VolumePre-market / after-hoursUnusual moveNotable move · hover or tap for why
Forward P/E20.76
Market Cap$611.70M
Open$9.73
Trailing P/E15.34
Day Range$9.65–$9.94
Dividend Yield0.00%
52W Range$8.30–$29.70
EPS$0.76
Volume1.14M
Avg Volume1.30M
50-Day Avg$15.27
200-Day Avg$19.60
Why is MUX moving?
MUX rose about 5% in heavy trading as a rebound from an early-session dip to 8.315, with buyers returning to the miner; the provided news doesn't mention a company-specific catalyst.
Wall Street sentiment on McEwen (MUX) is uniformly positive, with a Strong Buy consensus from all 3 covering analysts (100% bullish, 0% neutral, 0% bearish). The average price target is $27.67 (median $27.00), with a range from $25.00 (Canaccord Genuity, set at initiation in October 2025) to $31.00 (Roth Capital). The narrow spread shows the analysts largely agree on valuation, though the coverage pool is small. Recent actions have been trimmed targets with Buy ratings kept: HC Wainwright lowered its target to $27.00 from $28.00 on Nov. 10, after the Q3 2026 earnings miss and sharp selloff. Roth Capital cut its target to $31.00 from $35.00 in August, and both firms have pulled back from their March 2026 highs of $29.50–$35.00. Even so, current targets are well above where they stood in late 2025 ($21–$25). Investor-law-firm investigation notices after the earnings miss add some near-term headline risk, but no analyst has downgraded.
▲ Bull caseManagement changes began influencing results late in Q3, with early Q4 improvements at Gold Bar and Fox. San José should return to normal levels and deliver a seasonally strong fourth quarter. Gold Bar is expected to sustain about 3,000 ounces monthly, supporting production stability and recovery.[5][6]
▼ Bear caseQ3 missed badly, with an adjusted loss of $0.85 per share against an expected profit and revenue of $61.6m versus $72.6m forecast. Production fell over 25% sequentially while costs rose. Turnaround efforts are expected to stretch into 2027, and management changes are having a slower-than-hoped impact.[6][5]
▲ Bull caseAnalysts remain overwhelmingly positive, with seven covering and a consensus Buy. The average target of $28.40 implies about 200% upside from the roughly $9.39 close. Even the lowest target of $24.50 sits far above the current price, suggesting the selloff is overdone.[3][10]
▼ Bear caseTargets keep being cut as execution risks mount. The consensus target fell 9.3%, Roth cut to $27 from $32, and Alliance cut to $24.50 from $31. The stock has dropped far below even the lowest target, which suggests the market doubts the targets.[9][5][8]
▲ Bull caseLos Azules offers major copper growth, with a final investment decision targeted for mid-2027 and a $4b financing package. Management says longer mine lives and Los Azules support long-term growth, and plans to double gold production by 2030. Analysts see a market value gap.[5][6][1]
▼ Bear caseLarge projects could require more equity funding than anticipated, diluting shareholders. Risks include higher operating costs and paused San José dividends, which limit internal cash flow. Revenue estimates for 2027 were cut 16%, so the company must fund growth while operations are weak.[5][9]
McEwen Inc. shares rallied after hitting a fresh 52-week low the prior session, rebounding intraday from about $8.31 to close near the high of the day. The move came as law-firm investigations into its Q3 disclosures continued (Q3 net loss of $36.7M, GEO production down ~23%), and as Chair Rob McEwen outlined Los Azules financing (>$4B need, possible 2027 McEwen Copper IPO). A supportive datapoint was Inventus saying Stock Mill processing of Pardo bulk samples can resume after provincial approval. The bounce ran against a backdrop of heavy pressure on metals: gold fell about 3% to its lowest since August 2025 and silver about 5% amid Fed hike bets, hot core PCE and a broad tariff-driven equity selloff. Volume was well above average, shares are down roughly 49% year to date, and the after-hours price was slightly higher.
McEwen Mining shares slumped as law-firm investigations into its disclosures added to pressure after the weak Q3 report. Pomerantz said it is investigating possible securities fraud claims. Q3 production fell about 23% to 22,852 GEOs, and the company posted a $0.60 per share loss. The stock fell 16.5% on Nov. 10 after those results. Analysts have cut ratings since then, including Zacks to strong sell and Barron's/MarketGrader to sell. HC Wainwright trimmed its target to $27 but kept a buy rating. Shares touched a new 52-week low near $8.90 and closed down 5.70% at $8.94 on above-average volume, giving back part of Monday's gold-driven rebound. Peers such as Hecla, First Majestic and Alamos also fell. Investors are now watching Wednesday's PCE inflation print, which could move metals. Shares were up modestly after hours at about $9.00.
McEwen Mining shares rebounded alongside a broad precious metals recovery, as gold futures jumped roughly 4-5% and silver rose 5-7% after last week's sharpest weekly decline since March. A sweeping equity relief rally, sparked by Nvidia's reinstatement of Jensen Huang, lifted risk appetite, and gold miners such as Agnico Eagle, Kinross and Wheaton rose roughly 6-8%. McEwen finished up 3.49%, lagging several larger peers and sitting near its 52-week low of $9.04, with after-hours trading modestly higher. Company-specific sentiment remains fragile: third-quarter results on Nov. 9 showed a loss and a large revenue miss ($43.6M versus estimates), partly offset by the pending $55M sale of non-core Timmins assets to a Discovery Mining subsidiary (mostly in shares). Investors are now watching Wednesday's PCE inflation print and December Fed rate-hike odds (~96-97% priced), which could determine whether the metals bounce holds.
$10.40 ↘ 3.97% at Close·$10.25 ↘ 1.49% After Hours
McEwen Mining shares are under pressure as a sharp precious-metals selloff compounds company-specific worries. Gold fell to a 14-month low near $3,720 and silver slid below $45 after hawkish Fed minutes, a 19-month high in the dollar and ~95% odds of a December rate hike. Newmont and Freeport each fell more than 6%, and McEwen was named among falling miners. Its Q3 report showed gold-equivalent ounce production down 23% year over year, and law firms have announced investigations into possible disclosure violations. Valuation screens (P/E ~15x) and analyst ratings remain constructive, but the stock fell about 4% to $10.40, near its 52-week low of $10.10 on above-average volume, and slipped a further 1.5% after hours to $10.25.
$11.07 ↘ 6.97% at Close·$10.96 ↘ 1.00% After Hours
McEwen Inc. shares slid to the edge of their 52-week low as a broad precious metals selloff compounded concerns from a weak third-quarter report. Gold futures settled at a 52-week low near $3,847 and silver fell about 4.6% to roughly $46.79 on a stronger dollar, 10-year Treasury yields above 5.1% and rising bets on a December Fed hike. Hecla and Silvercorp also fell sharply, and U.S. equities sold off with the Dow down 1.4% and the S&P 500 down 1.9%. The company-specific backdrop is soft. McEwen reported a $36.7M Q3 loss and revenue of $43.6M, below estimates, citing issues at Gold Bar, Fox and San José. Analysts cut 2027 revenue estimates by about 16%, and HC Wainwright trimmed its target to $27 from $28 while keeping a Buy. Zacks and Wall Street Zen also downgraded the stock. Los Azules financing is now targeted for mid-2027, and El Gallo mill construction has begun. McEwen shares closed down about 7% at $11.07, on above-average volume and just above the 52-week low, and edged lower in after-hours trading.
$11.90 ↘ 0.42% at Close·$11.81 ↘ 0.76% After Hours
McEwen Inc. is stuck near 52-week lows as investors digest a bruising third-quarter miss (net loss of $36.7M, or $0.60 per share, with gold-equivalent ounces sold down 29%) and a wave of analyst cuts. Roth and Alliance Global lowered targets, Zacks moved to Strong Sell, and consensus fair value slipped to about $28.40. Law-firm investigations add overhang, though management calls the quarter temporary, cites a stronger October at Gold Bar and plans to keep its 2030 production goal. Shares closed slightly lower at $11.90 and slipped further after hours to $11.81. Gold's roughly 4.5% weekly drop and a Fed-hike scare also pressured miners.
$13.55 ↘ 16.51% at Close·$13.55 ↗ 0.00% After Hours
McEwen Inc. shares plunged after a third-quarter miss: a $0.60 per-share loss against expectations for a profit, and revenue of $43.6M (down 14% year over year) versus roughly $52–56M expected.
$16.22 ↗ 4.78% at Close·$15.30 ↘ 5.67% After Hours
McEwen Mining shares rallied 4.78% to close at $16.22, lifted by a broad precious-metals bid as gold futures gained about 1–2% toward $4,100–4,150 and gold miners rebounded after a lower-oil…
$15.48 ↗ 4.10% at Close·$15.58 ↗ 0.65% After Hours
McEwen Mining is drawing attention ahead of its third-quarter results due Nov. 9. Consensus is about $0.09 per share on revenue near $58.4 million, and the stock carries a Zacks Rank #2 (Buy).
$14.93 ↗ 9.46% at Close·$14.96 ↗ 0.20% After Hours
McEwen Mining rallied in a broad precious-metals surge after Democrats won both chambers of Congress, weakening the dollar and pulling Treasury yields lower.
$14.03 ↘ 6.78% at Close·$13.88 ↘ 1.04% After Hours
McEwen Mining fell in a broad precious-metals rout. Gold hit a one-year low near $3,900 and silver dropped below $50 for the first time since November 2025.
$15.65 ↗ 1.62% at Close·$15.56 ↘ 0.58% After Hours
McEwen Mining is drawing buyers into its Nov. 4 earnings report, even as gold stays pinned near $4,040/oz after the Fed held rates at 3.75%-4.00% and signaled a tightening bias.
$15.40 ↗ 5.55% at Close·$15.43 ↗ 0.17% After Hours
McEwen Mining shares closed sharply higher as precious metals miners rebounded with gold and silver, which recovered from recent lows as oil eased on Middle East de-escalation hopes ahead of…
Sharp DropNew 52-Week LowVolume 5.2× avgGap Down 8.1%
MUX fell 16.5% to close at $13.55, opening 8.1% below the prior close. Intraday range of $2.37 ($12.89 – $15.26) spanned 18.4% in a volatile session. Volume reached 4.87M shares (5.2× the 20-day average). Set a new 52-week low of $12.89.
-16.5%
Nov 4, 2026
Big RallyGap Up 7.1%
MUX gained 9.5% to close at $14.93, opening 7.1% above the prior close. Intraday range of $0.75 ($14.35 – $15.10) spanned 5.2% in a volatile session. Volume reached 1.34M shares (1.6× the 20-day average).
+9.5%
Aug 19, 2026
Big RallyGap Up 4.8%
MUX gained 10.1% to close at $20.22, opening 4.8% above the prior close. Intraday range of $1.06 ($19.18 – $20.24) spanned 5.5% in a volatile session. Volume reached 1.54M shares (1.5× the 20-day average). Closed near the session high, with buyers in control into the close.
+10.1%
Jun 5, 2026
Sharp DropGap Down 3.2%
MUX fell 13.6% to close at $18.28, opening 3.2% below the prior close. Intraday range of $2.48 ($18.17 – $20.65) spanned 13.6% in a volatile session. Volume reached 1.82M shares (1.7× the 20-day average). Closed near the day's low as sellers pressed into the close.
-13.6%
Apr 28, 2026
Sharp Drop
MUX fell 9.1% to close at $21.70. Intraday range of $1.59 ($21.68 – $23.27) spanned 7.3% in a volatile session. Closed near the day's low as sellers pressed into the close.
-9.1%
Mar 3, 2026
Sharp DropGap Down 8.3%
MUX fell 10.0% to close at $25.57, opening 8.3% below the prior close. Intraday range of $1.75 ($24.56 – $26.31) spanned 7.1% in a volatile session.
-10.0%
Feb 12, 2026
Sharp DropGap Down 2.6%
MUX fell 9.3% to close at $24.78, opening 2.6% below the prior close. Intraday range of $2.42 ($24.70 – $27.12) spanned 9.8% in a volatile session. Closed near the day's low as sellers pressed into the close.
-9.3%
Feb 6, 2026
Big RallyGap Up 4.7%
MUX gained 8.8% to close at $25.26, opening 4.7% above the prior close. Intraday range of $1.08 ($24.20 – $25.28) spanned 4.5% in a volatile session. Closed near the session high, with buyers in control into the close.
+8.8%
Feb 5, 2026
Sharp DropGap Down 5.7%
MUX fell 9.3% to close at $23.22, opening 5.7% below the prior close. Intraday range of $2.08 ($23.11 – $25.19) spanned 9.0% in a volatile session. Closed near the day's low as sellers pressed into the close.
-9.3%
Feb 3, 2026
Big RallyGap Up 9.8%
MUX gained 9.3% to close at $25.64, opening 9.8% above the prior close. Intraday range of $1.52 ($24.28 – $25.80) spanned 6.3% in a volatile session. Closed near the session high, with buyers in control into the close.
+9.3%
Jan 30, 2026
Sharp DropGap Down 9.0%
MUX fell 12.7% to close at $24.15, opening 9.0% below the prior close. Intraday range of $3.13 ($23.37 – $26.50) spanned 13.4% in a volatile session. Volume reached 2.42M shares (1.6× the 20-day average).
-12.7%
Jan 22, 2026
Big RallyNew 52-Week High
MUX gained 10.2% to close at $26.14. Intraday range of $2.91 ($23.83 – $26.74) spanned 12.2% in a volatile session. Volume reached 2.18M shares (1.7× the 20-day average). Set a new 52-week high of $26.74.
Seeking Alpha — The Bullionaire·Oct 19, 2026bullish
The author argues that McEwen’s producing gold assets and Grey Fox support the share value, while Los Azules offers additional upside that the market underappreciates. The analysis weighs Gold Bar execution and copper-project financing against a sum-of-parts valuation.
Seeking Alpha — The Bullionaire·Sep 4, 2026bullish
The report sees value in McEwen’s production-growth plans and its Los Azules stake, while arguing that the Gold Bar operating miss can be remedied. It discusses the potential catalysts and risks of project execution, dilution, and financing.
The article argues that McEwen combines a cash-generating gold portfolio with underappreciated Los Azules copper optionality. Its thesis is supported by a sum-of-the-parts valuation and potential project catalysts, while noting operational, financing, and Argentine risks.
Seeking Alpha — Capital Connoisseur·Jun 23, 2026bullish
The author sees McEwen moving toward a self-funding, multi-asset growth model, supported by San José cash generation and development opportunities at Grey Fox, Stock, El Gallo, and Los Azules. The report also cites valuation discounts to sector multiples and flags execution as a risk.
The report argues that Los Azules’ feasibility-study economics, strategic backing, and potential copper-price and technology upside are not reflected in MUX’s valuation, with the gold business providing additional value. It analyzes project financing, dilution, exploration, and execution risks.
Seeking Alpha — Black Flag Research·Dec 9, 2025bullish
The author views McEwen as a speculative way to gain exposure to Los Azules’ copper upside and gold-price leverage, while recognizing that its gold operations face high costs and operational challenges. The thesis cites Los Azules’ estimated project value and potential sensitivity to higher copper prices.
Latest earnings analysis · Q3 FY2026 · Nov 10, 2026
Management called Q3 2026 "unacceptable" and unprofitable, citing temporary issues: Gold Bar oversight lapses and delayed decisions (personnel changes made; October was its highest output in 15 months with positive cash flow), Fox Complex development costs and low-grade stockpile feed that raised ASIC (October back within guidance), and San Jose record snowfall that lowered grade and recoveries.
Gold Bar is expected to produce over 3,000 gold equivalent ounces per month in November and December and on average each month in 2027; San Jose is expected to have a strong Q4 and meet annual production guidance, with no further dividends in 2026 but a similar dividend profile expected in 2027 (about $135 million cash at quarter end).
Management reiterated the target to double gold production to 250,000-300,000 ounces by 2030, with the new Stock mine (8.5-9 year life, 30% higher mill capacity, better recoveries, no royalty) benefiting results from December, Grey Fox adding about 15 years, and the El Gallo mill in Mexico starting construction (modest Q4 spend, heavier in 1H 2027, capitalized).
Liquidity was $49 million cash and $10 million marketable securities at quarter end, plus $55 million from the October sale of non-core assets; management believes it can fund growth with minimal share dilution. Diesel added about $200 per ounce at Gold Bar in Q3 and $50 per ounce or less at other sites.
At Los Azules, FID engineering basis is due around year-end, the updated feasibility study is targeted for February 2027, and FID with full project financing is targeted for mid-2027 with first copper still targeted for 2030, though record snowfall delayed site access to early 2027 (3 to 4 month delay) and may affect the schedule; McEwen Copper has $157.8 million cash, a $240 million term loan facility, no committed construction financing, and McEwen's 46.3% stake may be diluted by new equity.
Good morning, ladies and gentlemen, and welcome to McEwen's Third Quarter 2026 Operating and Financial Results Conference Call. Present from the company today are Rob McEwen, Chairman and Chief Owner; Ian Ball, Executive Vice Chairman; Perry Ing, Chief Financial Officer; Amy Wang, Vice President Finance and Tax; Channa Kumarage, Vice President of Operations; Kevin Bromfield, Vice President Development Projects; Zahir Jina, Vice President Permitting, Government Relations, and Sustainability; Stefan Spears, Vice President Corporate Development; Michael Meding, Managing Director of McEwen Copper; Carmen Diges, General Counsel and Secretary. Other management of the company will also be available to answer questions during the call. Please note, this event is being recorded. For the question-and-answer session after the speaker's presentation, if you would like to ask a question, press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press star one again.
I will now turn the conference over to Mr. Rob McEwen, Chief Owner. Please go ahead, sir.
Rob McEwen
Thank you, operator. Good morning, ladies and gentlemen. Today, we're going to start right in trying to find some sunshine and look at how we're repairing some of our operations. I'm going to ask Ian Ball, our Vice Chairman, to jump right into that discussion.
Ian Ball
Thank you, Rob. First, obviously, it was a very difficult quarter. I would call it a very unacceptable quarter. As a mining company, as a gold company, you have to make money, and we did not do that. There's some very specific reasons which I believe we're on the route to fixing, but that does not hold the disappointment that we felt with putting out our results yesterday. Despite the difficult quarter, we still are on track to double our gold production by 2030, so nothing in that sense has changed. I do want to take some time to talk about some of the issues that we had at each of the sites, what we're doing to correct them, where we're at now, and a little bit about the transition we're seeing from our old mines to our new mines.
I do want to spend some time first on Gold Bar, because the issues that we started to see there began in Q2. They fed into Q3, and that was happening for a number of reasons. One, I would say there was a lack of oversight that we mentioned in our press release. From there, a lack of detail. There was delayed decision-making, and from there, we made a number of personnel changes, promoted various people who are on this call to higher up, and that is to correct this as soon as possible. Because it is a heap leach mine and not a mill, it does take time for those changes to take effect, and we didn't start seeing higher output until the end of September into October, and that's why we released the October production numbers.
For Gold Bar, October was the highest production month in the last 15 months for that mine. Can we do better? Absolutely. There's still a lot of improvement we could do at Gold Bar, but it is now back generating positive cash flow for the month of October, and we've seen a positive trend continue into November. At Fox, it was a situation where that mine, the Froome mine at the Fox Complex, was scheduled to come to an end. We did find some incremental ore, and it was decided earlier on in the year to do development into that ore area, but most of that development cost was incurred in Q3. Despite us mining there for another six to nine months, we could not spread it out over our AISC.
With that and the fact that the mill had excess capacity, we decided to draw down on a low-grade stockpile to feed the mill. Both of those items elevated the AISC. Both are temporary, and we showed in October that the costs for the month are now back within guidance, and we suspect that they will be there and move lower as we transition into the new Stock mine, which I'll touch upon in a second. Lastly, at San José, where we have a 49% interest, as probably many of you know, Latin America, particularly in Argentina into Chile, experienced significant snowfalls this year, record amounts, and this caused increased moisture at the mill.
Typically, the better grades at San José are associated with clay-like content, but with the moisture, this was causing issues at the plant, so they moved over to more sulfide-rich stockpiles, which were lower grade. Because the grade was lower, typically the gold and silver recoveries are also lower, so it was a bit of a compounding effect why you saw the elevated cost and the lower production at San José. What could be some good news if I'm an investor looking at this scenario and saying, "Well, why would I want to continue on with this company?" That's a very good question. What I would say is, one, these are temporary issues, and you probably have thinking to yourself, "I've heard this before from this company. You promised me you're going to make changes, and you put out another unacceptable quarter." I would share that frustration.
What I am saying today is, we do think with all the changes that we have made, we are in a position to make money and to build out the portfolio as we see it. At Stock, we are just coming into the ore zone this month. Stock should be a more profitable mine than Froome. It has much better gold recoveries. There is no royalty. There is no haul to the mill. We can mill at a 30% increased capacity over Froome because the rock is softer. So we should start to see the benefits of that take hold in December and the beginning of the new year. We are also seeing a lot of our operations going from short mine life to much longer mine lives. Froome and Froome West were a couple of years. Stock is eight and a half to nine years.
Grey Fox, which is part of the Fox Complex, is another 15 years. We are transitioning Gold Bar from being a three to four-year mine life with Trinity, Windfall, and Lookout to be a decade plus. We are now starting construction of our mill in Mexico, and that is expected to go for 10 to 20 years, depending upon the future permits we would receive there. So this quarter is a bit of a transition. We do think we can finance the growth with minimal share dilution going forward. So much as there was a lot of negative, there is still a lot of positive to be seen here, and we will be happy to take any operating questions you have at the end of the call.
I am going to hand it over to Michael Meding, our Managing Director of Los Azules, because despite this being a financial operating call, the developments at Los Azules obviously have a big impact on our overall valuation. Michael?
Michael Meding
Thank you, Ian. Good morning, everyone. Four topics on Los Azules. The work towards our final investment decision, permits, the winter, and financing. The FID work, the engineering, cost estimate, and execution plan that form the basis for the decision are on track for completion around the end. Metso has started work on the main process plant packages under limited notices to proceed. Four international engineering firms bid for the EPCM contract. We expect to finish evaluating the bids before year-end and will award once final terms are negotiated. Metallurgical test work, including 10m column leach tests, continues to favorably support the heap leach design. Two dates, so nobody confuses them. Around year-end, we complete the technical and economical basis. The decision itself, with full project financing, is targeted for mid-2027. We are also updating the feasibility study.
Three things drive it: better geotechnical results than we expected, a higher long-term copper price in line with analyst consensus, and current costs from our recent bids. It's not a redesign. The project stays broadly the same. The base case does not use Nuton, as was the case in the feasibility. It is conventional bio-heap leaching, as used at many mines in Chile and Peru, some at higher altitude than ours, Quebrada Blanca and El Abra among them. We see potential for more copper over a longer mine life. Lenders and investors in our financing process will work from this updated technical report. We target publishing it in February 2027. Permits. In September, we received the environmental approval to connect Los Azules to Argentina's national grid within three weeks of the public hearing in Calingasta. Calingasta is the community where we're operating in.
It covers the high-altitude section of the line, which is common to the supply alternatives we are considering, so we can build it whichever we choose. Basic engineering for the line and substations is complete and advanced enough to tender. We also obtained land use approvals for the 3,000-bed construction camp and the Candadito camp, and environmental approval to explore the neighboring Marisa I property that we acquired some months back. One permit is outstanding, the water concession. Our application is complete, the authority has no open information requests, and we await the provincial water council's decision, and we are cautiously optimistic. The winter. The Andes had their heaviest snowfall in more than two decades, and it has delayed the reopening of our access road. Road crews expect to reach site in early 2027. Snowmelt and spring weather could push that later.
Site works will start later than planned, and that may affect the construction schedule. However, it does not affect the engineering cost work for FID, which is done off-site and with information we already have. We are assessing options to recover the lost time, including more camp capacity so more people can work at site sooner. They cost money, and we are weighing that against the time recovered. Our target to first copper remains 2030. Holding it depends on site access and the recovery measures we choose, and on completing the FID work, securing project financing, and customary approvals. I will add additional precisions once we have out the technical report. Safety through all of this, Los Azules closed the third quarter without a reportable incident or a lost time injury. Financing.
In August, commitments under McEwen's copper term loan facility increased to $240 million, funding continued engineering and early works. At quarter end, McEwen Copper had $157.8 million in cash and cash equivalents and $138.9 million in working capital. The term loan is bridge funding. It does not build the mine, obviously. For construction, we are working on three sources. The first is senior project debt. Société Générale is sole financial advisor for the project's debt financing. In late October, it sent an indicative senior debt term sheet to a group of export credit agencies and development finance institutions. Their feedback will shape the final structure. The second is equity at the McEwen Copper level from strategic investors. The third is a potential initial public offering of McEwen Copper. Preparations continue in parallel. None of the construction financing is committed today.
That is normal before the FID basis is complete, and you should hear it from me. We continue to target FID and full project financing in mid-2027. On McEwen's 46.3%, new equity will be raised at the McEwen Copper level. To the extent McEwen does not subscribe, its percentage goes down. By how much depends on the amount of debt and the equity price, and neither is set yet. We aim to raise that equity at higher prices than past rounds so that future capital increases are accretive to McEwen, as earlier rounds were. Community. In a recent door-to-door survey of 2,529 residents in 10 communities near the project, 97% said they accept Los Azules and 90% said they trust it. From 2023 to mid-2026, the project sourced $27.7 million goods and services from suppliers in Calingasta and Barreal. That's an 11,000-people community, the nearest towns.
In September, Los Azules was named Outstanding Mining Company in Corporate Social Responsibility at Argentina Mining Norte. So what to watch? The FID basis around year-end, the EPCM award, the updated feasibility study targeted for February 2027, site access in early 2027, and the updated schedule. The lender's feedback and FID with full project financing in mid-2027. Thank you so much, and back to you, Rob.
Rob McEwen
Thank you, Mike. Despite our reduced cash flow during the quarter, we do have an adequate treasury, as Ian said, to cover our organic growth, and we're looking to double our production by 2030 to 250,000-300,000 ounces. In terms of our liquidity, at the end of the quarter, we had $49 million in cash and a further $10 million in marketable securities. Then early in October, we closed on a sale of non-core properties and raised. That added a further $55 million. We have the asset base. Our gold assets in all categories, resources, 5.8 million ounces. That is a solid foundation to allow us to build longer life mines and, as Ian said, at a lower cost.
We also have a world-class copper project that Michael just spoke about, which is equal to, if you put it on a gold equivalent basis, is equivalent to a 56 million ounce gold deposit, with very attractive costs. We do think there's some room to improve on that asset, and the technical work is being done, and we'll see the results of that early in the new year. For those reasons, I'm optimistic about our growth. I've invested over $290 million between McEwen Inc. and McEwen Copper, my own money, because I believe in the assets that we have. Mining, I've found over the years, comes with its challenges every once in a while, and we're going to overcome those and move forward. At this point, operator, I'd like to welcome questions from the audience.
Operator
We will now begin the question-and-answer session. If you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again. We ask that you pick up your handset when asking a question to allow for optimum sound quality. If you are muted locally, please remember to unmute your device. Please stand by while we compile the Q&A roster. Your first question comes from Jake Sekelsky with Alliance Global Partners. Your line is now open. Please go ahead.
Rob McEwen
Hello, Jake.
Jake Sekelsky
Hi, Rob and team. Thanks for taking questions. Hey, Rob. Just looking at the Los Azules timeline, I am curious if the adverse weather has affected anything here, and have any delays on that front been built into the current timeline for the FID? Any color there would be helpful.
Rob McEwen
Sure. I will ask Mike to answer your question, Jake.
Michael Meding
Hey, Jake. How are you doing? Jake, we had, I would say, three to four months delay on getting normally to site. We want to start build out the camp early, and that obviously has impact. That means that now we need to be more aggressive in terms of scaling up camp capacity. As you have seen and heard, we are now targeting a 3,000-bed camp instead of a 2,500-bed camp as before. That will be part of the mitigation. We are going to have more people working over the construction timelines than before in order to claw that back. Now, how the rest of the summer is going, and what does it mean in terms of snow melt and potential access? I think that we will be in a much better position once we have our feasibility out.
That's a one-in-25-year event, and you had seen lots of impacts on the Chilean side and also in other mine operations in Argentina. We are cautiously optimistic that we can claw back the time we have lost due to inclement weather conditions.
Jake Sekelsky
Okay. That's helpful. Just looking at the quarter at San José, we saw much higher dividends in 2026 than originally expected. Should we expect the JV to sort of revert back to retaining cash flow as the project gets back to a steady state here over the next quarter? Or how should we be thinking about dividends heading into 2027 here?
Perry Ing
Sure. This is Perry. I can take that, Jake. I would say, as far as San José, we're not expecting any further dividends for the balance of 2026. I could say their closure obligations, I think, are substantially or fully met at this point. I think, barring need for significant capital development because of a discovery, I would say we expect further additional dividends in 2027. The quantum will be relative to silver prices. Obviously, we saw very high silver prices late last year going into 2026 first half. Overall, we think they will recover the production, a large part of the production in Q4 this year. Their cash balance was very healthy at the end of the third quarter. I think about $135 million in cash approximately. I would say look for a similar profile next year compared to this year.
Jake Sekelsky
Got it. Okay. That's all for me. Thank you again.
Operator
Your next question comes from the line of Joseph Reagor with Roth Capital Partners. Your line is now open. Please go ahead.
Rob McEwen
Hi, Joe.
Joseph Reagor
Hey, Rob and team. Thanks for taking the questions. One kind of like accounting question from me. You guys expensed some stuff from El Gallo and I think the Fox Complex as the advanced projects category. Can you give us any guidance on what that might look like in Q4 and for next year? Obviously, it's been a bit higher than in prior years.
Perry Ing
Hi, Joe. It's Perry. In terms of El Gallo, we just started earthworks for construction of the mill. I think you'll see modest spend in Q4, but we won't get into the heavy spend until the EPCM contracts are finalized. You'll see, I think, more consistent spend on that in the first half of 2027.
Joseph Reagor
Okay. Will all that be expensed in advanced projects?
Perry Ing
No. You'll see that capitalized as we work through that project.
Joseph Reagor
Okay. Okay. Given the production of over 3,000 gold equivalent ounce at Gold Bar in October, are you expecting that kind of like 3,000 per month to continue for the rest of the quarter? Or was there some buildup on the pad that kind of came through well in October, but maybe it's more moderate the rest of the quarter?
Ian Ball
Yeah. I can address that, Joe. It's Ian Ball speaking. There's nothing special about October. The grade was average. We just basically were more efficient with our mining. We moved more ore tons to the leach pad, and we do expect to see a similar amount in November and December, as well as early budgeting is showing that we would expect to see that every month, or on average, every month in 2027 as well.
Joseph Reagor
Okay. All right. Thanks. I'll turn it over.
Operator
Reminder, if you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again. Your next question comes from the line of Heiko Ihle with H.C. Wainwright. Your line is now open. Please go ahead.
Rob McEwen
Hello, Heiko.
Heiko Ihle
Hey there. Thank you guys for taking my question. How are you? At San José, you hinted at this on the call, and you also discussed it in the release. You were talking about the snowfall, the weather, and just the excess moisture, and essentially, it sort of screwed up the plant a little bit. I just want to see, what have we seen so far in Q4? Because I mean, you're only discussing Q3, all on a wet front. Is there maybe any changes you can make to the plant to avoid those blockages in the future? Just sort of help us out on what we should envision on a cost production guidance type of thing for Q4, maybe even beyond, if you'd be so kind.
Ian Ball
Yeah. Ian speaking again. Just on the plant, we have not had those conversations with Hochschild and any modifications. I would say this is the first time they've ever seen this type of moisture buildup over the 20 years that the plant's been operating. Will they need to recalibrate the plant for a one-off? I don't have the answer for you at this point. My gut tells me probably not, that they won't do it. That said, going into Q4, the fourth quarter's typically very strong for San José. Speaking to the team at site there, they fully expect that they can have a very strong fourth quarter and meet their production guidance for the year. I think they did a very good job operating under a very difficult situation, because there was more than just the moisture as well as the plants.
Even getting to site, having these record high snowfall and getting people in and out, because it is a fly-in, fly-out camp. You see that Michael's been speaking about it regarding in the high Andes, it was sort of all over the country. That said, we are expecting a very strong Q4 in line with what they've traditionally produced.
Heiko Ihle
Yeah. Essentially, in our models, we should, I don't want to say ignore the whole thing, but very much put it on the back burner going forward. That's fair to say?
Ian Ball
No, yeah, I expect that everything's going to pick up in the fourth quarter. They're going to move back to the clay material, so that'll automatically increase the grade. The recovery should go back to normal. Like I said, obviously with lower grade, typically, there's a fixed tail that comes with those recoveries, and we saw that in the quarter. That fixed tail will continue with a higher grade. So the recovery should just jump back up to where they were in Q2 and Q1. As you saw, prior to Q3, San José was actually running at record rates, highest throughput, highest production due to the mill expansion that we've seen in quite some time. I think this was really unfortunately just a one-off due to the weather.
Heiko Ihle
Yeah. Okay. Completely different question. I'm in Zurich right now at a conference, and two different meetings, the topic of diesel prices came up in regards to costs for drilling. Can you maybe give it a dollar impact on, I guess, how much you spend on diesel and what the delta is now versus, call it Q1, and maybe how we could model it out going forward as well?
Channa Kumarage
Hey, Heiko, it's Channa, VP Operations. I don't have a full dollar value for that, but at Gold Bar, we did see an impact of diesel cost, the increase of diesel cost in Q3, and that accounted for about $200 per ounce increase that impacted cash cost there. So we do see that impact at all our sites.
Heiko Ihle
Okay. But you want to maybe give us a rounded number or at least a quantifiable measurement?
Perry Ing
Yeah. I would say for our other operations, the impact would be $50 per ounce or less. Gold Bar is our only open pit operation subject to significant diesel purchases. I would not quantify the impact on our other sites as material.
Heiko Ihle
Okay. Perfect. That is helpful. I will get back to you. Thank you, guys.
Perry Ing
Thanks, Heiko.
Operator
There are no further questions at this time. Mr. Rob McEwen, I turn the call back over to you.
Rob McEwen
Thank you very much, operator. We are getting on top of the issues that caused the problem in the third quarter, and we look forward to sharing those with you in the next quarter. Thank you.
Operator
This concludes today's call. Thank you for attending. You may now disconnect.