitative around our capabilities which have increased in other segments, which helps us to diversify and open up newer opportunities which can come in over the next two years, three years, not over the next 10 years, but over two, three years, based on what capability enhancements which we have done anything, any specific things you can put a highlight because I have missed that in the previous readings of mine.

Can you just highlight that which can be a potential in the next two, three years for us?

Vivek Midha

Definitely. It's like this. One has to continuously grow. Earlier lull period you're talking about, it was because of some market assignments were also on there. The market was also stagnant, and not many projects were there. Every company has that kind of phase from time to time. That was the earlier phase. We have also started centering ourselves. We are seeing the kind of diversification we have done. We are not only dependent on the hydrocarbon. We are all across key sectors. We are into infrastructure, we are into ferrous, non-ferrous, we are into now strategic storages, we are into going into fertilizer. You're seeing all these new segments we have added. Today, infrastructure contributes to my order into around 20%, 25%. In between, it was around 40%.

The hydrocarbon, it is definitely is the core market for me, but I've also diversified into these segments. We'll also gone into the fertilizer. You're seeing that lot of fertilizer projects we have got in the Middle East, as well as in India also we are doing various projects. So, we are also upgrading ourselves. At the same time, we are training, we are improving the training of our people. Right now, we are focusing on the new segments like new fuels. There is opportunities shown in the market, opportunities there in the market with respect to the new fuel. So, we are training our people and making them ready. It's always continuous upgradation depending on what kind of opportunities are available in the market. Every company has to improve upon itself, improving the productivity of its employees.

All those factors we are working on, and that has given us the results. Hopefully, it should be better now.

Mayur Parkeria

Okay, sir. Sir, I'll come back in the Q&A. Thank you so much. Wish you all the best, and great set of margin performance there. Thank you.

Vivek Midha

Sir, thank you.

Operator

Thank you. The next question comes from the line of Anubhav Mukherjee from Prescient Capital. Please go ahead.

Anubhav Mukherjee

Sorry, sir, again, like, I also joined at 4:30 because somehow the meeting was showing up at 4:30 on the calendar. Sir, if you could share, like, what are some of the large domestic consultancy orders that you are expecting in the next one year or so? If you haven't already covered that, if you can take us through that would be very helpful.

Vivek Midha

No, it's like this. You are already aware that there is an upcoming refinery which is coming, so we'll be targeting that one. Paradip is on the anvil. There's a phase II contract will be there. There are various minor revamp projects for BPCL and other refineries is there. There is an opportunity for the strategic storages, so we are targeting there. We are working in the non-ferrous segment. We are targeting some opportunities out there because some companies are thinking of putting up an aluminum smelter and all. So, all these segments we are working. Infrastructure, there is lot of investment out there, so we are working towards it. We have recently got a data center project on turnkey basis for the data center for one of the clients, Power Grid.

These opportunities are there, and we are trying, and we are getting the assignments also, so that we are working towards it. Several kind of projects are there.

Anubhav Mukherjee

Thanks. Also, for like overseas consulting projects, how do like margin for those projects compare to like domestic? Are those typically higher-margin projects or in line with the domestic consulting projects?

Vivek Midha

Our consultancy margins remains the same, generally remains the same. We don't overcharge anywhere, but it will always remain the same segment and almost in the same range. Somewhere we make it good.

Anubhav Mukherjee

Okay. Got it. Thanks.

Operator

Thank you. The next question comes from the line of Darshan Shah from Multi-Act PMS. Please go ahead.

Darshan Shah

Hello? Am I audible?

Operator

Yes, sir.

Darshan Shah

Yeah. Just one question. Based on this INR 8,100 crore order inflow that we have till date, around incremental INR 670 crores of order inflow, what would be the split between consultancy and turnkey? Would it be largely Consultancy segment?

Vivek Midha

Yes, it is particularly more of consultancy type.

Darshan Shah

Okay. And one more question on the credit terms, right? So, for the international Consultancy segment, what are our credit terms, specifically, let's say, for Africa?

Vivek Midha

Credit terms means, what is it exactly you would like to understand in credit terms? Payment terms?

Darshan Shah

No, in terms. Yes, yes.

Vivek Midha

Payment terms are fine. We are always progress linked with respect to your engineering progress as well as the project progress. They are mixed.

Darshan Shah

Yeah, in terms of, is there a letter of credit or, just wanted to understand that.

Vivek Midha

No, it is like this. Not necessarily you need a letter of credit for that.

Darshan Shah

Okay.

Vivek Midha

Most of the clients are known in the Middle East and all, so they are reputed clients. They never default on the payments and all.

Darshan Shah

No, specifically I am checking on Africa.

Vivek Midha

Africa, we have been working with this client for a long time, so we know the stability. And before entering into any of the agreements, we also do our due diligence, that is paying capability, we always check. We do not work with the unknown clients. We verify their credentials also.

Darshan Shah

Sure. Okay, thank you.

Operator

Thank you. The next question comes from the line of Deep Sanghavi from Dalal & Broacha Stock Broking Private Limited. Please go ahead.

Deep Sanghavi

Yeah, thank you so much for the question again. My question was regarding this. Out of the INR 8,100 crore order inflow till date, how much would be from the Middle East from this?

Vivek Midha

INR 8,100 crores, Middle East would be a little bit limited, something around INR 500 crores or so, INR 500 or INR 600 crores.

Deep Sanghavi

We haven't received any orders in Q2, right? Because I think in Q1 also it was the same kind of-

Vivek Midha

We have got smaller orders. We have got smaller orders, that segment.

Deep Sanghavi

Right. Just a follow-up to that. MD sir and the AGM has said that there's, in the kind of 2-3 year range, there's almost around a billion dollar of opportunity in the Middle East regarding strategic storage projects and all, pipeline projects as well. Are we bidding for these projects there? If there will be any projects, we will definitely bid, right?

Vivek Midha

No, definitely there's lot of opportunities out there, provided all that market stabilizes. There are a number of tenders we are bidding for various EPC contractors. Hopefully, let's see, the result comes, because these are long gestation bidding cycles. They come in time to come. We'll let you know. But the opportunities are there, provided everything stabilizes.

Deep Sanghavi

Sure. Sir, just a last question from my side. I know one of the people have asked this before, but if you can please guide any, in a broad range as well, that'll be fine. Because we generally aim for INR 8,000 crore per year of order inflows, right? If you can guide something for the next fiscal, FY 2028, that'll be very great. Thank you.

Vivek Midha

Next financial year, it will be at least minimum INR 8,100 crore, INR 8,000 crore or more.

Deep Sanghavi

Okay, perfect. Thank you. Thank you so much, sir. Thank you. Again, a great set of numbers.

Vivek Midha

Thank you so much.

Operator

Thank you. Ladies and gentlemen, we will take this as the last question for today. I now hand over to the management for closing comments. Over to you, sir.

Sanjay Jindal

Thank you. Thank you very much. Thank you very much. Thank you so much. We obviously hope we could meet the expectation of our investors. Thank you, everyone. Bye-bye.

Operator

Thank you. On behalf of Engineers India Limited and DAM Capital Advisors Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.