USMarketsToday.com
POW

Powell Industries, Inc.

POWL · NASDAQ ·
$158.57+$3.53 ↗ 2.28%
At close: Nov 27, 1:00:00 PM EST
$158.95+$0.38 ↗ 0.24%
After-hours: Nov 27, 4:49:25 PM EST
Volume
Forward P/E20.63
Market Cap$5.78B
Open$161.18
Trailing P/E26.25
Day Range$154.95–$161.18
Dividend Yield0.23%
52W Range$102.33–$328.00
EPS$6.03
Volume310.17K
Avg Volume713.63K
50-Day Avg$167.87
200-Day Avg$212.66
Why is POWL moving?

POWL rose along with a broad market rally that capped Wall Street's best week in over a year, as investors rallied after the Federal Reserve and Bank of Canada cut rates and tech volatility eased.

What analysts say

Updated 2h ago

Wall Street has a Buy consensus on Powell Industries (POWL), though coverage is thin: of 4 ratings, 50% are bullish, 50% are neutral, and 0% are bearish. The average price target is $173.67 and the median is $164.00. Targets range from a low of $116.67 (Roth Capital, a dated Buy-rated target from Nov 2025) to a high of $250 (JP Morgan, Overweight). That wide spread shows how much the targets differ in age and in conviction about the recovery. Recent actions have leaned toward lower targets. Cantor Fitzgerald (Neutral) cut its target to $178 from $235 on Nov 20, citing timing concerns. That followed an earlier cut from $320 to $235 in August. JP Morgan kept its Overweight rating on Oct 13 but lowered its target to $250 from $300. That target is down from a $360 peak in May. GLJ Research has a Hold with a $150 target. Even with the trimmed targets, no firm has turned bearish. Recent commentary points to strong order momentum and a continuing recovery story, so the cuts look like caution about timing and valuation, not a loss of confidence in the fundamentals.

Bull vs Bear

Every version →
▲ Bull caseConsensus targets imply large upside. ChartMill's 13-analyst mean of $265.24 sits about 67% above the roughly $158 share price, and Zacks cites a $259 mean target. Simply Wall St's DCF puts fair value near $255, which suggests the shares trade about 39% below intrinsic cash flow value.[3][2][1]
▼ Bear caseValuation looks less compelling on other measures. MarketBeat's consensus target is only $192.67, with a low of $150. Its PEG ratio of 1.53 flags possible overvaluation, and the P/B ratio is 6.71. Simply Wall St shows a P/E of 25.6x versus a 19.0x peer average, and says analyst targets lack statistical agreement.[7][1]

Notable price movement

All 15 moves →
Nov 276:06 PM ET
$158.57 ↗ 2.28% at Close·$158.95 ↗ 0.24% After Hours
Powell Industries shares rose in a shortened Black Friday session as a broad rebound in beaten-down AI-linked and industrial names lifted the market, with the S&P 500 up 1.6% and the industrials sector (XLI) among the leaders. Investors are weighing a record $2.7 billion backlog (up about 93% year over year), driven by LNG and data center orders, and a fiscal Q4 beat (revenue $396.7M, up 33%; EPS $2.23 vs. $1.57 expected). Offsetting this are concerns about slower backlog conversion, softer international sales, and AI-spending and tariff worries that pressured electrical-equipment peers earlier in the week. Powell closed up 2.28% at $158.57 on below-average volume and edged slightly higher after hours. Analysts remain constructive: Zacks Rank #1, and a Seeking Alpha bull case at roughly 19.7x forward earnings.
$148.18 ↘ 6.66% at Close·$151.00 ↗ 1.90% After Hours
Powell Industries shares tumbled 6.66% to close at $148.18 as a violent, AI-driven market rout hit data-center-linked industrials. The S&P 500 fell 3.7% and entered correction territory, and peer Vertiv dropped about 10%. Cantor Fitzgerald also cut its price target to $178 from $235 and kept a Neutral rating, citing near-term startup inefficiencies at new capacity. It called these a timing issue, not a change to the margin framework. Fundamentals remain strong: record $2.7B backlog, fiscal Q4 EPS of $2.23 versus about $1.57 expected, and $861M cash with no debt. Valuation is a debate, with a P/E near 26x. Shares were up about 1.9% after hours, following a modest rebound in the sector ETF.
$154.95 ↗ 2.71% at Close·$150.06 ↘ 3.16% After Hours
Powell Industries shares rebounded after a post-earnings pullback, as investors weighed record fiscal fourth-quarter results (EPS $2.23 vs. roughly $1.52-1.59 expected, revenue up 33% to $397 million) and a record $2.7 billion backlog driven by LNG, utility and data center demand. Management said about $1.3 billion of backlog should convert in fiscal 2027, that the 31.3% gross margin is sustainable, and that it is adding capacity, including a 275,000 sq ft leased facility. Roth reiterated a Buy with a $275 target, and a Seeking Alpha author upgraded the stock to Buy. Offsetting this, a slower backlog conversion timeline, data center cancellation risk, heavy insider selling and a Zacks Rank #4 (Sell) kept some caution. Shares closed up about 2.7% at $154.95 on volume well above average, outperforming a mixed tape in which the Dow fell 1.1% amid hawkish Fed minutes and AI-trade jitters. The stock slipped about 3% in after-hours trading.
$151.20 ↗ 5.94% at Close·$153.50 ↗ 1.52% After Hours
Powell Industries reported fiscal Q4 results after the close that topped expectations, as investors weighed whether its record backlog is converting into revenue. EPS of $2.23 compared with roughly $1.56 expected, and revenue rose 33% to $396.7M versus about $335M expected. Gross margin expanded to 34.9%, backlog reached a record $2.7B (+96%), and management said the fiscal 2026 margin profile should be sustainable in fiscal 2027, though it gave no numeric guidance. Shares jumped about 6% in the regular session to $151.20 ahead of the report, on heavy volume of about 2.5M versus a 622K average. This came as the Dow fell 1.4% and the S&P 500 fell 1.9% in an AI-infrastructure selloff that also hit peers like Eaton, Vertiv and nVent. Shares were up another 1.5% after hours. Analyst consensus is Moderate Buy with an average target near $188, while Roth, JPMorgan and Cantor targets sit at $235-$275.
$145.90 ↗ 5.56% at Close·$144.17 ↘ 1.19% After Hours
Powell Industries rebounded as renewed AI-infrastructure optimism, sparked by CoreWeave's raised outlook and strong data-center power-equipment commentary from Siemens Energy, lifted electrical-equipment names ahead of its fiscal Q4 report due November 16 after the close. Shares surged 5.56% to $145.90 after sliding 2.4% the prior session and trading well below the $328 52-week high, outpacing the broader industrials rally. Investors are focused on the record $2.4B backlog (including a $400M+ data center award) against back-to-back EPS misses, with options implying roughly a 16% earnings move; consensus is a 'Moderate Buy' with an average target of $187.92. After hours, the stock slipped about 1.2% to $144.17.
$141.65 ↗ 6.41% at Close·$139.66 ↘ 1.40% After Hours
Powell Industries rebounded as a broad, industrial-led market rally revived the AI data center supply-chain trade after last week's sharp selloff. Industrials were among the day's leaders as oil prices fell and chip stocks bounced, and electrical equipment peers such as Vertiv, Quanta and Comfort Systems each gained roughly 9–10%. Shares of Powell surged 6.41% to close at $141.65 on above-average volume, outpacing the XLI sector ETF, but remain well below their 50-day average of about $175 after a roughly 30% drop over the past month. Investors are weighing record orders of $934 million, a backlog above $2 billion and a reaffirmed $0.09 dividend against margin-normalization and insider-selling concerns. Attention now turns to fiscal Q4 results on Nov. 16, where options imply a ~16% move and consensus calls for EPS of $1.52 on about $328 million in revenue. Shares slipped about 1.4% after hours.
$133.12 ↗ 6.44% at Close·$133.50 ↗ 0.29% After Hours
Powell Industries rebounded sharply as AI-infrastructure and data-center-linked names bounced after Thursday's historic selloff, which followed Democratic midterm wins and raised fears of slower data…
Why POWL moved on Nov 6 →
$125.06 ↘ 12.61% at Close·$128.04 ↗ 2.38% After Hours
Powell Industries shares tumbled as a violent AI and data-center unwind swept Wall Street, with investors fearing a slower buildout after Democrats won Congress and key governorships in Texas and…
Why POWL moved on Nov 5 →
$143.10 ↘ 12.39% at Close·$141.00 ↘ 1.47% After Hours
Powell Industries shares tumbled as a Democratic sweep of Congress triggered a selloff in AI-infrastructure and data-center-linked names, even as the broader market rallied.
Why POWL moved on Nov 4 →
$163.34 ↗ 6.06% at Close·$162.94 ↘ 0.24% After Hours
Powell Industries shares jumped as electrical equipment peers rallied after Eaton's strong third-quarter report, which showed record orders, a 46% rise in electrical backlog and raised guidance.
Why POWL moved on Nov 3 →
$154.01 ↘ 1.44% at Close·$153.78 ↘ 0.15% After Hours
Powell Industries is drawing a cautious investor narrative ahead of its fiscal Q4 report (est. Nov. 17).
Why POWL moved on Nov 2 →
$156.26 ↘ 7.25% at Close·$157.10 ↗ 0.54% After Hours
Powell Industries shares tumbled as a broad AI-trade sell-off, triggered by Intel's and Amazon's results and Alphabet's cash-burn worries, hit data-center-linked names.
Why POWL moved on Oct 30 →
$168.48 ↗ 0.28% at Close·$162.00 ↘ 3.85% After Hours
Powell Industries was little changed, closing slightly higher after a volatile session, as electrical-equipment peers drew attention from GE Vernova's $9 billion Trench Group acquisition and strong…
Why POWL moved on Oct 29 →
$168.01 ↗ 4.12% at Close·$163.50 ↘ 2.68% After Hours
Powell Industries shares rose as peer results and deal news revived interest in grid and data-center power names.
Why POWL moved on Oct 28 →
$161.36 ↗ 2.73% at Close·$162.50 ↗ 0.71% After Hours
Powell Industries shares closed higher, extending a rebound after a roughly 22% slide over 90 days, as electrical-equipment peers reported data-center strength: Hubbell raised its full-year outlook…
Why POWL moved on Oct 27 →
Largest moves in the past year from daily prices
Nov 23, 2026
Big RallyGap Up 11.7%
POWL gained 9.3% to close at $161.98, opening 11.7% above the prior close. Intraday range of $6.37 ($159.36 – $165.73) spanned 4.0% in a volatile session.
+9.3%
Nov 5, 2026
Sharp DropGap Down 5.4%
POWL fell 12.6% to close at $125.06, opening 5.4% below the prior close. Intraday range of $14.88 ($121.13 – $136.01) spanned 12.3% in a volatile session. Volume reached 1.75M shares (2.4× the 20-day average).
-12.6%
Nov 4, 2026
Sharp DropGap Down 4.5%
POWL fell 12.4% to close at $143.10, opening 4.5% below the prior close. Intraday range of $18.51 ($141.04 – $159.55) spanned 13.1% in a volatile session. Closed near the day's low as sellers pressed into the close.
-12.4%
Oct 22, 2026
Sharp DropGap Down 4.3%
POWL fell 11.5% to close at $150.71, opening 4.3% below the prior close. Intraday range of $14.14 ($149.25 – $163.39) spanned 9.5% in a volatile session. Volume reached 1.26M shares (2.0× the 20-day average). Closed near the day's low as sellers pressed into the close.
-11.5%
Aug 4, 2026
Gap Down 12.7%
POWL fell 3.8% to close at $211.38, opening 12.7% below the prior close. Intraday range of $27.39 ($188.10 – $215.49) spanned 14.6% in a volatile session. Volume reached 1.57M shares (1.9× the 20-day average). Recovered from the lows into the upper part of the range as dip buyers stepped in.
-3.8%
Jul 30, 2026
Big RallyGap Up 7.5%
POWL gained 12.3% to close at $209.30, opening 7.5% above the prior close. Intraday range of $15.56 ($195.03 – $210.59) spanned 8.0% in a volatile session. Closed near the session high, with buyers in control into the close.
+12.3%
Jun 26, 2026
Sharp DropVolume 5.5× avgGap Down 4.2%
POWL fell 9.5% to close at $279.77, opening 4.2% below the prior close. Intraday range of $23.64 ($275.87 – $299.51) spanned 8.6% in a volatile session. Volume reached 3.52M shares (5.5× the 20-day average). Closed near the day's low as sellers pressed into the close.
-9.5%
Jun 11, 2026
Big RallyGap Up 3.9%
POWL gained 10.7% to close at $290.50, opening 3.9% above the prior close. Intraday range of $25.15 ($268.12 – $293.27) spanned 9.4% in a volatile session. Closed near the session high, with buyers in control into the close.
+10.7%
Apr 30, 2026
Big RallyNew 52-Week High
POWL gained 9.4% to close at $277.27. Intraday range of $21.29 ($258.27 – $279.56) spanned 8.2% in a volatile session. Set a new 52-week high of $279.56. Closed near the session high, with buyers in control into the close.
+9.4%
Mar 26, 2026
Sharp Drop
POWL fell 10.3% to close at $174.80. Intraday range of $17.88 ($173.71 – $191.59) spanned 10.3% in a volatile session. Closed near the day's low as sellers pressed into the close.
-10.3%
Feb 4, 2026
Big RallyNew 52-Week HighVolume 2.6× avgGap Up 2.8%
POWL gained 16.3% to close at $175.77, opening 2.8% above the prior close. Intraday range of $37.26 ($152.67 – $189.93) spanned 24.4% in a volatile session. Volume reached 2.28M shares (2.6× the 20-day average). Set a new 52-week high of $189.93.
+16.3%
Jan 2, 2026
Big Rally
POWL gained 10.6% to close at $117.51. Intraday range of $10.81 ($107.33 – $118.14) spanned 10.1% in a volatile session. Volume reached 755.18K shares (1.5× the 20-day average). Closed near the session high, with buyers in control into the close.
+10.6%

Latest news

Price forecast 12-month price targets from 4 analysts

Price, past year Buy target Hold target Sell target Consensus high · average · low
Average price target
$173.67
▲ 9.5% upside
High$250.00 +57.7%
Median$164.00 +3.4%
Low$116.67 -26.4%
Current price$158.57

Change is measured from the current price. Targets are analysts’ 12-month views, not facts.

Analyst estimates · fiscal years · E = consensus estimate

MetricFY2025FY2026FY2027EFY2028E
Revenue$1.10B$1.26B$1.64B$1.94B
Revenue growth+9.1%+13.8%+30.6%+18.5%
EPS (diluted)$4.95$6.04$7.71$9.45
EPS growth+20.7%+22.0%+27.7%+22.5%
Net income$180.75M$220.99M$276.26M$338.85M

Analyst rating changes 4 analysts Forecast & rating history →

Recent rating actions

DateFirmAnalystActionRatingPrice Target
Nov 20 Cantor Fitzgerald Manish A. Somaiya Maintains Neutral $235 → $178
Oct 13 JP Morgan Tomohiko Sano Maintains Overweight $300 → $250
Oct 1 Cantor Fitzgerald Manish A. Somaiya Reiterates Neutral $235
Aug 14 Cantor Fitzgerald Manish A. Somaiya Maintains Neutral $320 → $235
May 11 Cantor Fitzgerald Manish Somaiya Maintains Neutral $160 → $320
May 6 JP Morgan Tomohiko Sano Maintains Overweight $310 → $360
Apr 27 JP Morgan Tomohiko Sano Initiates Coverage On Overweight $310
Mar 5 GLJ Research Gordon L. Johnson Initiates Coverage On Hold $150
Feb 5 Cantor Fitzgerald Manish Somaiya Maintains Neutral $142 → $160
Jan 23 Cantor Fitzgerald Manish Somaiya Initiates Coverage On Neutral $142
Nov 19 Roth Capital Chip Moore Maintains Buy $117

Research

Independent reports

$POWL: Two Years of Orders, Priced Like One
Disruptor Investing·Oct 28, 2026 bullish

The report argues Powell’s growth is constrained more by factory capacity than demand, and that planned capacity additions during fiscal 2027 could let it convert its record backlog into revenue. It supports the thesis with order, backlog, margin, and valuation analysis, while identifying delayed facilities, order deferrals, and margin decline as key risks.

Earnings Earnings history → · Earnings calls →

Next report · Q1 FY2027

DateFeb 3, 2027
EPS Est.$1.39
Revenue Est.$324.33M
Avg 1-Day Move±7.4%

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
Q4 FY2026 Nov 17, 2026 $1.52 $2.23 +46.7% $335.08M $396.71M +18.4% -0.2%
Q3 FY2026 Aug 4, 2026 $1.49 $1.42 -4.7% $316.70M $311.74M -1.6% -3.8%
Q2 FY2026 May 5, 2026 $1.34 $1.25 -6.7% $298.12M $296.62M -0.5% +9.2%
Q1 FY2026 Feb 4, 2026 $0.95 $0.38 -60.0% $256.46M $251.18M -2.1% +16.3%
Q4 FY2025 Nov 19, 2025 $1.25 $1.41 +12.8% $291.50M $297.98M +2.2% -11.3%
Q3 FY2025 Aug 6, 2025 $1.24 $1.32 +6.5% $298.34M $286.27M -4.0% -3.6%
Q2 FY2025 May 7, 2025 $1.11 $1.27 +14.4% $282.68M $278.63M -1.4% -8.0%
Q1 FY2025 Feb 7, 2025 $0.94 $0.95 +1.1% $232.62M $241.43M +3.8% -6.5%

Latest earnings analysis · Q4 FY2026 · Nov 17, 2026

Fiscal 2026 delivered record revenue of $1.3 billion (up 14%), record EPS of $6.04, record operating cash flow of $434 million, and $861 million in cash with zero debt. Q4 revenue rose 33% to $397 million, gross margin was 34.9%, and EPS was $2.23.
Orders were $2.6 billion for the year (book-to-bill of 2.0x) and $710 million in Q4 (book-to-bill of 1.8x), including a roughly $250 million LNG mega order and an $85 million data center order. Backlog hit a record $2.7 billion, with about $1.3 billion (roughly 50%) scheduled to convert in fiscal 2027 and visibility well into fiscal 2028.
Backlog mix is 38% oil and gas/petrochemical, 23% electric utility, and 35% commercial and other industrial (largely data centers). Electric utility and commercial/other industrial made up 50% of fiscal 2026 revenue versus 41% in fiscal 2025. Book-and-ship volume averages $75 to $80 million per quarter.
Management expects momentum to continue into fiscal 2027 and sees another strong year. Fiscal 2026 gross margin was 31.3% with about 150 bps of closeout benefit, and backlog is exiting at roughly 30%. Closeouts and configure-to-order throughput could be a modest tailwind, tempered by a possible productivity air pocket as new facilities come online. Fiscal Q1 is typically seasonally softer sequentially.
Footprint is expanding from about 2.6 million square feet to about 3.2 million next year, including a new 275,000 square foot leased facility expected online in fiscal Q3 2027 and an 80,000 square foot port addition. The 335,000 square foot port expansion supports over $100 million of incremental annual revenue. Fiscal 2027 CapEx is expected at $15 to $20 million, and a greenfield factory is still under evaluation. Risks include skilled labor competition, higher data center order refinement risk, and a slow petrochemical recovery expected mid to late fiscal 2027.

Earnings call · Q4 FY2026 · Nov 17, 2026 · 11:00 AM EST

Full transcript →
≈ 55:35 · 93 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Operator

Good day, and welcome to the Powell Industries Fiscal 2026 Fourth Quarter and Full Year Earnings Conference Call. All participants will be in a listen-only mode. Should you need assistance, please signal a conference specialist by pressing the star key followed by zero. After today's presentation, there will be an opportunity to ask questions. To ask a question, you may press star then one on your touchtone phone. To withdraw your question, please press star then two. Please note that this event is being recorded.

I would now like to turn the conference over to Mr. Robert Winters of Alpha IR. Please go ahead, sir.

Robert Winters

Thank you, operator, and good morning, everyone. Thank you for joining us for Powell Industries conference call today to review fiscal year 2026 fourth quarter and full year results. With me on the call are Brett Cope, Powell's Chairman and CEO, and Mike Metcalf, Powell's CFO. There will be a replay of today's call, and it will be available via webcast by going to the company's website, powellind.com. A telephonic replay will be available until November 24, 2026. The information on how to access the replay was provided in yesterday's earnings release. Please note that information reported on this call speaks only as of today, November 17, 2026. Therefore, you are advised that any time-sensitive information may no longer be accurate at the time of replay listening or transcript reading.

This conference call includes certain statements, including statements related to the company's expectations of its future operating results that may be considered forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Investors are cautioned that such forward-looking statements involve risks and uncertainties, and that actual results may differ materially from those projected in these forward-looking statements. These risks and uncertainties include, but are not limited to, competition and competitive pressures, sensitivity to general economic and industry conditions, international, political, and economic risks, availability and price of raw materials, and execution of business strategies. For more information, please refer to the company's filings with the Securities and Exchange Commission.

With that, I'll now turn the call over to Brett.

Brett Cope

Thank you, Bobby, and good morning, everyone. Thank you for joining us today to review Powell's fiscal 2026 fourth quarter and full year results. I will make a few comments and then turn the call over to Mike for more financial commentary before we take your questions. Before I turn to our results for the quarter and full year, I want to take a moment to recognize the passing of Tom Powell, our former Chairman and CEO, who passed away on September 23 at the age of 86. Tom first began working at Powell at just 14 years old, spending his summers on the manufacturing floor of the company his father founded. Over the decades that followed, he helped shape Powell into the company it is today, building a culture of hard work, product excellence, and a commitment to our customers that remains central to our success.

When Tom announced his retirement from the board, he expressed his belief that Powell's best years were still ahead. He was right, and I believe the progress we've made is a testament to the foundation he helped build. On behalf of the entire Powell team, I extend our deepest condolences to Tom's family and all those who knew him. With that, I'd like to turn to our financial results and the progress we've made over the past year. Our fourth quarter capped what was truly a transformational year for Powell. We closed fiscal 2026 with record revenue, earnings, and cash flow, as well as record orders and a total backlog of $2.7 billion, the highest in our 79-year history. I want to start by thanking the entire Powell team.

The level of collaboration we have seen across our divisions is outstanding, and to our employees across all the geographies where we work and live, a job well done. This year has been outstanding, and our team members are the reason that we are able to say yes to the opportunities that our customers have and continue to bring an award to Powell. Turning to our results for the quarter, revenue grew 33% to $397 million compared to the fourth quarter of the prior year. Growth was once again led by strength in the oil and gas and commercial and other industrial end markets, complemented by solid contributions from the electric utility end market. Our continued focus on productivity and project execution delivered a gross margin of 34.9%, resulting in earnings of $2.23 per diluted share.

We booked $710 million of new orders in the quarter, which was up 162% compared to the prior year and was the second-highest order total in Powell's history, surpassed only by the record $934 million that we booked in the prior quarter. Included in this quarter's total were two mega orders, one LNG order at roughly $250 million and an order in the data center space valued at approximately $85 million. For the full year, revenue grew 14% to a record $1.3 billion, and gross margins ended at 31.3%, resulting in earnings of $6.04 per diluted share. We booked $2.6 billion of new orders, more than double what we booked in fiscal 2025, for a full year book-to-bill of 2x.

As a result, we ended the year with a backlog of $2.7 billion, up over $300 million sequentially, and $1.3 billion higher than a year ago. Our visibility now extends well into fiscal 2028, and in some cases beyond, and the composition of our backlog remains healthy and well-balanced. Equally as important is the mix of project by size. Complementing our mega projects that provide an anchor from a scheduling and execution perspective, we continue to see a steady flow of core projects below $10 million and larger projects in the $10 million-$50 million range. That blend of project scope and size lets us efficiently schedule around the natural stop and hold points that often arise in larger projects and enables us to optimize the variable costs of production.

Reflecting on fiscal 2026 results, I am particularly pleased with the continued progress we are making in our efforts to diversify Powell across the markets we serve. Traditionally, Powell has focused on delivering complex engineered-to-order electrical distribution solutions for customers spanning our important core industrial markets. Today, we are not only effectively serving these traditional Powell markets, but we are also successfully leveraging these same engineering and manufacturing competencies to continue to grow our presence across the electric utility and the commercial and other industrial end markets globally. The current commercial demand spanning these end markets today demands process and structure that is embedded across our footprint, and it is a testament to our teams globally and their ability to scale and leverage these processes, engineering talent, and manufacturing capabilities across the business.

We are confident that this Powell attribute is a fundamental reason driving our success and an important competitive advantage for our business. Specific to our core industrial end markets, commercial activity remains strong. We continue to expand our position across the natural gas value chain, particularly in LNG, as demonstrated by roughly $350 million of new LNG orders in the fiscal fourth quarter. We were also encouraged by the fertilizer project awarded earlier in the year, which we believe is an early sign of a potential recovery in the petrochemical market following a period of softer market demand. Overall, the progress we have made against our decade-long strategy to diversify the business is increasingly evident in our results. The electric utility and commercial and other industrial markets represented 50% of revenue in fiscal 2026, compared to 41% in fiscal 2025.

For perspective, these markets accounted for less than 30% of revenue on a significantly lower revenue base just five years ago. We believe that this diversification is contributing to a more balanced business, reducing cyclicality, and providing greater visibility to plan and invest beyond the current market cycles. Over the past year, we have taken a series of deliberate steps to add capacity, and together, they have expanded our manufacturing, office, and warehouse footprint by more than 20% versus the end of fiscal 2025. In Ohio, we have added an incremental 60,000 sq ft of manufacturing and warehousing capacity through a lease signed late last calendar year as we begin to execute on growing demand for our data center backlog.

In Houston, we recently leased an additional 50,000 sq ft of manufacturing and integration capacity while also establishing two satellite engineering offices in Southwest and Northwest Houston to deepen our engineering and design bench and broaden our coverage of the metro Houston area. Most significantly, we have substantially completed the Jacintoport expansion, adding 335,000 sq ft of capacity, which is now operational. Additionally, we recently decided to further expand this location by an additional 80,000 sq ft. This will be a world-class fabrication yard spanning roughly 1 million sq ft with 1,200 ft of bulkhead for water access, ideal for shipping large single-piece Power Control Rooms and large offshore modules. With this expansion, we plan to support the accelerating demand for custom Power Control Rooms targeted at core industrial applications, but this capacity will remain fungible across all the markets that we serve.

At full utilization, we expect it to support well over $100 million of incremental annualized revenue. We are also looking forward and initiating the next phase of our capacity expansion strategy. During our fiscal third quarter of 2026, the board authorized the lease of a new facility that will add approximately 275,000 sq ft of manufacturing and integration space, which we expect to bring online in our fiscal third quarter of 2027. Finally, we continue to evaluate a purpose-built greenfield Powell-owned factory of somewhere between 250,000 to 300,000 sq ft, which would further support increased future fabrication needs for the markets that we serve. Turning to the current operations, labor availability and supply chain constraints remain two areas that we are closely monitoring. We are beginning to see increased competition for skilled craft labor across a broad geographic footprint.

While this has not had an impact on our ability to execute our backlog to date, we remain mindful of the potential risk due to the increased demand for skilled labor as we look ahead to fiscal 2027 and 2028. On the supply chain front, our teams continue to work closely with our key suppliers and partners to ensure material availability and delivery schedules remain aligned with our project commitments. As we enter fiscal 2027, the environment across each of our key verticals remains very active. We see continued momentum across most of the markets that we serve, as evidenced by the fiscal 2026 order strength across our oil and gas, electric utility, and commercial and other industrial market sectors.

In our oil and gas sector, the most active end market is clearly being driven by the demand for LNG, and we believe we are in the early innings of a multi-year infrastructure build-out and anticipate that this market domestically will remain active into the foreseeable future. Turning to our electric utility segment, the outlook remains robust and balanced across the customers and geographies that we serve. Demand continues to be underwritten by structurally undersupplied power generation and grid capacity, and the growing wave of investment in electrical infrastructure is broad and durable. Finally, with respect to the data center opportunities that we are seeing, these are much more standard electrical applications versus our traditional engineered-to-order configurations, and we continue to find strong partners commercially that enable Powell to further penetrate this market.

On the electrical automation front, we are one year on from closing the Remsdaq acquisition, and it has proven synergistic and accretive across the company. The domestic data center market has pulled Remsdaq technology into the U.S. faster than we had planned, and it complements our medium voltage offerings on many of the data center orders that we secured throughout fiscal 2026. Additionally, we see a unique and valuable opportunity in U.S. government and defense, leveraging our U.S.-centric supply chain, operations, and workforce, which position us well to support national defense or other governmental institutions for critical electrical distribution applications.

Finally, on M&A, our pipeline is healthy, and we are focused on complementary electrical products and/or markets expanding our breadth in automation and on building our services franchise. Valuations across the space are rich, so we will stay disciplined and act where we see both strategic fit and value.

With that, I'd like to turn the call over to Mike to walk us through our financial results in greater detail.

Mike Metcalf

Thank you, Brett, and good morning, everyone. I will begin first with the fiscal fourth quarter business results and then move to the total fiscal year 2026 results. Revenues for the fourth fiscal quarter of 2026 increased by 33% to $397 million compared to the same quarter in fiscal 2025 of $298 million. This is also higher sequentially by $85 million, driven by strong output across our commercial and other industrial sector, and to a lesser extent, a nice uptick across both the oil and gas as well as the utility sectors. Net new orders for the fourth fiscal quarter were $710 million, $439 million higher than the same period one year ago, driven by strong year-over-year activity in our oil and gas and commercial and other industrial market sectors.

During the quarter, we booked approximately $350 million of new, which consisted of one mega order of about $250 million, as well as one mega data center order for roughly $85 million. Overall, we remain encouraged by the level of commercial activity across all of the end markets that we participate in. Considering this level of new order bookings, coupled with the sustained strength of our top-line performance, the book-to-bill ratio was 1.8x for the fiscal fourth quarter and 2.0x for the full year fiscal 2026. Reported backlog at the end of fiscal 2026 increased to $2.7 billion, $1.3 billion higher than the end of fiscal 2025, on strength across most of our key market sectors.

Our core industrial end markets, oil and gas, and petrochemical were 83% higher than the prior year period, while the electric utility sector increased by 34%, and the commercial and other industrial sector grew by over 350% versus the prior year. As we exit fiscal 2026, our backlog is very well balanced, with 38% of the backlog consisting of our oil and gas and petrochemical sectors, while electric utility makes up 23% and 35% for commercial and other industrial, which is made up largely of data center orders. Overall, we were very pleased with both the execution across the business driving record revenue levels for the year, as well as our orders performance throughout fiscal 2026.

Compared to the fourth quarter of fiscal 2025, domestic revenues of $348 million increased by $118 million, or 51%, while international revenues decreased by 29% to $48 million, driven primarily by the softer Canadian end market. From a market sector perspective, revenues from our oil and gas and utility sectors were higher by 24% and 22% respectively on the solid commercial environment in the U.S., driving demand for the industrial build-out across both electrical infrastructure as well as LNG export terminals along the Gulf Coast. Additionally, our commercial and other industrial sector was higher by 179%, driven predominantly by the ongoing strength across the data center end market. Modestly offsetting this growth, our petrochemical and traction sectors were lower versus the same period one year ago by 49% and 24% respectively.

We reported $138 million of gross profit in the fiscal fourth quarter of 2026, which was $45 million or 48% higher than the same period in fiscal 2025. Gross profit as a percentage of revenues increased by roughly 350 basis points to 34.9% of revenues in the current fiscal quarter. The higher quarterly margin rate is primarily attributable to strong project execution across the business, delivering favorable project closeouts, resulting in an incremental 230 basis points to the fourth fiscal quarter margin rate. Additionally, we have maintained our pricing levels at or above the inflationary benchmarks across core commodities and engineered components that we consume in production. When combined with the strong throughput and operational leverage that we are realizing across most of the Powell business units, these variables continue to generate a favorable tailwind to margins across most of our operating divisions.

Selling, general, and administrative expenses increased by $6.8 million or 25% on higher levels of compensation expenses, as well as non-recurring legal and professional expenses accrued in the period. SG&A expenses were $33.9 million in the fiscal fourth quarter, or 8.5% of revenue, compared to 9.1% of revenues in the same period a year ago. In the fourth quarter of fiscal 2026, we reported net income of $81.5 million, generating $2.23 per diluted share, compared to net income of $51.4 million, or $1.41 per diluted share in the fourth quarter of fiscal 2025. We generated $239 million of operating cash flow in the fiscal fourth quarter, driven mainly on the higher earnings and favorable contract milestones associated with the strong orders cadence during the period.

Investments in property, plant, and equipment totaled $8 million during the fiscal fourth quarter as we continue to focus on capacity and productivity projects across the business. Recapping our total year fiscal 2026. Revenues of $1.3 billion increased by $152 million, or 14% compared to fiscal 2025. Most notably, our electric utility and commercial and other industrial sectors were higher versus fiscal 2025 by 21% and 65% respectively, with the oil and gas sector also growing versus the prior fiscal year by 10%. The petrochemical and light rail traction sectors were lower versus the prior year by 42% and 11% respectively. New orders booked in fiscal 2026 were $2.6 billion, 124% or $1.4 billion higher versus fiscal 2025.

With the exception of the light rail traction sector, which was lower versus the prior year by 73%, all of our end markets demonstrated strong year-over-year growth rates, with the oil and gas and petrochemical booking activity higher by 108% and 134% respectively, while the utility and commercial and other industrial market sectors grew 13% and 476% respectively. Overall, throughout fiscal 2026, the business successfully leveraged the strong commercial environment that we've experienced across most of the end markets that we serve, resulting in a healthy mix of orders and backlog exiting fiscal 2026. Gross profit as a percentage of revenues grew 190 basis points year over year to 31.3%, or $69 million higher than fiscal 2025. The margin rate continues to benefit from a stable pricing environment, offsetting the current macro inflationary pressures, while also leveraging Powell's global manufacturing footprint to maximize volume leverage and operational execution.

Selling, general, and administrative expenses were higher by $16 million versus the prior year. Overall, net SG&A expenses as a percentage of revenues were higher versus the prior year by 25 basis points at 8.9% of revenues in fiscal 2026 versus 8.6% in the prior year. We reported net income of $221.1 million, or $6.04 per diluted share in fiscal 2026, compared to $180.7 million, or $4.95 per diluted share in the prior year. Operating cash flow generated in fiscal 2026 was $434 million versus $168 million in the prior year, driven by the higher order intake as well as the income generated versus the prior year.

Total capital spending on property, plant, and equipment was $18.5 million in fiscal 2026, $5.4 million higher than the prior year, driven in large part to the upgrade of our offshore fabrication yard, as well as procuring additional fabrication equipment to address the capacity needs across the business. At the end of fiscal 2026, we held cash equivalents, and short-term investments of $861 million, $385 million higher than our fiscal 2025 year-end position, reflecting the strong orders cadence throughout fiscal 2026, as well as the earnings generated by the business. The company holds zero debt.

Finally, in November 2026, we entered into a commitment increase and reallocation agreement with Bank of America and Texas Capital. Combined, this amendment increased our facility capacity to $200 million from the previous ceiling of $150 million. As we utilize this facility solely for commercial letters of credit, we felt that this was a prudent action in order to ensure our continued commercial success across the markets that we serve. Looking forward, our priorities are clear. We remain focused on executing our growing backlog while concurrently bringing additional capacity online to address the strong market demand.

We are optimistic that the momentum we experienced across our oil and gas, utility, and commercial, and other industrial end markets in fiscal 2026 will continue into fiscal 2027. The composition of our backlog is well-balanced across our key end markets, while the quality of the backlog remains high and provides visibility well into fiscal 2028. With a stable pricing environment, high utilization across our North American manufacturing footprint, and additional capacity coming online in fiscal 2027, we believe these factors position Powell for another strong year in fiscal 2027.

At this point, we will be happy to answer your questions.

Operator

We will now begin the question-and-answer session. To ask a question, you may press star then one on your touch-tone phone. If you are using a speakerphone, please pick up your handset before pressing the keys. If at any time your question has been addressed and you would like to withdraw your question, please press star then two. Our first question for today will come from Manish Somaiya with Cantor. Please go ahead.

Manish Somaiya

Good morning, Mike and Brett. Congrats on a strong quarter, on a strong year. I wanted to ask first on the LNG award, if you can just help us understand the incremental margins or margin mix profile that brings to the backlog. More importantly, how should we think about the conversion of that $250 million in 2027 versus 2028?

Mike Metcalf

Hi, good morning, Manish. This is Mike. I will take that one. The margin profile for that particular project is really not much different than the rest of our aggregated backlog. From a mix perspective, no anomalies there. This will be an exceptionally long project. It is $250 million, very, very large project, which will span probably the better part of three years from order intake to delivering the final PCRs. It is going to span quite some time.

Manish Somaiya

Okay. That's helpful. Then just going back to the backlog conversion, I think last time when you guys reported for the June quarter, the $1.3 billion of backlog at that point, 54% of the backlog was expected to convert over the following 12 months. Would you have that same figure for the $2.7 billion that you currently have in the backlog, what converts over the next 12 months?

Mike Metcalf

Yeah. You'll see that in the 10-K that's released later this afternoon. The number is a little lower with the backlog nearly doubling versus the prior year, resulting from 125% higher order intake versus fiscal 2025. This pushes the conversion ratio a bit lower, with a greater proportion of the revenue converting beyond the fiscal 2027. So at the end of 4Q, of that $2.7 billion in backlog, we see $1.3 billion of it scheduled to convert in 2027. The remainder would convert thereafter, so roughly 50%. By comparison, to accentuate that point, at the same point last year, so as we exited fiscal 2025, 60% of the $1.4 billion backlog, or a little better than $800 million, was expected to convert in the next 12 months.

The conversion rate is a little, the ratio is a little lower, but it's just a function of math and the level of bookings that we've accepted.

Manish Somaiya

Then, maybe one for Brett. If you can just talk about what you're seeing in the data center side. Obviously, having this new $85 million order is clearly a positive. I think in the press release, you sounded very bullish, and of course, post the midterms, there's been a lot of concern about how that's going to play out. So perhaps if you can just help us understand where your data center concentration is, what are you hearing from customers, what still makes you positive going forward? I think that would be a big help to all of us. Thank you.

Brett Cope

Yeah. Hey, Manish. Good question. We have the same question here. Certainly, we see the macroeconomic and certainly not missing the elections and how that's created a narrative out there. We have been out. I've been out personally last couple weeks, out meeting clients. One of the things we've talked about as this market's come on for us from 2022 and on is finding our way into the market more sticky, not just within the facility itself, outside to inside, but channels into the market through. This has built our distribution channel and partners. We continue to make good progress on that. We're finding good partners out there in this space. Coming into today's call, as we close out the year and head into 2027, 2028, strong momentum.

There is a lot of pent-up work that is still rolling. Most of the summary comments, I'd say three-ish to five years. I mean, the next three years in terms of what's going on and funded projects and concerns around capital circularity. In the next couple years, it doesn't seem to be a thing. Now, could it be in five or six years? Could there be something developed with the change in the future? I think in terms of funded projects and things that are rolling, I feel pretty bullish with what's out there. We've got to find our way into that. Doesn't change the work ahead of Powell, but the potential is very strong, and we're pretty excited.

Operator

The next question will come from Min Cho with Texas Capital Securities. Please go ahead.

Min Cho

Right there. Thank you. Thank you for taking my questions, and congratulations on a great quarter and year. Brett, you talked about the duration of your backlog going kind of beyond fiscal 2028 a little bit. Can you talk to any visibility into the kind of additional pipeline of work you have in the near to intermediate term? Any confidence in continued new awards, whether it's just in your core business or even on the mega projects?

Brett Cope

Good morning, Min. First of all, I will walk through all three verticals. Core oil and gas, pretty heavily buoyed by the LNG and related market and gas conversion to chemicals or pipelines. Along with, I do not want to discount work going in and around oil on and offshore. We have very good visibility. We have always enjoyed really long, from conceptual through FEED into FID position because of our long history there. Over the midterm to long term, I feel good about that. What we did the last couple years with the investments, the offshore property, and the recent expansion noted in our comments, we added another 80,000 sq ft just recently. It was the last little bit of that property, and we felt on the heels of the 335 expansion, adding that additional last little piece, because we feel good about the midterm, about that core market.

It is going to take up that capacity and be fully utilized here over the next three or four years. Utility, look, this has been a 12-year journey for us. I look at the wins and the losses, and we have good visibility, and I want better visibility. Of the three verticals, this is the one I am probably most driving for the future of Powell. Not taking away from any of the two other market verticals, but there is a huge gap between the generation and the grid needs that are out there. I feel really strong about especially our position in the U.S. and Canada here. We are making good progress in the U.K. and some other areas on the IEC side of the electric standard, but the U.S. and Canada, really good visibility and getting better.

Data centers, I still use the word opportunistic, going back to my earlier response to Manish. The folks that we are bonding with and building relationships to get ahead and to have better visibility in advance. I mean, the market in general moves really quick. I am sure you heard that from a lot of other companies in the data center space. It is still speed-driven today, and we are doing incrementally better quarter every quarter, but I think we can still do more to affect our future. The visibility is good, not as good as the other two, but as we build partners, it will improve, I think, over the coming quarters, coming years.

Min Cho

Excellent. Brett, you mentioned that the data center products tend to be a little bit more standard versus your historical advantage in offering more of a customized solution to your customers. Outside of just timing, which you just kind of mentioned here, how are you winning the work versus some of your competitors there?

Brett Cope

Well, in the early days, it was just capacity and availability. Again, the speed piece, definitely, this market moves really quickly. When something gets pent up in the market on electrical distribution, they move to another solution, or they will redo the one-line, notwithstanding the large conversation between an all-AC data center and the coming DC structure for some part of it. Just the overall electrical one-line, the distribution strategy, it can move really quickly depending on what is available. If I go back a couple years ago, transformers were a great example where everybody were stacking in large powers, and then they moved to medium power just because of availability of factory capacity. The same kind of flows all through the electrical distribution design.

As we have become more involved with the partners and the end users, we are incrementally able to influence that design thought about, "Have you thought about this design or that design?" And have a little bit more time, not a lot, to have an engineering discussion to influence it. We were learning too. We have noted on the calls last couple quarters about, as we built flow lines, which we continue today to do, to build a configure-to-order type approach to the market, that is allowing us to, I do not want to say get over our skis, but take a little bit more calculated decision, not risk, because as we are learning how the velocity of this market can flow through our factories,.

We are able to go back and work with our clients going, "Okay, we feel better about what you are asking us. There is not going to be a lot of changes throughout the duration of the project, and we can commit to a much faster velocity on the overall program in terms of PO to delivery." That is a learning we have had last quarter or two, and I think that will be accelerated further in 2027 as we continue to engage this market sector.

Min Cho

Great. That is very helpful. Thank you. Mike, if I can just get a quick question in. Obviously, you mentioned that fiscal 2027, you expect the fiscal 2026 margins to be sustainable. Can you provide a little more of a range? Do you feel like that 31.3%, is that kind of a sustainable but low watermark for you, just based on what you see in the backlog, just in terms of mix and volume? Any additional commentary about margins would be helpful.

Mike Metcalf

Yeah, sure. Let me provide a little bit of color. First, let me deconstruct the margins from 2025 and 2026. You go back to 2025, we exited, our reported margins were 29.4%. Of that, there was about 185 basis points of project closeout. So base margins exiting backlog were roughly 28%. Now, compare that to this most recent year, fiscal 2026. Our reported margin was a little better than 31%, 31.3%, which included about 150 bps of closeout upside. We are exiting the backlog at about a 30% clip, which is consistent with the margins that we see in backlog. We clearly, as we have been talking over the last four calls here, we are clearly seeing operating leverage and pricing stability offsetting the macro inflationary challenges and pressures in the market.

Now, as we look forward to fiscal 2027, and considering the historical performance that we have demonstrated on project execution and the utilization across the business, it is reasonable to assume that we would get some element of a continued favorable trend on the closeouts. As Brett just mentioned, as the volume of configure-to-order projects make its way through the system, we are optimistic that we see throughput velocity increase and potentially a modest tailwind for margins. That should be modestly tempered, as in Brett's prepared comments, we are standing up a lot of new facilities to address capacity, and that could create a brief productivity air pocket in the system as we stand those facilities up. That is kind of how we are looking at the margin rates going forward.

Min Cho

Great. Thank you. Very helpful.

Mike Metcalf

Okay.

Operator

Your next question will come from Chip Moore with ROTH. Please go ahead.

Chip Moore

Hey, morning. Thanks for taking the question. Mike, you just answered mine on margins. Maybe on some of the capital investments and capacity expansion, can you just give us a sense of incremental revenue capacity from some of the actions underway, and how are you thinking about CapEx next year, before any greenfield, and just remind us what a greenfield might look like? Thanks.

Brett Cope

Hey, Chip. It's Brett. Let me start with the summary, because Mike and I were talking about this prior call. We didn't have it in the prepared comments, but there were some additional moves we made in Q4. From a summary standpoint, I know I talked about it last quarter, but if you look at where we'll be from 2025 through 2026 completed adds, and this is all production office and warehousing space. We'll be around 2.6 million sq ft here as we kind of complete the calendar year. Jacintoport's up and going at 80,000 sq ft. It's basically we're filling in the rest of an area out there as we head towards 2027, and then we've been doing some incremental leasing and buying.

That's where we'll be at the end here as we wrap up 2026 in both fiscal and calendar. We also talked about other things we're doing. The other lease that the board approved in Q3, we just submitted some paperwork to the city here in Houston to extend some laydown area at the back of the breaker factory. If you look into next year, we should be around 3.2 million. We're adding another 0.5 million of space in various, both enclosed and outdoor areas, to support all of this growth. We didn't really cover that in the prepared, so I appreciate the question. The 335 definitely is in support of the roughly $100 million, and then there'll be some incremental when we get that 80,000.

The overall growth is sort of smattered around these additional incrementals that we're doing throughout the three facilities in Houston. Ohio, we're doing an incremental. We're evaluating one in Canada. The one that we talked about is the future new build. We've not pulled the trigger on that. We are refining the location where we think we want to be. Again, that will be balanced against the growth of the business, but also backstopped by some of the organic R&D.

I don't know about Mike, want to jump in? I don't think.

Mike Metcalf

With respect to CapEx associated with those actions, Chip, I mean, it is not going to be crazy. The 275,000 sq ft lease facility here will require probably the most substantial amount of capital because we have got to build it out with cranage and the like. Next year, you are probably looking at, with everything Brett just mentioned, probably in the $15 million-$20 million range.

Brett Cope

Incrementals, the run rate we have had on R&D and everything else.

Chip Moore

Very helpful. Appreciate it. Thank you for that. Maybe for my follow-up, guys, I think a lot of concerns, right, around cyber and everything else here recently. You just brought up the national angle. Any updates there on inroads just with your domestic position?

Brett Cope

The way we are built with the supply chain and the factory footprint that we have in the U.S., it is a good message into the market, whether we are pursuing utility, the data center. I made a comment in the prepared remarks around some of the government work. We are having really positive engagement there. I cannot really point to any numbers that are there yet, but I feel like we are really close because the Powell story is well received. That said, no matter the market, you have got to execute and earn your way in. It is a very competitive market. A lot of players running to it.

For us, what we can control is execution and hitting our dates and delivering in all these markets. Just like the earlier questions, Chip, on the data center piece, that is still the strongest way we are fighting our way into that data center market and the momentum that still exists, and why we feel optimistic to carve out our opportunity there. Yes, speed is an issue in that market, but they still need their kit when they need their kit, and I feel good about it. I think we are going to continue to earn our way into that market.

Operator

The next question will come from John Franzreb with Sidoti & Company. Please go ahead.

John Franzreb

Good morning, guys, and congratulations again on such a strong year end. I am actually curious about the backlog. 50% is deliverable next year. How much is going to be delivered in year two, 2028?

Mike Metcalf

Of that remaining 50%, John, probably a good chunk of, probably the majority of it, as I mentioned to Manish, the large LNG order, that is a three-year, that has got a three-year window. So those big orders will carry over out into 2028, and beyond. But most of it will be convertible in the 2028 period.

John Franzreb

Got it. I guess I'm kind of curious, your legacy business had virtually no cancellation risk. Is that also true about what you're seeing in the data center market? Can you kind of walk us through the certainty in those deliveries?

Brett Cope

John, it's Brett. Morning.

John Franzreb

Hey, Brett.

Brett Cope

We know that's, watching the market, watching other, the whole what's going on, is the risk increased with the data center market on this configure-to-order model? I would say yes, the risk probably does go up because it's a lot less engineering, then you're just pumping out product to dates. I understand that narrative out there. Have we seen cancellations? We have, but not in the sense of the project isn't funded. It's more the design is moving so quick around the speed element that the back end of the program gets refined, so quantities go up and down for what they need. But we've been able to work with the client on multi-phases in the most cases to reallocate that. It hasn't come back in sort of some big cancellation, if you will. So we really haven't experienced a de-book.

We worked with the clients to reallocate capacity on the job across the different design things that are moving so quickly or around multiple campuses. We are still early innings, even though this market segment has grown quite quickly for Powell. I cannot accentuate enough how much speed still seems to be. That is the feedback I have gotten the last month being on the road, meeting with our partners and the clients in this space. About the next two to three years and what it looks like, and speed is still the message, and the projects are big, and we are going to continue to fight our way in and make it sticky.

John Franzreb

Okay, got it. One last question, actually about the petrochemical market. It has been down significantly over the past two years. Brett, you kind of alluded that maybe this is a bottom. Can you kind of walk us through what has happened and what you are seeing on a go-forward basis there?

Brett Cope

Yeah, I think there is a lot of macro elements that really took that market down, when it became noticeable to us about a year ago, and this, why is not the petrochem moving as quick? There were a lot of projects that were teed up two to three years ago, especially with some of our core clients that we know really well. They were out talking about, "Hey, there is some FEED work starting. You guys need to pay attention, come over here and have discussions." Then over the couple years into last year, it started to slow and go quiet. Popped a little bit better this year. The fertilizer market, I think, still has some undercurrents that look decent. We are starting to see some projects that were on hold slowly come off hold, but still more mid to back end of 2027.

It is not coming back in some sort of barnstormer fashion. It is just slowly making its way back. I think the overall macro environment between supply out of the North American market, consumption in the Chinese market still is one of the themes. Pricing power is just come back with a couple of large Tier 1 clients that we have, kind of watch how they recover along with this macro picture. So, I think we are hopeful, but we are not seeing a massive jump yet. It just seems to be turning the corner here in the last couple quarters, and so anxious to see how this progresses into 2027.

John Franzreb

Great. Thanks for taking my questions.

Brett Cope

Bye, John. Take care.

Operator

The next question will come from Tomo Sano with J.P. Morgan. Please go ahead.

Hi, this is Brendan on for Tomo. Thanks for taking my question. Just touching on the backlog again, you described it as balanced and provide some data around that. Just curious how concentrated it is amongst the larger projects versus those smaller that you mentioned, and any commentary on customer concentration within the backlog, please.

Mike Metcalf

Yeah. Hey, good morning. This is Mike. I will address that. With respect to the backlog segmentation, it is really well-balanced. The core industrial, as I define, is oil and gas and petrochem. That is 37% of our backlog. The utilities about a quarter of the backlog, and the remainder is essentially the data center commercial and other industrial. With respect to the different mix of sizes in the backlog, as we talked about over the last couple quarters, there are some mega projects, both industrial mega projects as well as data center mega projects. But the level of projects ranging from, say, $10 million-$50 million is quite voluminous as well, and that provides a, as Brett mentioned in his prepared comments, it provides an ability to really leverage the variable cost side of the equation as the larger projects make their way through the system.

Great. Thank you. Related to your intra-quarter book and ship, just curious if you have noticed any deviation from historical patterns there, particularly as your mix has continued to evolve, project sizes have continued to evolve. Just, yeah, curious any change for that book and ship, please.

Yeah. We continue to see accretive gains in our book and ship. As we sit here today, the average is running between $75 million and $80 million a quarter of book and ship volume. If you went back 24, 36 months, that is nearly double what it was previously. We are seeing good gains there, and as we bring on more capacity in this configured order, volume starts exiting the backlog. We expect that that will add to those gains.

Great. Thank you.

Operator

The next question is a follow-up from Manish Somaiya with Cantor. Please go ahead.

Manish Somaiya

Mike, I just had a quick follow-up. Revenues obviously went up quite a bit in the fourth quarter, up, I think, 27% sequentially. Perhaps if you can just talk about if there was anything unusual in project timing or pull forward in the quarter, or is it just strong demand that's helping?

Mike Metcalf

Yeah. No unusuals, Manish. I think you're seeing a function of the increased capacity as we bring some of the new capacity online. But nothing unusual. What I would remind you of as you look at sequential variances, our first fiscal quarter is typically seasonally soft. As you compare 4Q to 1Q, you're going to see probably a negative comp because we always run much softer in 1Q. But that, as you know, that picks up in 2Q through 4Q.

Manish Somaiya

Okay. Wonderful. Thank you, Michael.

Operator

This will conclude our question and answer session. I would like to turn the conference back over to management for any closing remarks.

Brett Cope

Thank you, Chuck. As you have heard from Mike and I, we are very pleased with both our fiscal fourth quarter along with our total 2026 year-end financial performance. The markets we serve continue to support our belief that fiscal 2027 will be another strong year for Powell. I would like to again thank our incredibly talented employees along with our valued supplier partners for their hard efforts, focus, and commitment to all of Powell's valued customers. Thank you for your participation today. Mike and I look forward to updating you all next quarter.

Operator

The conference has now concluded. Thank you for attending today's presentation. You may now disconnect.

Financials USD · E = consensus estimate · column links open the source filing

Revenue and net income

FY2023FY2024FY2025FY2026FY2027EFY2028E
Revenue $699.31M $1.01B $1.10B $1.26B $1.64B $1.94B
Revenue Growth +31.3% +44.8% +9.1% +13.8% — —
Gross Profit $147.55M $273.09M $324.38M $392.98M $508.33M $612.03M
Gross Margin 21.1% 27.0% 29.4% 31.3% — —
EBITDA $71.13M $185.64M $225.13M $273.68M $357.00M $437.17M
EBITDA Margin 10.2% 18.3% 20.4% 21.8% — —
Net Income $54.53M $149.85M $180.75M $220.99M $276.26M $338.85M
Net Margin 7.8% 14.8% 16.4% 17.6% — —
Diluted EPS $1.50 $4.10 $4.95 $6.04 $7.71 $9.45
EPS Growth +291.3% +173.3% +20.7% +22.0% — —
Operating Cash Flow $182.55M $108.66M $167.94M $433.69M — —
CapEx -$7.82M -$11.98M -$13.15M -$18.46M — —
Free Cash Flow $174.73M $96.68M $154.79M $415.23M $228.89M $423.78M
Cash $279.01M $358.39M $475.53M $860.83M — —
Total Debt $1.44M $9.45M $1.66M $2.57M — —
Enterprise Value $705.79M $2.31B $3.21B $5.86B — —

Ratios · FY2026

Valuation
P/E30.54×
P/S5.35×
P/B8.03×
P/FCF16.19×
EV/Sales4.67×
EV/EBITDA21.42×
FCF Yield6.2%
Shareholder Yield0.4%
Profitability
Operating Margin21.1%
Net Profit Margin17.6%
Return on Equity29.9%
Return on Invested Capital112.6%
Return on Assets14.8%
R&D to Revenue0.01
Health
Current Ratio1.87
Quick Ratio1.69
Debt / Equity0.00
Debt Ratio0.00
Net Debt-$858.26M
Payout Ratio5.9%
Growth
Revenue 1Y Growth13.8%
Revenue 3Y CAGR21.6%
Revenue 5Y CAGR21.7%
Diluted EPS 1Y Growth22.0%
Diluted EPS 3Y CAGR59.1%
Diluted EPS 5Y CAGR225.0%

Revenue · FY2026

Oil and Gas (Excludes Petrochemical)
$446.02M 35.5%
Electric Utility
$338.71M 27.0%
Commercial and Other Industrial
$294.31M 23.4%
Petrochemical
$88.16M 7.0%
All Others
$52.39M 4.2%
Light Rail Traction Power
$36.66M 2.9%

Revenue by Geography · FY2026

United States
$1.03B 81.7%
Canada
$113.59M 9.0%
Middle East and Africa
$51.26M 4.1%
Europe
$33.91M 2.7%
Asia/Pacific
$29.20M 2.3%
Mexico, Central and South America
$2.08M 0.2%

Holders 654 institutions on file

InstitutionShares% of Shares OutValueChange QoQFiled
Blackrock, Inc. 3.59M 9.84% $661.94M -0.56% Nov 13, 2026
First Trust Advisors Lp 1.76M 4.84% $325.32M +23.58% Nov 12, 2026
Vanguard Portfolio Management Llc 1.68M 4.60% $309.54M +7.72% Nov 13, 2026
Vanguard Capital Management Llc 1.43M 3.91% $263.03M +11.22% Nov 13, 2026
State Street Corp 962.23K 2.64% $177.50M +0.65% Nov 12, 2026
Dimensional Fund Advisors Lp 826.77K 2.27% $152.53M -15.20% Nov 4, 2026
Morgan Stanley 672.01K 1.84% $123.97M -12.51% Nov 25, 2026
Geode Capital Management, Llc 618.99K 1.70% $114.21M -7.45% Nov 6, 2026
Ubs Group Ag 486.33K 1.33% $89.71M +32.28% Nov 10, 2026
Jacobs Levy Equity Management, Inc 480.73K 1.32% $88.68M +8.90% Nov 16, 2026
Aqr Capital Management Llc 472.97K 1.30% $87.25M +511.29% Nov 16, 2026
Goldman Sachs Group Inc 456.39K 1.25% $84.19M +47.96% Nov 16, 2026
Fisher Asset Management, Llc 413.20K 1.13% $76.22M -43.52% Nov 6, 2026
Gw&k Investment Management, Llc 402.80K 1.10% $74.31M -1.78% Nov 10, 2026
Rockefeller Capital Management L.p. 349.12K 0.96% $64.40M +17.34% Nov 13, 2026

Insider and Congress trading All insider trades → All Congress trades →

Insider trades · SEC Form 4

Latest 25 filings: 8 sales ($3.6M) · 0 buys ($0)
DateInsiderTypeSharesPriceValueOwned afterFiling
Oct 16, 2026
filed Oct 20
Ping Ni
Corp Controller
Sale 700 $167.14 $117K 5.34K SEC ↗
Oct 1, 2026
filed Oct 2
William Marshall Mauney Jr.
Vice President, R&d
Award 525 $181.67 $95.4K 11.08K SEC ↗
Sep 30, 2026
filed Oct 2
William Marshall Mauney Jr.
Vice President, R&d
Sale 301 $187.67 $56.5K 10.55K SEC ↗
Oct 1, 2026
filed Oct 2
Peter G. Hoglund
Vice Pres, Global Service
Award 475 $181.67 $86.3K 5.77K SEC ↗
Sep 30, 2026
filed Oct 2
Peter G. Hoglund
Vice Pres, Global Service
Tax withholding 99 $187.67 $18.6K 5.30K SEC ↗
Oct 1, 2026
filed Oct 2
Davide Tuninetti
Chief Human Resource Officer
Award 600 $181.67 $109K 3.71K SEC ↗
Sep 30, 2026
filed Oct 2
Davide Tuninetti
Chief Human Resource Officer
Tax withholding 99 $187.67 $18.6K 3.11K SEC ↗
Oct 1, 2026
filed Oct 2
John Birchall
Managing Director
Award 400 $181.67 $72.7K 19.50K SEC ↗
Sep 30, 2026
filed Oct 2
John Birchall
Managing Director
Tax withholding 599 $187.67 $112K 19.10K SEC ↗
Oct 1, 2026
filed Oct 2
David L. Eckenrode
Assistant Secretary/treasurer
Award 165 $181.67 $30K 1.26K SEC ↗

Politicians’ trades

All politicians →
TradedPoliticianTypeAmountOwner
Jul 8, 2026
filed Sep 22 · 76d later
Donald J Trump
R Executive branch
Sell$1K–$15KSelf
May 15, 2026
filed Jul 1 · 47d later
Donald J Trump
R Executive branch
Sell$100K–$250K

Politicians holding POWL

1 on file
$506

Midpoint of each disclosed value range, from the latest annual disclosures.

Historical data USD · newest first

DateOpenHighLowCloseChangeVolume