USMarketsToday.com
KNT

K92 Mining Inc.

KNTNF · OTC · Canada
$17.11+$1.16 ↗ 7.27%
At close: Nov 27, 12:59:12 PM EST
$17.40+$0.29 ↗ 1.69%
After-hours: Nov 27, 4:00:00 PM EST
Volume
Market Cap$4.20B
Open$16.75
Trailing P/E18.37
Day Range$16.74–$17.40
Dividend Yield0.00%
52W Range$13.91–$24.87
EPS$1.52
Volume1.40K
Avg Volume86.02K
50-Day Avg$18.75
200-Day Avg$18.55

Bull vs Bear

Every version →
▲ Bull caseStage 3 spending is about 98% spent or committed, Q4 is guided as the strongest quarter, and Stage 4 targets over 400,000 ounces annually by late 2027. Analysts forecast revenue growth of roughly 19% to 36% per year, with the expansion supporting stronger margins and free cash flow.[8][1][9]
▼ Bear caseExecution risk remains because the Q3 results missed estimates on both earnings and revenue. Three analysts revised earnings downward. Tailings capacity questions, with the environmental impact statement submission pushed to Q1 2027, and a deferred power line project could constrain throughput as the ramp-up continues.[8]
Largest moves in the past year from daily prices
Nov 27, 2026
Big RallyGap Up 5.0%
KNTNF gained 9.1% to close at $17.40, opening 5.0% above the prior close. Intraday range of $0.66 ($16.74 – $17.40) spanned 3.9% in a volatile session. Closed near the session high, with buyers in control into the close.
+9.1%
Nov 6, 2026
Gap Down 10.4%
KNTNF fell 0.3% to close at $19.50, opening 10.4% below the prior close. Intraday range of $1.99 ($17.51 – $19.50) spanned 11.4% in a volatile session.
-0.3%
Nov 4, 2026
Big RallyGap Up 7.2%
KNTNF gained 8.4% to close at $18.92, opening 7.2% above the prior close. Closed near the session high, with buyers in control into the close.
+8.4%
Aug 5, 2026
Big RallyGap Up 5.9%
KNTNF gained 8.3% to close at $18.68, opening 5.9% above the prior close. Intraday range of $0.55 ($18.17 – $18.72) spanned 3.0% in a volatile session. Volume reached 157.20K shares (2.5× the 20-day average). Closed near the session high, with buyers in control into the close.
+8.3%
Jul 29, 2026
Gap Down 9.1%
KNTNF gained 0.7% to close at $16.08, opening 9.1% below the prior close. Intraday range of $1.93 ($14.52 – $16.45) spanned 13.3% in a volatile session. Volume reached 90.80K shares (1.5× the 20-day average).
+0.7%
Jun 5, 2026
Sharp Drop
KNTNF fell 8.2% to close at $15.82. Intraday range of $1.93 ($15.82 – $17.75) spanned 12.2% in a volatile session. Volume reached 195.40K shares (2.1× the 20-day average). Closed near the day's low as sellers pressed into the close.
-8.2%
Mar 19, 2026
Sharp DropNew 52-Week LowVolume 2.9× avgGap Down 13.8%
KNTNF fell 4.6% to close at $15.40, opening 13.8% below the prior close. Intraday range of $1.62 ($13.91 – $15.53) spanned 11.6% in a volatile session. Volume reached 451.25K shares (2.9× the 20-day average). Set a new 52-week low of $13.91. Recovered from the lows into the upper part of the range as dip buyers stepped in.
-4.6%
Mar 16, 2026
Gap Down 10.2%
KNTNF gained 0.1% to close at $17.78, opening 10.2% below the prior close. Intraday range of $2.07 ($15.96 – $18.03) spanned 13.0% in a volatile session. Volume reached 223.74K shares (1.7× the 20-day average).
+0.1%
Mar 3, 2026
Sharp Drop
KNTNF fell 10.1% to close at $21.79. Intraday range of $2.38 ($21.33 – $23.71) spanned 11.2% in a volatile session. Closed near the day's low as sellers pressed into the close.
-10.1%
Feb 12, 2026
Sharp DropNew 52-Week HighGap Up 5.2%
KNTNF fell 9.7% to close at $19.60, opening 5.2% above the prior close. Intraday range of $3.22 ($19.60 – $22.82) spanned 16.4% in a volatile session. Set a new 52-week high of $22.82. Closed near the day's low as sellers pressed into the close.
-9.7%
Feb 6, 2026
Big RallyGap Down 9.3%
KNTNF gained 4.0% to close at $19.54, opening 9.3% below the prior close. Intraday range of $2.69 ($17.03 – $19.72) spanned 15.8% in a volatile session. Closed near the session high, with buyers in control into the close.
+4.0%
Jan 30, 2026
Sharp DropGap Down 4.4%
KNTNF fell 9.4% to close at $18.70, opening 4.4% below the prior close. Intraday range of $1.22 ($18.50 – $19.72) spanned 6.6% in a volatile session. Closed near the day's low as sellers pressed into the close.
-9.4%

Latest news

Earnings Earnings history →

Next report · Q4 FY2026

DateMar 25, 2027
EPS Est.—
Revenue Est.—
Avg 1-Day Move±—

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
Q3 FY2026 Nov 16, 2026 $0.25 $0.21 -15.2% $193.65M $176.50M -8.9% —
Q2 FY2026 Aug 10, 2026 $0.37 $0.34 -9.1% $196.00M $205.20M +4.7% —
Q1 FY2026 May 11, 2026 $0.41 $0.48 +17.2% $219.50M $236.30M +7.7% —
Q4 FY2025 Mar 2, 2026 $0.33 $0.36 +9.3% $179.62M $176.80M -1.6% —
Q3 FY2025 Nov 10, 2025 $0.28 $0.34 +21.7% $159.47M $177.55M +11.3% —
Q2 FY2025 Aug 11, 2025 $0.15 $0.16 +6.0% $98.50M $96.34M -2.2% —
Q1 FY2025 May 12, 2025 $0.23 $0.29 +26.2% $129.80M $144.60M +11.4% —
Q3 FY2024 Nov 14, 2024 $0.17 $0.19 +11.1% $122.34M $122.75M +0.3% —

Latest earnings analysis · Q3 FY2026 · Nov 16, 2026

Q3 production was 49,776 gold equivalent ounces (46,063 oz gold, about 1.95M lbs copper, 55,746 oz silver), up about 8% from Q2 and the second highest quarter on record, with records in ore mined (252,744 t), tonnes processed (up 82% year over year), and development (3,486 m). Recoveries were 94.1% for gold and 94.9% for copper.
Revenue was $176.5M on 41,587 oz gold sold at $4,236/oz, with by-product cash costs of $936/oz and AISC of $1,441/oz (up from $694 and $1,254 in Q3 2025 on lower head grade of 6.1 g/t versus 10.7 g/t and higher ramp-up costs). A one-time non-cash $90.3M deferred withholding tax charge drove a net loss of $39.5M ($0.16/share), while adjusted net earnings were $52.5M ($0.21/share).
Cash reached a record $389.9M with net cash of $355.4M after repaying another $5M on the Trafigura facility ($35M outstanding). Taxes and royalties paid or accrued in PNG reached 991M kina and are expected to exceed 1B kina by year end.
Guidance: 2026 production of 190,000–225,000 gold equivalent ounces is reiterated, with Q4 expected to be the strongest quarter on higher physicals and a higher-grade stoping sequence, and costs expected within 2026 cash cost and AISC guidance. Stage 3 (about 300,000 oz/yr at run rate) is 98% spent or committed and on budget, Stage 4 (over 400,000 oz/yr) targets plant commissioning in late 2027, and 2027 development is targeted at 1,400 m/month. 2026 Stage 4 capital is expected to be slightly under guidance, and 2027 guidance is pending budget approval.
Exploration: the fleet of 15 rigs will grow to 19 in 2027. Updated Cora and Judd resources and reserves are targeted for late Q1 2027, and the Arakampa maiden resource for late 2026 or Q1 2027. Drilling at Madi Masoen starts in Q1 2027. Existing tailings capacity runs to mid-2029, and the new Baopa facility EIS submission has moved to Q1 2027.

Earnings call · Q3 FY2026 · Nov 16, 2026 · 5:30 PM EST

Full transcript →
≈ 42:46 · 62 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Operator

I would now like to turn the conference over to David Medilek, CEO and Director. Please go ahead.

David Medilek

Thank you, operator, and thank you everyone for attending K92 Mining's 2026 third quarter financial results conference call. We hope you and your families are doing well. Joining me on the call today are Justin Blanchet, Chief Financial Officer, and Rob Smillie, VP Exploration. As many of you know, I assumed the role of Chief Executive Officer and Director on October 1st, succeeding John Lewins. I would like to acknowledge John's contribution to K92's growth over more than a decade. Having been part of K92's leadership team since 2019, I am pleased to lead the company through its next phase of growth. My focus is on safely increasing production and delivering our expansion plans through strong operational and project execution while advancing our significant exploration opportunities. We remain committed to operating responsibly and working in partnership with our host communities and the government of Papua New Guinea.

We are focused on ensuring that our success delivers lasting value for our shareholders, employees, our communities, and Papua New Guinea. Following management's remarks, we will open the call for questions. As we will be making forward-looking statements during the call, please refer to the cautionary notes and risk disclosure in our MD&A and slide two of the webcast presentation. Also, please bear in mind that all dollar amounts mentioned in the conference call are in United States dollars unless otherwise noted. We begin with safety, K92's highest priority. As shown in the chart on the left, our total recordable injury frequency rate, or TRIFR, has remained well below the average reported by members of the International Council on Mining and Metals, which include many of the world's largest mining companies.

Our TRIFR has continued to improve alongside a stronger focus beginning in 2023 on improving safety behaviors and proactive risk management. We have substantially increased hazard identification and risk assessments, as shown in the chart on the right, while also focusing on improving their quality. These activities are important leading indicators of positive safety performance. Concurrently, we continue to improve our safety technology systems and facilities. Earlier this year, we fully implemented Skytrust, our cloud-based safety and compliance management platform. This has strengthened our ability to manage incidents, inspections, audits, injury management, and broader occupational health and safety documentation. We are also developing a new underground mining training center to complement our existing surface facilities. These will strengthen the theoretical and practical training provided to new starters before they commence their roles. Our ultimate goal remains unchanged, zero harm across our workforce.

Emergency preparedness is another important part of our safety strategy. I am pleased to highlight our team's outstanding performance at the 2026 National Emergency Response Challenge, which was held in Lae in October and hosted by the Mineral Resources Authority. Our team achieved first place in three categories, hazmat, team safety, and best captain, and second place for best team overall. These results demonstrate the strength of our emergency response capabilities, training, and teamwork. I would like to congratulate the entire team on this exceptional achievement. Turning to our broader commitment to responsible mining, we remain focused on delivering lasting benefits to our host communities in Papua New Guinea. Our growing economic contribution is an important part of this, and K92 continues to be one of the country's leading mining sector taxpayers.

Subsequent to quarter end, we made our third corporate tax installment of PGK 231 million in October, bringing total corporate tax payments for 2026 to PGK 758 million. Total taxes and royalties paid or accrued in 2026 reached PGK 991 million as at the end of October, and we expect this total to exceed a billion kina by year end. These contributions highlight the substantial economic benefits K92 is delivering to Papua New Guinea. Our commitment to Papua New Guinea also extends to long-term community partnerships. We were pleased to recently announce K92 as a major and foundational partner of the PNG Chiefs ahead of their historic entry into the National Rugby League competition. Rugby league is deeply embedded in Papua New Guinea and the communities in which we operate.

Our support has grown from grassroots development led by rugby league legend and K92 team member Marcus Bai, to partnerships with the PNG Hunters and the Goroka Lahanis, including support for women's rugby league. Our commitment to the PNG Chiefs extends through 2031, reflecting our long-term shared focus on community engagement, youth development, and creating opportunities for Papua New Guineans, while further strengthening our relationships with our employees and communities across PNG. Turning to our operating performance, we are pleased to report another strong quarter, highlighted by the significant milestone of surpassing 1 million gold equivalent ounces produced since declaring commercial production in February 2018. This achievement underscores K92's remarkable growth journey, driven by exploration success translated into successive phases of production expansions delivered through strong operational and project execution.

We achieved third quarter production of 49,776 gold equivalent ounces, comprising 46,063 ounces of gold, approximately 1.95 million pounds of copper, and 55,746 ounces of silver. Gold equivalent production increased approximately 8% compared with the second quarter and represented our second-highest quarterly production result to date. Importantly, this was achieved alongside significant records in mine development, ore mined, or processed, and total tons mined. The quarter demonstrates the positive impact of the new stage three process plant, the ongoing ramp-up of our second mining front, and the underground infrastructure investments made over the past several years. Cash costs of $936 an ounce gold and all-in sustaining costs of $1,441 per ounce gold were recorded for the quarter on a byproduct basis. On a coproduct basis, cash costs of $1,144 per ounce gold equivalent and all-in sustaining costs of $1,608 per ounce gold equivalent were reported.

As shown in the chart, all-in sustaining costs have remained meaningfully above cash costs since early 2023, reflecting K92's substantial investment in the stage three expansion. Costs are expected to decline once the expansion is completed and the operation reaches steady state production. Importantly, even at these temporarily elevated levels, K92 remains in the lower half of the industry AISC curve, underscoring the high quality of the K92 gold mine and the company's continued focus on cost discipline. In terms of processing, Q3 was a record quarter for total tons processed, increasing 11% versus Q2 and 82% compared with Q3 2025, and marked the third full quarter in which all material was processed exclusively through the new plant, which continues to deliver very strong performance.

Overall metal recoveries were 94.1% for gold and 94.9% for copper, both exceeding the parameters in our updated Definitive Feasibility Study, with gold recoveries exceeding the study parameter for the 10th consecutive quarter. The third quarter was a major step forward in terms of physicals. We achieved record tons processed as noted earlier. Total material mined reached a record 485,812 tons, an increase of 14% compared with Q2 and 37% year-over-year. Ore mined also reached a record of 252,744 tons, representing a 66% increase compared with the third quarter of 2025. We highlight that September 2026 ore tons mined were the equivalent to an annualized rate of 1.13 million tons per annum, so we are already rapidly moving towards stage three run rate tonnage of 1.2 million tons per annum. We achieved record quarterly mine development of 3,486 meters, up 41% year-over-year.

This equates to an average of 1,162 meters per month, approximately 16% above the stage three expansion development requirement of 1 km a month. In July, we achieved a monthly development record of 1,220 meters, exceeding the stage four expansion monthly development requirement of 1,200 meters a month. Importantly, these results were achieved before multiple key enablers, including commissioning of the phase four primary ventilation upgrade and before the planned addition of another development jumbo later in the year. Second mining front Lower Kora continued to ramp up during the quarter, while the third mining front at the twin incline area delivered its first stope ore in September. Looking ahead, we continue to expect Q4 to be our strongest production quarter of the year, supported by a planned higher grade stoping sequence, increasing mining rates, and further improvements in material handling and ventilation.

We reiterate our 2026 production guidance of 190,000-225,000 ounces gold equivalent. I will now turn the call over to our Chief Financial Officer, Justin Blanchet, to discuss our financial results.

Justin Blanchet

Thank you, Dave, and hello, everyone. For the third quarter, K92 reported revenue of $176.5 million compared with $177.5 million in Q3 2025. During the quarter, we sold 41,587 ounces of gold at an average selling price of $4,236 per ounce, compared with 45,006 ounces of gold sold in Q3 2025 at an average price of $3,361 per ounce. As at September 30th, 2026, we held 12,511 ounces of gold in inventory, including concentrate and doré, up 3,286 ounces from the end of June. Cost of sales for the quarter was $64.7 million compared with $43.8 million in Q3 2025. Excluding non-cash items, cost of sales was $49.3 million compared with $35.5 million in the prior year.

The increase in cost of sales was largely due to record underground mining and processing activity associated with the stage three expansion ramp-up, with ore mined up 66% and ore processed up 82% year-over-year. Depreciation and depletion also increased to $14.5 million from $7.1 million in Q3 2025, as the new stage three process plant entered commercial production on January 1st, 2026. Cash flow from operating activities before changes in working capital was $72.5 million for the quarter compared with $101.8 million in Q3 2025. As at September 30th, 2026, K92 had a record cash and cash equivalents balance of $389.9 million, working capital of $425.9 million, and net cash of $355.4 million. That is up from $349.4 million at June 30. During the quarter, we repaid another $5 million under the Trafigura credit facility. As at September 30th, $35 million was outstanding with $60 million still available.

We also continued our gold put option program, which provides downside protection on 10,000 ounces per month at a strike price of $3,500 per ounce through December 2026, without limiting our exposure to higher gold prices. In July, our Papua New Guinean operating subsidiary paid its first dividend of approximately $100 million to K92 Mining Inc. Papua New Guinea charges a 15% withholding tax on dividends, so approximately $15 million was withheld and paid, and that is included in our current tax expense for the quarter. The first dividend also changed our accounting. Until this quarter, we didn't record withholding tax on earnings retained in Papua New Guinea because we were reinvesting in the expansion and repaying internal loans.

Now that the internal loans are fully repaid and we expect to keep paying dividends in Canada, IFRS requires us to record a 15% dividend withholding tax on all the retained earnings that have built up, whether or not they have been paid out. The catch-up is the $90.3 million deferred tax expense you see in Q3. The key points are these. First, it is non-cash. Nothing was paid on the $90.3 million. It sits on the balance sheet as a deferred tax liability and only becomes payable when the dividends are paid at the same 15% rate. Second, it is a one-time catch-up on prior year's earnings, and we don't expect another adjustment of this size. Going forward, the withholding tax will be accrued each quarter on the new Papua New Guinean earnings, but it is not a cash flow item until a dividend is paid.

Third, the deferred tax expense does not affect our cash costs, all-in sustaining costs, or operating cash flow. We ended the quarter with a record cash balance of $389.9 million after paying approximately $15 million of dividend withholding tax. In short, we earned $96.3 million before tax in the quarter. The reported net loss of $39.5 million, or $0.16 per share, is the result of this one-time accounting catch-up. Excluding that charge and a small loss on our gold put options, adjusted net earnings was $52.5 million, or $0.21 per share. As Dave highlighted, Kainantu produced 46,063 ounces of gold, approximately 1.95 million pounds of copper, and 55,746 ounces of silver during the third quarter. We sold 41,587 ounces of gold, approximately 1.91 million pounds of copper, and 53,575 ounces of silver.

On a byproduct basis, cash costs were $936 per ounce, and our all-in sustaining costs were $1,441 per ounce, up from $694 and $1,254 respectively in Q3 2025. The increase mainly reflects lower head grade at 6.1 g per ton of gold compared with 10.7 g per ton, and higher operating costs as we ramped up throughput for the stage three expansion, with ore mined up 66%. These were partially offset by higher byproduct credits. At $1,441 per ounce, our all-in sustaining cost was about 1/3 of our realized gold price of $4,236, a margin of roughly $2,800 per ounce. That reflects our cost discipline and the quality of the Kainantu gold mine.

As the stage three expansion ramp-up is completed, we expect economies of scale to bring unit costs down, and we remain positioned to deliver within our 2026 cash cost and all-in sustaining cost guidance ranges. I will now turn the call back to Dave for an update on our growth projects.

David Medilek

Thank you, Justin. I will now provide an update on the stage three and four expansions and the major infrastructure projects supporting our production growth. The stage three and four expansions are expected to fundamentally transform Kainantu into a tier one mid-tier gold producer. The stage three expansion supports a processing rate of 1.2 million tons per annum and an average annual production of approximately 300,000 gold equivalent ounces at run rate. Stage four is expected to increase average annual production to more than 400,000 gold equivalent ounces at run rate, with commissioning of the expanded plant targeted for late 2027. The 600,000 ton-per-annum stage 2A plant, which has been idled, provides additional capacity for future expansion beyond stage four. As at September 30th, approximately 98% of stage three expansion growth capital had been spent or committed, with the project remaining on budget.

In late October, we were pleased to host a large group of analysts and investors for a comprehensive two day study visit to the Kainantu gold mine to see firsthand the major transformation underway on site, and to also showcase the mining-friendly jurisdiction of Papua New Guinea. On surface, the tour included visits to the new state-of-the-art 1.2 million-ton-per-annum stage three process plant, shown in the image, the operating tailings filter plant, which forms part of the pastefill circuit, and ancillary infrastructure, including the new workshop and power station. The tour also provided an overview of the haul road upgrades on the way to the underground portal. A helicopter tour covered our exploration sites and provided aerial views of the operation, and participants viewed an extensive selection of drill core from the many exciting deposits we are currently drilling.

During the underground tour, the group experienced several key enablers firsthand, including the high-speed twin incline, internal ramp, and material pass, as well as the primary fans operating during final commissioning. The visit also included a comprehensive tour of the underground paste plant under construction, along with a high-grade development face. I am pleased to report that the primary ventilation fans have since been fully commissioned and are now operational, a milestone we will cover in more detail later in the presentation. Overall, we believe that the visit provided an excellent opportunity to demonstrate the scale of our infrastructure investments, the significant progress achieved to date expanding the operation, and the operational capabilities supporting Kainantu's next phase of growth. As shown on the long section and as highlighted in the site visit, the underground mine has undergone a major transformation.

The twin incline was completed in 2024, followed by the internal ramp system in the first quarter of 2026. The completion of the first material pass in Q3 last year and the second in June 2026 has already provided a significant boost to underground material handling capacity. A third material pass is on track to be operational by year-end. The excavation of a fourth pass is also expected to be completed by year-end and operational in Q1 2027. The delivery of the pastefill system will be another key enabler of the stage three and four expansions, particularly stage four, providing greater flexibility in mine sequencing and improving stoping performance, including lower dilution, reduced waste rehandling, higher mining recoveries, and lower TSF demand. On this slide, we have provided several images to highlight the significant positive impact of some of the key enabler projects.

Starting with the twin incline, the image on the top left is the incline acquired from Barrick, which moved all of the production stoping tons until recently. The image to the right of it is one of the new inclines we completed, which enables 50% larger trucks and much faster speeds. In late January, we completed the internal ramp, enabling all of the mining fronts to now be connected to the highly productive twin incline. As you can see from the image, this was a big deal for the crews, with the banner stating, "We are one mine." Before then, we operated two separate crews and fleets for the lower and upper mine respectively. Now, we are much more efficient as one mine.

As shown on the prior slide, a large majority of the resource sits above the twin incline, which gives us a significant gravity advantage that we are leveraging through the installation of material passes. Our two operating material passes, one for ore and one for waste, are already putting this gravity advantage to work. As noted on the previous slide, two more passes are planned to come online in the near term. The image on the bottom left shows a truck that has been loaded on a nearby sublevel, hauled a short distance, and directly tipping down the ore pass. For this particular pass, the material travels down approximately 350 meters vertically. It is then loaded onto trucks in the twin incline. As you can see, these dedicated ore and waste passes are now allowing material to move more efficiently from the upper mine to the main haulage infrastructure.

As I mentioned earlier, we are very pleased to announce that the phase four primary ventilation upgrade is now fully operational since late October. As you can see in this drone footage, even with the fans operating at just 50% capacity, a substantial volume of air is moving through the ventilation chamber. These two large primary fans have replaced a series of smaller, less efficient fans previously distributed throughout the mine, making up the primary ventilation circuit. The new system draws fresh air into the mine through the twin inclines and the old incline, while exhausting air to surface through the new Puma vent incline. This is a significant milestone for the operation, removing ventilation bottlenecks to improve mine blast reentries, improve traffic flow, and increase the number of active work areas.

This upgrade provides capacity well beyond the current stage four expansion and life-of-mine requirements, capable of 600 cubes per second airflow, with potential to increase overall airflow to over 700 cubes per second. The fans are equipped with variable speed drives, allowing them to operate at reduced speeds to conserve power before being progressively ramped up as the mine expands and ventilation demand increases. We made significant progress on our surface haulage road and river crossings during the quarter, completing the Kokomo and Kasese River crossings. With the Baupa crossing completed in April, all three crossings are now trafficable, and the stage three haul road is effectively complete. The remaining stage four upgrades, comprising select road straightening, realignment, and grading improvements, are on track for completion by year-end.

These large-scale investments in the stage three haul road upgrades have increased the surface haulage payload from approximately 20 tons-60 tons, which will result in improved haulage cycle times, lower unit costs, and reduced congestion, supporting the higher material movement rates required for the stage three and four expansions. Five of the eight new 60 ton Volvo trucks have been delivered to site, with the remaining three scheduled for delivery this quarter. This fleet is progressively being introduced, with expected benefits towards the end of the year and into early next year. In addition to completing various infrastructure enablers for the expansion, increased mine development continues to open up new mining fronts. Lower Kora, our second mining front, commenced stoping in April and continued to ramp up during Q3.

We also achieved another important milestone in September, with first stope ore delivered from our third mining front in the twin incline area. We expect to expand to four mining fronts in 2027 with the introduction of pastefill. Importantly, with the significant increase in lateral development rates over the past three quarters, including a record month in July, which exceeded the stage four expansion development requirement of 1,200 meters per month, we plan to further open up existing and new sublevels at a faster rate to build greater operational flexibility. With the introduction of an additional jumbo this quarter and the delivery of key enablers, we expect development to ramp up further in 2027, targeting 1,400 meters per month.

We also have meaningful equipment upgrades underway this year, as shown in the table on the left, with 25 new major equipment units scheduled to arrive between late last year and the end of 2026. Between older unit replacements and new additions, this will increase our overall fleet size by 16 units. This substantial fleet investment ensures that we have adequate capacity beyond the stage three expansion. On the production side, four new loaders have been added to the fleet this year, comprising two additional units and two replacements, and a large Sandvik LH621i loader is scheduled to arrive in Q4. A new explosives charging unit was received on site during the quarter and is now operational, and a new long-hole production drill was also commissioned in late April. Two new underground haul trucks are also on track to be added to the fleet by year-end.

A new development jumbo and a cement agitator truck are also scheduled for delivery toward the end of the year, further expanding the underground fleet and our development capability. We also have three new Sandvik DD422i development jumbos on order and arriving in the first half of 2027 to replace older units to further improve development reliability and fleet availability. As previously highlighted, we are also on the cusp of unlocking higher underground and surface haulage productivities with the progressive introduction of the new 60-tonne Volvo haulage fleet. Supporting infrastructure remains an important part of our expansion program. We are pleased to report that the new maintenance facilities are now complete and have been handed over to operations. As you can see, this is a world-class facility which includes dedicated tire and machine rebuild center facilities to accommodate our expanding equipment fleet.

As previously reported, the phase two power station expansion was completed in May, increasing prime power capacity from 10.7 MW to 15.3 MW. This provides the capacity required for the stage four expansion and additional standby power to support operational reliability. Since commissioning the new power station in October 2025, the operation has seen minimal power disruptions across both the process plant and the underground mine, highlighting the effectiveness of these upgrades. Significant progress has been made on the surface pastefill filtration plant, surface storage facility, and the underground paste plant packages, which comprise the pastefill circuit. This video shows a filter press discharging filter cake at the end of a filtration cycle at our surface tailings filtration plant. The plant is now operational, with production optimization continuing, an important milestone in delivering our overall pastefill system.

During last month's analyst and investor site tour, attendees had the opportunity to observe a full filter press cycle firsthand. Once the underground pastefill system is fully operational, it is expected to redirect approximately 60% of tailings underground, materially reducing the capacity required for surface tailings storage. The filter tailings will be converted into pastefill to backfill stopes, improving ground stability and supporting higher mining rates as we continue to ramp up production. At the surface paste binder blending area and filter cake storage facility, structural, mechanical, and piping works were completed in Q3. The remaining electrical and instrumentation installations are progressing towards commissioning this quarter. At the underground paste plant, all major equipment has now been installed, including the silo hopper, paste, and colloidal mixers on the 1205 level, both paste pumps and the paste hopper on the 1170 pump chamber level.

Remaining civil, structural, mechanical, and electrical works, together with the paste reticulation installations, continue to advance with commissioning targeting commencement late this quarter. We were pleased to show the rapid progress in these areas on the analyst and investor site tour, where we visited the three levels that make up the underground pastefill plant system. In summary, the third quarter represent another significant period of progress across the stage three and four expansions, with the phase four ventilation upgrades, stage three expansion haul road upgrades, and maintenance workshops now with a green check mark against them. As you can see, the majority of our major infrastructure projects are now complete or nearing completion, positioning us to realize the benefits of these investments through higher production rates, greater operating flexibility, and improved cost efficiencies.

Importantly, as these projects transition from construction to operation, we expect them to help deliver continued production growth and increase free cash flow generation. I will now turn it over to Rob Smillie, VP Exploration, to provide an update on our exploration activities.

Rob Smillie

Thank you, Dave. Exploration remains a central part of K92 Mining's long-term growth strategy. Our programs continue to focus on expanding the Kora and Judd vein systems, advancing Arakompa, and evaluating highly prospective regional targets across our district-scale land package. We currently have seven underground drill rigs operating at Kora and Judd, five surface rigs at Arakompa, one at the newly established Judd North area, and one contractor rig at Wera. An additional surface rig is undergoing a rebuild for planned deployment at Mati-Mesoan in Q1 2027, bringing our total fleet, including this rig, to 15. We have also ordered two additional underground rigs and two additional surface rigs for delivery in 2027, increasing to a total of 19 rigs. The substantial increase in mine development rates is also strategically important for exploration, as it allows us to progressively establish new underground drilling platforms for resource expansion drilling.

At Kora, drilling continues to advance concurrently across multiple fronts along more than 2.5 km of drill-defined strike. From the twin incline, we are targeting Kora Deeps, Kora North Deeps, and Kora South Deeps, while a separate program from the 1205 level drill drive is testing Kora South. At Kora Deeps, drilling is targeting down to 500 meters RL over the next 12 months, building on thick, high-grade mineralization intersected below the twin incline. Results continue to deliver strong dilation zone intercepts, while increased drill density is extending and improving our understanding of the high-grade zones. Importantly, drilling has also delineated a substantial high-grade copper zone to the south of Kora across both the K1 and K2 veins, with copper grades increasing at depth in K1.

The consistency of these high-grade intersections, including multiple intercepts exceeding 4% copper, is particularly encouraging and suggests the development of significant copper-gold corridor extending towards the A1 porphyry target. With Kora remaining open along strike, up dip, and at depth, we see considerable potential for further resource growth. We are targeting the release of an updated mineral resource and reserve estimates for both Kora and Judd in the late first quarter of 2027. Similarly, at Judd, drilling continues to test the Judd South, and Judd Deep systems, which remain sparsely drilled, with drill-defined strike length having grown more than 130% since the end of 2021. Judd Deep's drilling is progressing from the twin incline, targeting down to 500 meters RL over the next 12 months, while Judd South drilling also continues.

We're excited to share that surface drilling at Judd North also commenced in the third quarter to test a prospective up-dip extension over 800 meters strike and 250-500 meters vertically. Previous drill highlights in this area include 20 meters at 14 grams per ton gold equivalent, 12 meters true thickness, and 3 meters at 15 g per ton gold equivalent, 2 meters true thickness. The Judd system remains significantly underexplored and open in all directions. Arakompa is one of our most exciting exploration opportunities. Located approximately 4.5 km from the Kainantu process plant, Arakompa hosts high-grade vein mineralization, broader bulk tonnage mineralized zones, and an emerging porphyry target. In our June 2026 update, as shown on the long sections, we reported results from 33 holes from the surface diamond drilling program for a total of 100 holes released to date.

The program significantly expanded our understanding of the AR1 and AR2 high-grade lodes and demonstrated substantial potential for resource scale and grade uplift, highlighted by an up to 400 meter strike by up to 300-meter vertical high-grade area at AR1, averaging 9.47 g per ton gold equivalent over 4.3 meters true width. Additionally, we significantly expanded our bulk tonnage zone, including drill highlights of 99 meters at 2.9 grams per ton gold equivalent and 105 meters at 2.26 grams per ton gold equivalent. The June results also included significant porphyry step-out intersections following discovery hole KARD0065. Highlights included 1,151.2 meters at 0.3% copper equivalent, 800.7 meters at 0.33% copper equivalent, and 494 meters at 0.35% copper equivalent. These holes encountered outer potassic alteration, providing encouraging vectors towards a potentially higher-grade core. Given the significance of this target, we've allocated a second rig to accelerate porphyry drilling.

Since our last update, we have completed an additional 23 holes. The maiden resource for Arakompa is targeted for late 2026 or the first quarter of next year. We look forward to providing an update in due course. This graphic really captures how quickly Arakompa has grown, from just two holes reported back in February 2024 to 100 holes reported as of this latest release. The mineralized footprint has expanded steadily with each press release, and increased drill infill density is strengthening our geological model with each phase of drilling. We continue to see meaningful upside from the high-grade veins, bulk tonnage zones, and the emerging porphyry target to the south. We believe Arakompa represents an important opportunity for future resource growth for K92 and potentially additional production sources within the broader Kainantu district.

Turning to Mati-Mesoan, this is a high-priority near-mine target immediately adjacent to ML150, within 1.6 km of our current mine workings and with no previous drilling. Importantly, mineralization is hosted in northwest-trending faults parallel to Kora and Judd, and the same metasediment host rock, with four potential gold lodes mapped within faults up to 2.5 km long. A program of systematic soil sampling and trenching was undertaken over the last two years to delineate drill targets. Existing artisanal workings indicate robust vein thickness in this area, and we are extremely excited to drill test this area, scheduled to commence in Q1 2027. Having an undrilled, highly prospective target like Mati-Mesoan within 2 km of existing mine workings demonstrates that we are still scratching the surface of Kainantu's true potential.

At Wera, about 10 km southwest of Kora and Judd, our first scout drilling program is well underway. We are testing vein targets identified through trenching, with 10 holes completed this quarter. What encourages us at Wera is both the scale of the system and its location along the same regional structural corridor that hosts Kora, Judd, and Arakompa. Our surface work has outlined an epithermal vein system across an area approximately 3.5 by 3.5 km, and it remains open along strike to the northeast and southwest. Several rock chip samples returned more than 20 g per ton gold, with the highest at 26.3 g per ton. We are now testing how these veins continue below surface. Overall, we remain very encouraged by the scale and diversity of the exploration opportunities across our land package of more than 830 sq km.

We look forward to further expanding our exploration programs in 2027, increasing our overall and surface exploration fleet from 15 concurrently to 19 rigs. I will now turn the call back to David for concluding remarks.

David Medilek

Thank you, Rob. In summary, K92 Mining delivered another quarter of strong operational and financial performance, with production being our second highest on record at 49,776 gold equivalent ounces, multiple operational records achieved, and a record cash balance of $389.9 million, further strengthening the business as we advance to stage three and four expansions. We also achieved a significant milestone of producing more than 1 million gold equivalent ounces since commercial production began in February 2018. The operational momentum is very encouraging, and we are pleased with the delivery of key infrastructure projects during the quarter and the rapid progress being made on remaining key projects. Looking ahead, we expect the fourth quarter to be our strongest production quarter for the year, and we remain confident in our full-year production guidance of 190,000 to 225,000 ounces of gold equivalent.

Exploration continues to advance across both near-mine and regional drill programs, and we look forward to providing updates in due course. Across our business, we remain focused on safety, supporting our communities, and delivering sustainable benefits for our stakeholders. With that, operator, we are happy to open the line for questions. Thank you. Thank you, operator, and thank you everyone.

Operator

Thank you. We will now begin the question-and-answer session. To join the question queue, you may press star then one on your telephone keypad. You will hear a tone acknowledging your request. If you're using a speakerphone, please pick up your handset before pressing any keys. To withdraw your question, please press star then two. The first question comes from Fanming Zeng with Stifel. Please go ahead.

Fanming Zeng

Hi, thanks for taking my question. My first question is regarding the capital allocation with our stage three CapEx at 98% spend and stage four is framed as a low CapEx extension, our production is ramping up. How should we think about a 2027 spending priority across stage four, our growth projects, explorations versus return of capital?

David Medilek

Yeah, thank you. Thank you very much, Fanming, for the question. You are absolutely right that the stage three expansion spend is largely behind us, 98% spent or committed. I think the spent number is close to 96%, and we are tracking very much in terms of the guidance that we put out at the beginning of the year. In terms of the stage four expansion capital, I will talk about 2026 first. We did provide guidance. What I do expect is that you will see a slight underspend relative to guidance, because we did defer the power line project, and we brought forward the stage four power plant upgrade instead. In terms of 2027, what I would say is that we are currently doing the budgeting process, so I do not want to provide you guidance at this point until we do have an approved budget.

Fanming Zeng

Okay, thank you very much. I do have a follow-up on our tailing capacity. I see that the EIS submission is moved to Q1 2027. Can you remind me how many months of capacity remain in our existing tailing facility at our current throughput, and do you see any risks regarding the tailing versus our ramping up throughput? Thank you.

David Medilek

Yes. Our existing tailings capacity, there are multiple lifts that are still to be completed, and that takes us through, as shown in our Integrated Development Plan, that does take us through until mid-2029. The EIS that you are referring to is in relation to the Baupa tailings facility, which is a new tailings facility. We are actually looking to get that approved and constructed ahead of the requirements with the existing tailings facility, because it actually becomes cheaper for us to deposit the tailings in that new facility than the existing facility.

Fanming Zeng

Okay, thank you very much. Good luck with Q4.

David Medilek

Yeah. Thank you, Fanming. Appreciate that.

Operator

Once again, if you have a question, please press star then one. The next question comes from Alex Terentiew with National Bank. Please go ahead.

Alex Terentiew

Hey, guys. Thanks for taking my questions. Look, since I was on site last month to see firsthand the substantial work that was done, I do not actually have many questions, but two small ones I do have. First, just on Q4, you guys are talking about having your strongest quarter of the year. That does align with my numbers. Can you just give us maybe a bit of color? Is that a combination of both throughput and grades, or one or the other? I know Q3, I think, you guys had record throughput, and just trying to gauge for Q4, should you be running the mill kind of full out still, or do you think you can kind of go back to some of your batching like you did in the past, but put through higher grades?

David Medilek

Yeah, thanks for the question, Alex. On Q4, we certainly expect a progression, upward progression in terms of the physicals. We do see it as our strongest quarter driven by a combination of higher physicals, but also higher grade stoping sequence. That positioned us for what we see as the strongest quarter of the year.

Alex Terentiew

Okay, great. Just maybe just where on Mati-Mesoan. I know, Robert, you mentioned some of this in your comments, but apologies if I may have missed it. Can you just maybe break down a little bit in terms of schedule for your activities for these targets? I know we talked about them quite a bit on the site tour as well, but for Mati-Mesoan and Wera really, just Q1, Q2, when do you kind of expect to start drilling there, your cadence of drilling, and when we could start to see first results from those two targets?

David Medilek

Yeah. I'll just jump in for that because Rob's in an area of poor comms at the moment. Mati-Mesoan, we are targeting getting there in Q1. We've actually already started pad construction, and we're obviously, as you can tell from the profiling in the conference call, we're quite excited. There's some really good surface sampling, really good trenches, and we also have the confirmation in terms of the strong mineralization that some of the artisanals are mining. In terms of Judd North, we have a rig on it. That came in in September. There are plans to get another drill rig there. There's also plans to get a rig in what we call Arakompa North, which is a northern extension of Arakompa, which you would have seen at the site visit. There is pad construction that's currently underway, setting that site up.

What you're going to see from us, and as you saw from Rob's comments, is we're certainly ramping up the drill rigs, and we're ramping up the drill rigs where we're going to be drilling multiple high-priority targets concurrently, which I think is quite exciting. Concurrent to that, there is the increased activity in terms of the underground, which is going to certainly benefit from the increased development rates, which is opening up more drilling platforms in more areas.

Alex Terentiew

Okay, that's great. Thanks, guys.

David Medilek

Yep. Thank you, Alex.

Operator

Once again, if you have a question, please press star then one. Since there are no further questions, this concludes the question and answer session and today's conference call. You may disconnect your lines. Thank you for participating, and have a pleasant day.

Historical data USD · newest first

DateOpenHighLowCloseChangeVolume