MDU rose modestly, about 0.7%, in line with a broadly firm tape for utilities and infrastructure stocks; the provided sources contained no company-specific news, so this looks like routine market-driven buying rather than a distinct catalyst.
Wall Street has a Strong Buy consensus on MDU Resources, with 4 of 5 analysts (80%) bullish, 1 (20%) neutral and none bearish. The average price target is $23.80 (median $23.00), and targets range from $22.00 to a high of $27.00. Even the low end of that range is a Hold-level target, so the group agrees on a modestly positive outlook. Recent momentum is positive. Freedom Broker upgraded the stock to Buy from Hold on Nov. 12 and raised its target to $23 from $21. JP Morgan upgraded to Overweight in August with a $27 target, the Street-high, and Wells Fargo initiated at Overweight with a $25 target in July. The one holdout is TD Cowen, which reiterated Hold with a $22 target on Nov. 18. This sentiment follows MDU's mid-November increase of its five-year capital investment plan to $3.5B for 2027–2031, with the Bakken East project potentially adding up to $3.1B, which supports the growth story behind the upgrades.
▲ Bull caseShares trade near $19 against consensus targets of roughly $23 to $24, implying 17% to 27% upside. The narrative fair value of $23.63 suggests a regulated utility is mispriced, and Jefferies, Wells Fargo and JPMorgan targets of $25 to $27 reinforce a meaningful discount.[3][10][1]
▼ Bear caseA P/E of about 22x to 29x versus a sector near 17x signals expensive valuation, and a DCF value of $17.37 sits below the current price. Earnings fell sharply, so any sentiment slip could compress the multiple. TD Cowen and Citi hold at $22 targets.[3][5][9]
▲ Bull caseThe board-approved Bakken East pipeline, a $2.7 billion to $3.2 billion, 350-mile project, plus possible transmission and generation for data centers, supports earnings and revenue growth as projects enter service through 2029 and 2030, underpinning upgrades from Freedom Broker and JPMorgan.[3][7][1]
▼ Bear caseLong-dated projects depend on precedent agreements and data center demand, which could soften. Execution risk is high, and the narrative could shift quickly if contracts weaken. Wall Street Zen's downgrade to sell and several holds show skepticism about how reliably this growth materializes.[3][9]
▲ Bull caseManagement reaffirmed 2026 EPS guidance of $0.93 to $1.00 and held the $0.145 quarterly dividend, indicating stable regulated operations. Analysts expect about $0.98 EPS this year and next-quarter estimates of $0.40, supporting confidence in earnings delivery and funding capacity.[3][9][10]
▼ Bear caseHeavy capital spending raises concerns about returns on equity, balance sheet pressure, interest cover and dilutive equity funding. Trailing EPS of $0.65, earnings growth of -74% and revenue growth of -38% weaken the case. Consensus remains Hold with four of seven analysts neutral.[3][5][9]
Largest moves in the past year from daily prices
Nov 5, 2026
Sharp DropVolume 2.7× avgGap Down 4.1%
MDU fell 6.5% to close at $18.53, opening 4.1% below the prior close. Intraday range of $1.44 ($18.52 – $19.96) spanned 7.8% in a volatile session. Volume reached 4.37M shares (2.7× the 20-day average). Closed near the day's low as sellers pressed into the close.
-6.5%
Aug 7, 2026
Gap Down 6.1%
MDU fell 1.0% to close at $20.55, opening 6.1% below the prior close. Intraday range of $1.22 ($19.50 – $20.72) spanned 6.3% in a volatile session.
-1.0%
May 11, 2026
New 52-Week High
MDU gained 1.4% to close at $22.80. Set a new 52-week high of $22.98.
+1.4%
May 5, 2026
New 52-Week High
MDU fell 0.3% to close at $22.46. Set a new 52-week high of $22.83.
-0.3%
May 1, 2026
New 52-Week High
MDU gained 0.3% to close at $22.60. Set a new 52-week high of $22.75.
+0.3%
Apr 30, 2026
New 52-Week High
MDU gained 2.6% to close at $22.53. Set a new 52-week high of $22.68.
+2.6%
Apr 9, 2026
New 52-Week High
MDU gained 0.7% to close at $22.32. Set a new 52-week high of $22.47.
+0.7%
Apr 8, 2026
New 52-Week High
MDU gained 2.7% to close at $22.17. Set a new 52-week high of $22.22.
+2.7%
Apr 7, 2026
New 52-Week High
MDU gained 0.9% to close at $21.59. Set a new 52-week high of $21.65.
+0.9%
Apr 6, 2026
New 52-Week High
MDU gained 0.4% to close at $21.40. Set a new 52-week high of $21.44.
+0.4%
Mar 13, 2026
New 52-Week High
MDU gained 1.0% to close at $21.10. Set a new 52-week high of $21.40.
+1.0%
Mar 6, 2026
New 52-Week High
MDU fell 1.4% to close at $20.97. Set a new 52-week high of $21.39.
-1.4%
Price forecast 12-month price targets from 5 analysts
Price, past yearBuy targetHold targetSell targetConsensus high · average · low
Average price target
$23.80
▲ 24.3% upside
High$27.00 +41.1%
Median$23.00 +20.2%
Low$22.00 +14.9%
Current price$19.14
Change is measured from the current price. Targets are analysts’ 12-month views, not facts.
Analyst estimates · fiscal years · E = consensus estimate
Latest earnings analysis · Q3 FY2026 · Nov 5, 2026
Q3 2026 earnings were $14 million, or $0.07 per share, versus $18.4 million, or $0.09 per share, a year ago. Adjusted earnings were $16.6 million, or $0.08 per share, excluding a $2.1 million after-tax loss from discontinuing the Not-Landfill RNG project and Bakken East advisory costs. Lower returns on nonqualified benefit plan investments reduced EPS by about 1.5 cents. Year-to-date operating income rose 15% to $211.2 million.
The company reaffirmed 2026 EPS guidance of $0.93 to $1.00, assuming normal weather and constructive regulatory outcomes. The long-term EPS growth objective remains 6% to 8%. Management gave no 2027 guidance and expects to provide it with the Q4 call in February. It expects to file 3 to 5 rate cases annually.
The board approved the final investment decision on the Bakken East Pipeline, with capital narrowed to $2.8 to $3.1 billion. The pipeline spans 350 miles, carries 1.4 Bcf/d, and uses 42-, 36-, and 30-inch pipe with 4 new compressor stations. In-service dates are late 2029 and late 2030, and the FERC 7C filing is still expected in Q4.
Financing options for Bakken East, including financial and strategic investors, are being actively evaluated, with WBI Energy to retain majority ownership and operational control. No financing details were given, and more is expected on the February call. An updated 5-year capital plan will be released later this month after the EEI conference.
Electric segment earnings rose to $26.5 million from $21.5 million, helped by $7.1 million in new rate revenue, $3.2 million from Badger Wind Farm, and retail volumes up 9.3% (data center volumes up 18.4%). Over 1 GW of data center load is signed under ESAs, with about 280 MW online. Pipeline earnings fell to $13.1 million from $16.8 million, and the gas distribution seasonal loss widened to $20.7 million.
I will now hand the conference over to Brent Miller, treasurer of MDU Resources Group. Brent, please go ahead.
Brent Miller
Thank you, Jen, and again, welcome everyone to our third quarter 2026 earnings conference call. Our earnings release and supporting materials for this call are available on our website at mdu.com under the Investors section. Leading today's call are Nicole Kivisto, president and chief executive officer, and Jason Vollmer, chief financial officer of MDU Resources Group. During today's call, we will make certain forward-looking statements within the meaning of the federal securities laws. Please refer to our SEC filings for a discussion of risks and uncertainties that could cause actual results to differ. We may also refer to certain non-GAAP information. For a reconciliation of any non-GAAP information to the appropriate GAAP metric, please refer to our earnings release. I'll now turn the call over to Nicole for her prepared remarks. Nicole?
Nicole Kivisto
Thank you, Brent, and good afternoon, everyone. We appreciate you joining us today and for your continued interest in MDU Resources. This morning, we reported third-quarter 2026 earnings of $14 million, or $0.07 per share. Our results reflected solid performance for the underlying businesses, including strong performance at our electric segment, benefiting from new rates, the Badger Wind Farm, and higher retail sales volumes. We are also reporting adjusted earnings to reflect the impact of a couple items not reflective of ongoing operations. At the natural gas distribution segment, a decision was made to discontinue development of the Knott Landfill Renewable Natural Gas Project, and at our pipeline segment, we incurred advisory costs associated with the Bakken East Project that are not eligible to be capitalized as part of the project cost. Adjusted earnings absent these items were $16.6 million, or $0.08 per share for the quarter.
Jason will provide more detail on the quarterly results later during this call. The most significant milestone this quarter was our board's positive final investment decision to proceed with WBI Energy's Bakken East Pipeline Project. This decision reflects the customer commitments we have secured, our confidence in the strategic importance of the project, and our belief in the long-term economic opportunities it creates for MDU Resources, North Dakota, and the broader region. We have narrowed our estimated capital investment range to between $2.8 billion and $3.1 billion and finalized the project design, which will include segments of 42-inch, 36-inch, and 30-inch diameter pipe. We also expect four new compressor stations along the 350-mile route, with additional compression at two existing facilities on our system.
The project remains designed to transport 1.4 billion cubic feet per day of natural gas and will be constructed in two phases, with in-service dates of late 2029 and late 2030. We are still anticipating a 4Q filing date for our FERC 7(c) filing and are also actively evaluating financing options, including potential participation of financial and strategic investors, while maintaining our expectation for WBI Energy to retain majority ownership and operational control. We also continue to see encouraging development activity across our service territory, including data center opportunities and broader infrastructure demand. As we have discussed previously, our approach to serving data centers and other large load customers is grounded in protecting existing customers while ensuring growth creates value for the communities we serve. We continue to follow the principle of cost causation. Customers that create costs are responsible for those costs through contracts, approved tariffs, and regulatory mechanisms.
This approach allows existing customers to benefit from broader utilization of our system while supporting economic development opportunities within our service territory and results in a reduction to customer bills. As an example, since 2023, we have returned $45.4 million to our North Dakota customers with this approach. We currently have over 1 GW of data center load signed under ESAs, with approximately 280 MW currently online and additional volumes expected to ramp online over the next few years. As I did mention during the quarter, we did make the decision to discontinue development of the Knott Landfill Renewable Natural Gas Project in Oregon due to continued increased development costs and changes enacted by rulemaking that have shifted the timing and reduced the volume of our need for the renewable natural gas in the state.
We believe this decision reflects disciplined capital allocation and a continued focus on investments that are expected to provide the strongest long-term value for customers and stockholders. This decision resulted in the recognition of an after-tax loss of $2.1 million in the quarter. Now moving on to regulatory matters. In North Dakota, interim electric rates of $26.3 million became effective September 1st, subject to refund. In Montana, interim electric rates of $10.4 million remain in effect, subject to refund, while the settlement agreement of $10 million is still pending approval. At our natural gas distribution segment, a $12.2 million annual revenue increase was approved in our Oregon rate case settlement, with rates effective October 31st. We also filed a Minnesota rate case on October 30th, requesting an annual revenue increase of $4.5 million.
An interim rate increase request of $3.9 million was also filed and, if approved, will be implemented on January 1st, 2027. Our Washington multi-year rate case filed in May remains pending before the commission. At the pipeline segment, rates from the FERC rate case we filed in May will become effective December 1st, subject to refund and the outcome of hearing procedures if a settlement with our customers in FERC is not reached. We have made significant progress on the regulatory front, and with continued deployment of our capital plan, we believe we will be filing about three to five rate cases annually. As we near the end of the year, we have delivered solid underlying business performance, advanced regulatory initiatives, executed on a robust capital plan, and made a strategic decision to advance the Bakken East project.
Despite the negative weather impacts in the first quarter, we demonstrated solid performance on a year-to-date basis, putting us in a position to reaffirm our 2026 earnings per share guidance range of $0.93-$1.00. This guidance continues to assume normal weather, economic, and operating conditions, continued customer growth, successful execution of our capital investment plans, and constructive regulatory outcomes for the remainder of the year. Our long-term earnings per share growth objective remains at 6%-8%. We remain focused on disciplined execution of our capital program while advancing infrastructure investments that support growing energy demand throughout our service territories. As always, MDU Resources is committed to operating with integrity and with a focus on safety. We remain dedicated to delivering safe, reliable, cost-effective, and environmentally responsible energy services while positioning the company for compelling long-term growth.
I will now turn the call over to Jason for the financial update. Jason.
Jason Vollmer
Thank you, Nicole. This morning, we announced third quarter earnings of $14 million, or $0.07 per share, compared with $18.4 million, or $0.09 per share, in the third quarter of 2025. Adjusted earnings for the quarter totaled $16.6 million, or $0.08 per share. Year-to-date earnings were $116.1 million, or $0.55 per share, compared with $114.1 million, or $0.56 per share, through the first nine months of last year. Adjusted year-to-date earnings totaled $119.4 million, or $0.57 per share. We did experience lower returns on nonqualified benefit plan investments when compared to the same quarter last year, which impacted all of our business segments. In total, this reduced earnings by approximately $0.015 per share when compared to the third quarter of 2025. Operating income for the quarter was $47.6 million compared to $39.8 million in the third quarter of 2025.
On a year-to-date basis, operating income was $211.2 million compared to $183 million last year at this same time. This 15% increase in operating income highlights the strength of our operations and the meaningful impact that our growth projects and positive rate case outcomes have had over the last year. Now let's turn to our individual business segments. Our electric utility reported third-quarter earnings of $26.5 million compared with $21.5 million in the third quarter of 2025. The increase was driven by $7.1 million in additional revenue from new rates approved in North Dakota, Montana, and Wyoming, $3.2 million in earnings from the Badger Wind Farm investment, as well as higher retail sales volumes across all customer classes due to warmer weather. Total retail electric sales volumes increased 9.3% year-over-year, and data center sales volumes increased 18.4%.
These favorable impacts were partially offset by higher operation and maintenance expense, as well as lower returns on nonqualified benefit plan investments. Our natural gas distribution segment reported a seasonal loss of $20.7 million compared to the seasonal loss of $18.2 million in the third quarter of 2025. This year-over-year decline reflects higher operation and maintenance expense costs, including payroll-related expenses and the $2.1 million after-tax loss related to the Knott Landfill project that Nicole previously discussed. Higher interest expense and lower returns on nonqualified benefit plan investments also contributed to the decrease. These impacts were partially offset by new rates, particularly in Idaho, Washington, and higher retail sales volumes across all of our customer classes. Pipeline segment earned $13.1 million during the quarter compared to $16.8 million in the prior period.
Results were impacted by higher operation and maintenance expense, including payroll-related and materials costs, as well as advisory costs related to the Bakken East project and lower storage injections and lower returns on nonqualified benefit plan investments. These impacts were partially offset by short-term natural gas transportation contracts and contributions from previously completed growth projects. The other category reported a net loss of $4.9 million compared to a net loss of $1.7 million in the third quarter of 2025. The decline was primarily related to higher claims experience within our captive insurance operations and higher income tax expense associated with adjustments related to the company's annualized effective tax rate. We continue to maintain a strong balance sheet and ample access to working capital to finance our operations. That summarizes our financial highlights for the quarter.
We appreciate your interest in MDU Resources and would ask that we now open the line for questions. Operator?
Operator
Thank you. We will now begin the question-and-answer session. If you would like to ask a question, please raise your hand now. If you have dialed into today's call, please press star one to raise your hand. Please stand by while we compile the Q&A roster. Your first question comes from the line of Aidan Kelly with J.P. Morgan. Your line is open. Please go ahead.
Aidan Kelly
Hey, guys. Good afternoon. Thanks for the time today.
Nicole Kivisto
Good afternoon.
Aidan Kelly
Yeah, maybe just to pick up on Bakken East to start, the elephant in the room. How are you evaluating the trade-offs between financial partnerships as of now? I know you kind of mentioned, obviously, as you look to kind of maintain that majority ownership structure. Just curious, how we should think about also the potential to kind of mitigate external equity needs while kind of preserving the longer-term earnings contribution? Just any kind of in-depth color, how you think about the equity portion at this point in time?
Nicole Kivisto
Yeah, I'll have Jason Vollmer go ahead and talk about this. But certainly, we are keeping the options open, as we did mention in the script as well as the news release. Our parameters are that we want to be the majority owner as well as the operator of the pipeline, but continue to evaluate the financing options. But Jason Vollmer, maybe you want to provide additional detail there.
Jason Vollmer
Yeah, certainly. Great question, Aidan. Appreciate the follow-up here. As we know, a high-focus item for investors, think about the size of an important project like this for our business. Our base capital plan that we've been working on here, again, would have updated last year in November. We'll probably update that here again towards the end of November on the business as we look forward here. We have a sizable amount of capital investment that we are spending on this company, even outside of this Bakken East project. We're extremely excited about the Bakken East project and where this is going to go. I think your point on balancing external financing needs along with executing the existing business plans here is very important.
As we look at longer term what this project will do for the organization, certainly a very positive project to bring into the group. We want to make sure that we are looking overall at the investments we're making and making sure that we've got a good ability to finance this and provide solid returns for our investors into the long term. So, to Nicole's point, we are looking at all options for how to finance this project. We're actively pursuing that as we speak here today. We don't have a lot of updates for you at this point in time. As we get into the new year and think about our Q4 call that we would have in February, I would expect we will have a lot more color on that, likely as far as where we're at in the process of finalizing those opportunities.
It's a high-focus item for us here internally, making sure that we balance the appropriate return for investors going forward with also looking at the impact of the ongoing business here and making sure we've got the right financing structures in place.
Aidan Kelly
Great. Thanks for the rundown on that, Jason. Sounds like to keep our eyes peeled for 4Q plan refresh, I guess. Maybe just one other question on my end, turning to some of the disclosures on the project itself. It looks like you've narrowed the cost range slightly to 2.8 to 3.1. Just curious if you could provide any detail on what gave you the confidence to tighten the range at this point in time? Any rationale behind the revised compressor station configuration and whether there's any read-through for implications on project costs or future expansion capacity there? Any detail there would be great.
Jason Vollmer
Yeah, certainly. I can provide a little bit of detail on that. As we think about, again, this project, as you know, we've been working on this for a long time, looking at different design routes, various items that would make sense here. The new item that we would have talked about now is that we have finalized the pipe sizes with this, really starting with 42 inch in the west, going to 36, and then down to 30-inch pipe. What that does do, and specifically to your compressor station question, is it does allow us to operate this more efficiently with less compression needed from a larger pipe basis, which then offsets some need for additional compression, but also, for customers involved here, will reduce fuel costs for them on a go-forward basis as well.
We think that is the optimal structure based on what we've determined with where we're at now. That does change a little bit of the calculus, I guess, on the overall cost. Narrowing the range now, I think what we've been able to do as we've continued to progress and work on this project, reaching FID in the end of September was a very important milestone for us. Now moving forward, we've been able to take some of the unknowns that we would have here and make them a bit more known as we've continued to work through.
Again, getting in front of the finalizing the design, understanding what compressor items we need, getting orders made in certain areas, working on pipe design, pipe mill space, working with contractors, gave us a lot more clarity to be able to narrow down and really kind of take in the bookends of that range and narrow to something that we feel very comfortable with here now, landing in this $2.8 billion-$3.1 billion range.
Nicole Kivisto
Yeah, and the only thing I would highlight-
Aidan Kelly
Great. Thank you.
Nicole Kivisto
Just highlight one more.
Aidan Kelly
Yeah.
Nicole Kivisto
Oh, go ahead. I'm sorry.
Aidan Kelly
No, all you, Nicole. Thanks.
Nicole Kivisto
Yeah, I was just going to highlight one more item that you would note for CapEx as it relates to the pipeline. You would have seen an increase compared to last quarters. Basically, once we got to FID, we're bringing those into CapEx. What that CapEx demonstrates is we are making some of these decisions that Jason alluded to. We've been working through this project for quite some time, but we're now able to kind of get to a decision point and lock some of these things in as we finish out the year. That actually helped us then, to his point, narrow that range a bit.
Aidan Kelly
Got it. That's super clear. Well, appreciate all the color, and I'll leave it there. See you guys soon.
Nicole Kivisto
Thank you.
Operator
Your next question comes from the line of Julien Dumoulin-Smith with Jefferies. Your line is open. Please go ahead.
Brian Russo
Yeah. Hi, it is actually Brian Russo on for Julien. Good afternoon.
Nicole Kivisto
Good afternoon.
Brian Russo
Hey, you mentioned a Q4 kind of update. Is it at all possible to get some insight into who the partner might be or financing structure when you report the updated CapEx with your usual annual update, I guess, in November?
Nicole Kivisto
Yeah, our normal cadence, I think, that you are referring to is when we update and refresh our five-year capital plan. We normally do that following EEI. As Jason mentioned, I do not know that we will be in a position to be disclosing anything additional as it relates to financing. What he alluded to would be, we would have more information at our year-end call, which is more in the February timeframe.
Brian Russo
Okay, understood. When we look into 2027, given the cases that have concluded for partial year contribution this year, full year next year, along with the interim rate filings, do you think you can kind of move back up comfortably in the middle of the high end of that 6%-8% long-term range, just based on rate relief?
Jason Vollmer
Yeah, I can take that one, Brian. I think as we look ahead now, we certainly have not given guidance beyond 2026 at this point. We did update and reaffirm our guidance, I guess, for 2026 at this point. We feel comfortable with that range we've got now. As we look to 2027, certainly the rate case activity that we've had, along with some of the growth projects we've had here, I think will continue to provide benefit for us as we look forward. But I don't want to get ahead of foreshadowing any guidance for next year yet. We just haven't given that yet. That's typically a fourth quarter cadence for us as well. So again, similar timeframe with what Nicole just mentioned with our fourth quarter call.
Brian Russo
Okay. Lastly, we've seen some non-utility generation being developed in the region to serve some of your data center customers, I believe. I'm just curious, have you been involved in any of those discussions, and why MDU is in a position to not only serve economic growth through the Bakken East Pipeline, but also through utility-owned generation?
Nicole Kivisto
Yeah, I would just say as we think about the development that we're seeing, and as you know, Brian, it's been our practice to really talk about where we're at with these once we have a signed ESA. But it is fair to say that we continue in conversation on various other opportunities. Now, saying that, I think you're really getting to the question of, are we willing to make investments to serve these types of loads? In the past, we have not done that, so that would be different. What I would say is we're not opposed to that, looking at investment opportunities that make sense.
We're going to want to make sure that we've got the right cost causation, similar to how we've treated these in the past, that the large load pays for that cost, and that it makes sense for our shareholders and customers as well. Again, we will continue to evaluate these opportunities on a case-by-case basis. It's not that we're opposed to investment, but it's going to have to make sense for our shareholders.
Jason Vollmer
Yeah, I would probably just add a little bit to this too. When you think about the pipeline project and what this does for the state of North Dakota, again, getting this FID decision with Bakken East has been very instrumental, I think, not only for our company, but even for economic development across the state. We don't serve the entire state of North Dakota, but North Dakota is a state that has had a lot of data center development going on. So to your point, you're probably seeing others that are announcing generation projects. Where we see the value of the business mix that we have today is our ability to potentially participate by serving data centers ourselves or large load customers of other sorts, if they land in our service territory.
Alternatively, with our pipeline business, we certainly have the ability to serve our generation to serve whatever kind of load that would be, whether that's existing load growth that we may see customers have or whether that is large load customers in there. So, we think we sit kind of in a unique position to be able to capitalize on both opportunities.
Brian Russo
Okay, great. Thank you very much.
Nicole Kivisto
Thank you.
Operator
A reminder, if you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again. We will hold for a moment to allow for questions. There are no further questions at this time. I will now turn the call back to Nicole Kivisto for closing remarks.
Nicole Kivisto
All right, I want to thank you all again for joining us today and for your thoughtful questions. We certainly appreciate your continued interest in and support of MDU Resources. As a reminder, we do plan to release our new five-year CapEx forecast later this month, in line with our typical timing of releasing after the EEI conference. We look forward to seeing many of you at the conference. Finally, I do want to close by once again thanking our employees for their ongoing commitment to safety, reliability, operational excellence, and customer service. It is their dedication that enables us to continue delivering for our customers while advancing opportunities for future growth. With that, we look forward to staying engaged with you throughout the remainder of the year. Operator, you may now conclude the call.
Operator
Thank you. This concludes today's call. Thank you for attending. You may now disconnect.