USMarketsToday.com
SIF

Sify Technologies Limited

SIFY · NASDAQ ·
$11.11-$1.03 ↘ 8.48%
At close: Nov 25, 4:00:01 PM EST
$11.21+$0.10 ↗ 0.91%
After-hours: Nov 25, 4:56:56 PM EST
Volume
Market Cap$804.75M
Open$11.93
Trailing P/E-126.68
Day Range$10.99–$11.93
Dividend Yield0.00%
52W Range$10.85–$17.85
EPS$1,997.98
Volume186.40K
Avg Volume32.08K
50-Day Avg$12.75
200-Day Avg$14.40
Why is SIFY moving?

SIFY fell about 6.6% as the Indian data-center and IT services stock continued a pullback from recent gains, with no new company-specific catalyst and the drop looking like profit-taking and weak sentiment on a volatile, thinly traded stock.

Bull vs Bear

Every version →
▲ Bull caseDemand for Indian data center capacity far exceeds supply, so pricing is improving and returns are rising. Management plans to convert a 113-megawatt contracted backlog into high-margin revenue over three quarters, with 136 MW already operational. Multi-city land banks and integrated networks protect against new entrants.[5][8][9]
▼ Bear caseExecution is not matching the narrative. Quarterly revenue of $143.84 million badly missed expectations of $189.58 million, and the stock fell about 8% after results. Heavy buildout spending and a one-analyst Sell consensus suggest backlog conversion may be slower or costlier than management projects.[2][4][9]

Notable price movement

All 15 moves →
Nov 249:09 PM ET
$12.14 ↘ 1.22% at Close·$11.07 ↘ 8.81% After Hours
Sify Technologies is drawing attention as investors weigh its data-center and digital infrastructure story against a choppy backdrop for AI-linked and Indian equities. Recent coverage points to new institutional positions and the Rs 37 billion IPO filing by subsidiary Sify Infinit Spaces. Offsetting that, MarketBeat flagged a gap down on Monday, and the last quarter's revenue of $143.84M fell well short of the $189.58M consensus, with a 0.74 current ratio. Reuters data also show investors cooling on data-center stocks in Q3. Shares closed modestly lower, down 1.22% at $12.14 on light volume, after a roughly 4% gain on Monday. They were down about 8.8% after hours at $11.07. Indian markets are volatile after the Sensex's biggest drop in five months, while the communication services sector ETF was steady.
$12.61 ↗ 0.80% at Close·$12.76 ↗ 1.19% After Hours
Sify Technologies' data center unit, Sify Infinit Spaces, is reportedly again sounding out investors for a roughly 37 billion rupee ($396M) India IPO, per Bloomberg. It is now targeting a minimum valuation of about $2.8B, down from about $4.2B earlier this year. It could walk away if it can't reach that level, and it reportedly hasn't yet lined up anchor commitments from major domestic institutions. Crisil projects India data center capacity could grow about fivefold to near 7.5 GW by March 2030. Sify shares closed modestly higher, up 0.8% at $12.61 on average volume, and added about 1.2% after hours. The gain came while US equities sold off sharply (S&P 500 down about 2%, XLC lower) and India's Sensex rallied 1.2% to 83,022, even as IT stocks lagged.
$12.38 ↘ 1.75% at Close·$12.38 ↗ 0.00% After Hours
Sify Technologies shares closed lower in thin trading, with no fresh company-specific news in the available sources. They fell 1.75% to $12.38 after an intraday high of $12.99, as a risk-off U.S. session weighed on technology and communication services. The Nasdaq fell about 2.5% and the S&P 500 about 1.9% amid an AI-stock selloff led by Nvidia and 10-year Treasury yields near 5.15%. Communication services was among the weakest sectors. India's backdrop was firmer: the Sensex rose 0.63% to 82,105 on record foreign inflows, and Indian telecom names like Bharti Airtel gained. Sify's data center and AI-infrastructure exposure leaves it sensitive to shifts in AI sentiment, though its decline was smaller than the broader U.S. tech selloff.
$12.60 ↘ 2.55% at Close·$12.50 ↘ 0.79% After Hours
Sify Technologies, an Indian data-center and digital infrastructure provider, was caught in a broad risk-off tape tied to the Nvidia leadership shake-up, an AI/semiconductor sell-off and rising yields. Shares closed lower on light volume of about 10,000 versus a roughly 30,000 average, with no company-specific news in the sources. Indian equities also slipped, with the Sensex down 0.39% to 81,592 on a 6.09% inflation print and higher crude, which snapped a rally driven by record foreign inflows. Sector context was mixed: AI infrastructure names sold off, but Goldman flagged strong India data-center leasing at Iron Mountain, and WSJ noted telecom as the most distressed credit sector. Shares closed down 2.55% at $12.60 and slipped a further 0.79% after hours, while the communication services ETF held flat.
$13.23 ↗ 1.15% at Close·$13.23 ↗ 0.00% After Hours
Sify Technologies is drawing investor attention after an Economic Times report that Meta is likely to partner with it on a 500 MW hyperscale data centre in Visakhapatnam. Sify would invest about Rs 15,266 crore and lease the capacity to Meta, which would also land its Waterworth subsea cable at Sify's landing station. The companies did not respond to the report, and it relies on an unnamed source. Shares closed up about 1.15% at $13.23 after trading between $13.08 and $13.49, on light volume near average. The stock was little changed after hours. The move came as India's Sensex rose 0.95% to 81,879 on foreign inflows and softer crude, and as the communication services ETF (XLC) edged slightly lower after hours. Investors are also watching Sify's heavy debt and negative free cash flow from its data-centre buildout, with the next earnings expected around January 12.
$13.34 ↗ 2.69% at Close·$13.34 ↗ 0.00% After Hours
Sify Technologies is drawing support from a risk-on backdrop and renewed interest in Indian assets and data-center themes, with no company-specific announcement in the sources reviewed. Foreign investors bought over $4.1 billion of Indian equities in November, and the Sensex closed at 81,106.65, up 0.13%. US markets rebounded from last week's AI-related selloff, and communication services led early gains. Data-center news also stayed in focus, including the planned sale of STT GDC India at over $5.5 billion and CRISIL's forecast that India's data-center capacity will expand fivefold by 2030. Shares closed up 2.69% at $13.34 on light volume of about 14,000, versus an average of about 30,600. This followed a 3.5% gain on Friday. Technical commentary points to resistance near $13.57 and support near $12.77. The stock remains well below its 52-week high of $17.85. The Yahoo Finance consensus is Neutral, with a $27 target estimate.
$12.99 ↗ 3.51% at Close·$12.99 ↗ 0.00% After Hours
Sify Technologies, an India-based digital infrastructure and data center operator, closed higher on very light volume as Indian equities extended a seven-session rally and defied a global tech and…
Why SIFY moved on Nov 6 →
$12.55 ↘ 5.50% at Close·$12.44 ↘ 0.88% After Hours
Sify Technologies shares slid as a sharp AI and data-center selloff hit US markets, even though India's Sensex closed 2.6% higher.
Why SIFY moved on Nov 5 →
$13.28 ↗ 3.91% at Close·$13.29 ↗ 0.08% After Hours
Sify Technologies shares closed higher, rebounding as a broad risk-on rally followed the Democratic sweep in the US midterms.
Why SIFY moved on Nov 4 →
$12.78 ↗ 0.00% at Close·$12.78 ↗ 0.00% After Hours
Sify Technologies is drawing mixed investor sentiment after its fiscal Q2 results. Revenue rose about 31% on data-center demand: 136 MW is operational and 113 MW is contracted.
Why SIFY moved on Nov 3 →
$12.78 ↗ 2.73% at Close·$12.78 ↗ 0.00% After Hours
Sify Technologies shares closed higher as Indian equities rallied, with the BSE Sensex up about 1.7% to 75,692.78 on falling oil prices, strong Reliance results and renewed foreign buying.
Why SIFY moved on Nov 2 →
$12.44 ↘ 1.50% at Close·$12.44 ↗ 0.00% After Hours
Sify Technologies traded in the aftermath of its Q2 FY27 results, where revenue rose 31% to INR 13.8 billion and adjusted EBITDA rose 33%.
Why SIFY moved on Oct 30 →
$12.58 ↗ 2.61% at Close·$12.73 ↗ 1.19% After Hours
Sify Technologies' fiscal Q2 results drew a mixed read: revenue grew 31% to INR 13,798M, adjusted EBITDA rose 33% to INR 3,131M, and net profit swung to INR 40M from a INR 275M loss.
Why SIFY moved on Oct 28 →
$12.26 ↗ 5.87% at Close·$12.50 ↗ 1.96% After Hours
Sify Technologies shares rallied into its fiscal Q2 2026-27 earnings release, scheduled before the open on Oct. 28 with a call at 8:30 AM ET.
Why SIFY moved on Oct 27 →
$11.58 ↘ 0.43% at Close·$11.58 ↗ 0.00% After Hours
Sify Technologies shares were little changed ahead of its fiscal Q2 2026-27 results, due Wednesday, October 28 before the open with an 8:30 AM ET call.
Why SIFY moved on Oct 26 →
Largest moves in the past year from daily prices
Jul 2, 2026
Sharp Drop
SIFY fell 7.8% to close at $15.32. Intraday range of $1.60 ($15.15 – $16.75) spanned 10.6% in a volatile session. Closed near the day's low as sellers pressed into the close.
-7.8%
Jun 24, 2026
Sharp DropGap Up 3.1%
SIFY fell 7.3% to close at $14.84, opening 3.1% above the prior close. Intraday range of $1.80 ($14.69 – $16.49) spanned 12.3% in a volatile session. Closed near the day's low as sellers pressed into the close.
-7.3%
Jun 8, 2026
Big RallyGap Up 2.6%
SIFY gained 8.4% to close at $15.79, opening 2.6% above the prior close. Intraday range of $1.87 ($14.56 – $16.43) spanned 12.8% in a volatile session. Volume reached 128.44K shares (1.6× the 20-day average).
+8.4%
Jun 5, 2026
Sharp Drop
SIFY fell 14.2% to close at $14.56. Intraday range of $2.62 ($14.34 – $16.96) spanned 18.3% in a volatile session. Volume reached 185.62K shares (2.4× the 20-day average). Closed near the day's low as sellers pressed into the close.
-14.2%
Jun 3, 2026
Sharp Drop
SIFY fell 7.1% to close at $16.01. Intraday range of $1.58 ($15.51 – $17.09) spanned 10.2% in a volatile session. Volume reached 113.42K shares (1.6× the 20-day average).
-7.1%
Apr 20, 2026
Big RallyVolume 2.8× avg
SIFY gained 10.7% to close at $14.86. Intraday range of $2.00 ($13.02 – $15.02) spanned 15.4% in a volatile session. Volume reached 162.36K shares (2.8× the 20-day average). Closed near the session high, with buyers in control into the close.
+10.7%
Feb 6, 2026
Big Rally
SIFY gained 8.9% to close at $14.53. Intraday range of $1.30 ($13.53 – $14.83) spanned 9.6% in a volatile session.
+8.9%
Feb 5, 2026
Sharp Drop
SIFY fell 8.1% to close at $13.34. Intraday range of $1.05 ($13.30 – $14.35) spanned 7.9% in a volatile session. Closed near the day's low as sellers pressed into the close.
-8.1%
Jan 14, 2026
Big Rally
SIFY gained 7.5% to close at $13.91. Intraday range of $1.65 ($12.34 – $13.99) spanned 13.4% in a volatile session. Volume reached 131.23K shares (1.8× the 20-day average). Closed near the session high, with buyers in control into the close.
+7.5%
Jan 13, 2026
Sharp DropVolume 3.3× avgGap Down 4.4%
SIFY fell 13.7% to close at $12.94, opening 4.4% below the prior close. Intraday range of $2.76 ($12.35 – $15.11) spanned 22.3% in a volatile session. Volume reached 215.22K shares (3.3× the 20-day average).
-13.7%
Jan 8, 2026
Big RallyNew 52-Week High
SIFY gained 8.2% to close at $14.57. Intraday range of $1.25 ($13.45 – $14.70) spanned 9.3% in a volatile session. Volume reached 120.71K shares (2.5× the 20-day average). Set a new 52-week high of $14.70. Closed near the session high, with buyers in control into the close.
+8.2%
Jan 7, 2026
Big RallyNew 52-Week High
SIFY gained 7.3% to close at $13.47. Intraday range of $1.41 ($12.18 – $13.59) spanned 11.6% in a volatile session. Volume reached 103.90K shares (2.3× the 20-day average). Set a new 52-week high of $13.59. Closed near the session high, with buyers in control into the close.
+7.3%

Latest news

Research

Independent reports

1Q:F26 Revenue Beat, Earnings In Line; Data Center Expansion Delivering Growth; Expect Earnings Leverage To Improve As Revenue Scales And SG&A Growth Moderates; Maintain $14 Price Target
Sidoti & Company, LLC·Jul 20, 2025 upbeat

Sidoti sees data-center expansion and rising demand for data and cloud services supporting growth, with earnings leverage expected to improve as revenue scales and SG&A growth moderates. It maintains a $14 price target while noting near-term investment costs and leverage.

4Q:F25 Revenue, Earnings Lower Than Projected; We Expect Growth To Rebound In F2026, Led By Strong Demand For Sify’s Data Center Services; Lower Estimates And Target To $14 (From $18)
Sidoti & Company, LLC·Apr 20, 2025 bullish

Despite a disappointing quarter and reduced estimates and target, Sidoti expects data-center demand and new capacity to support a growth rebound; it considers the shares undervalued relative to peers and sets a $14 target. This is a company-sponsored research note.

2Q:F25 Revenue Beat, EPS In Line; Data Center Expansion Is Delivering Strong Growth; Sify Is Positioned To Capitalize On Growing Demand For Colocation Services In India; Maintain $18 Target
Sidoti & Company, LLC·Oct 22, 2024 bullish

Sidoti argues that Sify’s data-center capacity buildout and India’s rising demand for colocation, cloud, and data services offer a long growth runway, while investment costs should give way to better earnings leverage. It views the shares’ valuation discount to peers as unwarranted and maintains an $18 target; this is a company-sponsored research note.

Earnings Earnings history → · Earnings calls →

Next report · Q3 FY2027

DateJan 12, 2027
EPS Est.$0.01
Revenue Est.$2.29M
Avg 1-Day Move±3.2%

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
Q2 FY2027 Oct 28, 2026 $0.00 $0.01 +5,118.2% $189.58M $210.58M +11.1% +2.6%
Q1 FY2027 Jul 15, 2026 $0.01 $0.01 -3.5% $188.23M $193.42M +2.8% -4.1%
Q4 FY2026 Apr 13, 2026 -$0.01 -$0.01 -5.0% $178.39M $188.70M +5.8% -5.9%
Q3 FY2026 Jan 13, 2026 $0.00 -$4.54 — — $11.60B — +0.1%
Q2 FY2026 Oct 27, 2025 -$0.01 -$999.00 -9,989,900.0% $172.56M $164.35M -4.8% —
Q1 FY2026 Jul 18, 2025 -$0.01 -$999.00 -9,989,900.0% $161.16M $170.70M +5.9% -3.8%
Q4 FY2025 Apr 21, 2025 $0.01 -$999.00 -10,288,462.5% $171.56M $150.43M -12.3% —
Q3 FY2025 Jan 17, 2025 $0.00 -$999.00 -144,782,708.7% $149.59M $161.55M +8.0% -9.1%

Latest earnings analysis · Q2 FY2027 · Oct 28, 2026

Q2 FY2026-27 revenue was INR 13,798 million, up 31% year over year. Adjusted EBITDA was INR 3,131 million, up 33%. Profit for the quarter was only INR 14 million, as capacity expansion raises depreciation, interest, and manpower costs. Capex was INR 8,573 million and cash stood at INR 5,868 million.
Revenue mix was network services 43%, data center services 37%, and digital services 20%. Network growth was stronger than expected, driven by the company's own national long-distance fiber build, hyperscale data center growth, and data center interconnect demand. Management expects further network growth in line with data center growth but not at the same revenue multiple as capacity, because unit economics differ at scale.
Operational data center capacity was 136 MW, with 113 MW contracted and scheduled for delivery beginning this quarter over the next three quarters, which management said would bring total to about 249 MW revenue-generating. Total design capacity is expected to reach about 300 MW, and the existing land bank across seven cities could support more than a gigawatt. The 113 MW is mainly in Rabale, with some in Noida and a small amount in Chennai. The previously stated 81 MW for FY27 delivery remains on track.
Management said industry demand far exceeds supply, so there is no pricing pressure, and pricing and returns are improving. The sequential decline in data center revenue was attributed to no one-time enterprise implementation revenue this quarter and lower pass-through power revenue. Digital services turned positive and management expects it to improve further as it builds an AI-led portfolio.
The Sify Infinite Spaces IPO timing is being set with bankers and is not strictly market-related, and the current regulatory window runs to end of January, after which the process restarts. Management said the company is adequately capitalized for its growth plans, with Kotak support if the IPO is delayed further. Two edge data centers are live in Lucknow and Mohali, two more are under way, the Vizag cable landing station has received DOT approval, and Capex is mostly in data centers, with a network split of roughly 80:20.

Earnings call · Q2 FY2027 · Oct 28, 2026 · 8:30 AM EDT

Full transcript →
≈ 29:51 · 130 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Operator

Good day everyone, and welcome to the Sify Technologies financial results for second quarter fiscal year 2026 through 2027. At this time, all participants are placed on a listen-only mode, and we will open the floor for your questions and comments after the presentation. It is now my pleasure to hand the floor over to your host, Praveen Krishna. Sir, the floor is yours.

Praveen Krishna

Thank you, Matthew. I would like to extend a warm welcome to all our participants on behalf of Sify Technologies Limited. I am joined on the call today by Raju Vegesna, Chairman, and M P Vijay Kumar, Executive Director and Group CFO of Sify Technologies. Following our comments on the results, there will be an opportunity for questions.

If you do not have a copy of our press release, please call LuRi Group at 1-646-824-2856 and we will have one sent to you. Alternatively, you may obtain a copy of the release at the investor information section on the company's corporate website. A replay of today's call may be accessed by dialing in on the numbers provided in the press release or by accessing the webcast in the investor information section. Some of the financial measures referred to during this call and in the earnings release may include non-GAAP measures.

Sify's results for the year and the quarter are according to the International Financial Reporting Standards, or IFRS, and will differ somewhat from the GAAP announcements made in previous years. A presentation of the most directly comparable financial measures calculated and presented in accordance with GAAP and a reconciliation of such non-GAAP measures, and of the differences between such non-GAAP measures and the most comparable financial measures that is presented in accordance with GAAP will be made available on Sify's website.

Before we continue, I would like to point out that certain statements contained in the earnings release and on this conference call are forward-looking statements rather than historical facts and are subject to risks and uncertainties that could actually cause results to differ materially from those described. With respect to such forward-looking statements, the company seeks protection afforded by the Private Securities Litigation Reform Act of 1995.

These risks include a variety of factors, including competitive developments and risk factors listed from time to time in the company's SEC reports and public documents. Those lists are intended to identify certain principal factors that could cause actual results to differ materially from those described in the forward-looking statements, but are not intended to represent a complete list of all risks and uncertainties inherent to the company's business. Allow me to turn this over to Mr. Raju Vegesna, Chairman of Sify Technologies. Chairman.

Raju Vegesna

Thank you, Praveen. Good morning, everyone, and thank you for joining on the call. India's digital transformation is entering into a new phase of execution at scale. What was once a digital transformation agenda has now becoming a business imperative, with organizations investing in technology to improve productivity, resilience, and the customer experience.

India continues to benefit from unique combination of progressive policy initiatives, expanding digital infrastructure, and a deep pool of technology talent. As AI adoption gathers pace and the need of secure, scalable, and interconnected digital infrastructure will become even more critical.

This presents a significant opportunity for India to strengthen its position as a global technology and innovation hub. At Sify, we continue to align our investments with these long-term trends. Our integrated portfolio of data centers, network, and digital services enables us support customers as they modernize their technology environment and prepare for an AI-enabled future.

India is no longer preparing for a digital future. It is actually actively shaping it. Sify remains committed to building the infrastructure and capabilities that will help power this next chapter of India's growth. Let me now bring our Executive Director and Group CFO, Mr. M P Vijay Kumar, to explain both the business and financial highlights. Vijay Kumar.

M P Vijay Kumar

Thank you, Chairman. We continue to strengthen our business through sustained investments in infrastructure, technology platforms, and people, aligned with the evolving needs of our customers and the long-term opportunities in India's digital economy. Our investment priorities remain focused on expanding our data center capacity, modernizing our network infrastructure for AI workloads, enhancing our cloud interconnect capabilities, and strengthening the tools and platforms that support operational efficiency and customer delivery.

Equally, we continue to invest in developing our people, building the skills and capabilities required to support emerging technologies and deliver consistent outcomes across our businesses. These investments are being pursued alongside a continued emphasis on cost competitiveness, resource optimization, and cash flow management.

While capacity expansion and capability building have implications for depreciation, interest, and manpower costs, we remain focused on ensuring that capital allocation is supported by sound financial planning, prudent risk management, and long-term business objectives.

Our priority is to maintain a strong balance sheet and adequate financial flexibility while investing for sustainable growth and creating enduring value for our shareholders. Let me now expand on the business highlights for the quarter.

The revenue split between the businesses for the quarter was network services 43%, data center services 37%, and digital services 20%. As of September 30, 2026, data center operational capacity stood at 136 MW, and we have a contracted capacity of 113 MW scheduled for delivery.

As of September 30, 2026, Sify provides services via 1,264 fiber nodes across the country, a 6% increase over the same quarter last year. A detailed list of our wins is recorded in our press release, now live on our website. Let me briefly sum up the financial performance for Q2 of FY 2026/2027.

Revenue was INR 13,798 million, an increase of 31% over the same quarter last year. Adjusted EBITDA was INR 3,131 million, an increase of 33% over the same quarter last year. Profit for the quarter was INR 40 million. Capital expenditure during the quarter was INR 8,573 million. Cash balance at the end of the quarter was INR 5,868 million. I will now hand over to our Chairman for his closing remarks. Chairman?

Raju Vegesna

Thank you, Vijay Kumar. Sify is well-positioned to support India's digital transformation and the opportunities emerging from an increasingly connected and AI-driven future. As India's digital transformation advances, we remain committed to enabling this journey through our technology capabilities, infrastructure, and services, while creating long-term value for all our stakeholders. I thank you all our stakeholders for their continued trust and confidence as we work towards this future. Thank you for joining us on the call. I now hand over to the operator for the questions. Operator?

Operator

Certainly. Everyone at this time will be conducting a question and answer session. If you have any questions or comments, please press star one on your phone at this time. We do ask that while posing your question, please pick up your handset if you're listening on speakerphone to provide optimum sound quality. Once again, if you have any questions or comments, please press star one on your phone. Please hold while we poll for questions. Thank you. Our first question comes from Greg Burns from Sidoti. Your line is live.

Greg Burns

Good morning. I was just hoping to get an update on the status of the Sify Infinit Spaces IPO, maybe the potential timing for that.

M P Vijay Kumar

Yeah. The bankers are advising us on the right time to do the IPO. We continue to be engaged with the bankers, and we will communicate once the dates are finalized.

Greg Burns

Okay. Is it a market-related issue causing the delay? What are you looking to see in the market to complete the transaction?

M P Vijay Kumar

Yeah. It is not strictly market related. The market in India is pretty good. You just saw the country's largest IPO happening very successfully. The bankers would like to time the issue at the appropriate time. Also we are adequately capitalized for the time being as well.

Greg Burns

Okay. That I guess was my next question. Does this in any way constrict your ability to grow? Do you have adequate access to capital to continue your growth plans at the current trajectory?

M P Vijay Kumar

Yes.

Greg Burns

Okay. The operational capacity, that 136 MW, that is your revenue-generating capacity?

M P Vijay Kumar

You are right.

Greg Burns

What that number is?

M P Vijay Kumar

You are right.

Greg Burns

Okay. What is the total design capacity of your current footprint? Just so we know how much that can expand. The 113 MW that is in backlog, the 113 MW, what is the timeline of bringing that online?

M P Vijay Kumar

Yeah. We will be delivering this beginning this quarter over the next three quarters. The total design capacity, after including the backlog to be delivered, we would be close to about 300 MW.

Greg Burns

Okay, great. As you look at the competitive landscape within the market, obviously, there is a lot of investment going on in the data center space in India. How is pricing when we think about the ROI you are looking to get on these investments? Are you seeing any changes in pricing, your ability to rent out space or any factors that might impact the return on investment you are getting on the spending?

M P Vijay Kumar

Yeah. At this point in time, as far as Sify is concerned, and to my knowledge, as far as the peers are concerned as well, the industry demand is in far excess of the supply which is available. Given this scenario, there is no pressure on pricing. In fact, the pricing is getting better, and the returns are also improving.

Greg Burns

Okay, great. All right. Thank you very much.

M P Vijay Kumar

Thank you.

Operator

Thank you. Your next question is coming from Prateek Singh from IIFL Capital. Your line is live.

Prateek Singh

Hi. Thanks for the opportunity. Just to get some clarity on this 113 MW number. Earlier, when we said that 81 MW was deliverable in FY 2027, that is still on track and that is part of this 113 MW. Is that the correct understanding?

M P Vijay Kumar

You are right, Prateek.

Prateek Singh

Okay. What is the current already commissioned build capacity, which used to be 188 MW for three quarters?

M P Vijay Kumar

Yeah. That is increasing to about 300 MW. That is what is under construction now. This 136 MW plus 113 MW, which is 249 MW, will become revenue generating over the next few quarters.

Prateek Singh

Understood. Regarding the IPO delays, is there any regulation as to one needs to do an IPO within so much so time of the RHP filing in India, or there is no such strict timelines as such, after which we have to restart the process?

M P Vijay Kumar

There is a timeline available, which is up to January end, and beyond that, it is a restart process.

Prateek Singh

Okay. And sir, as you used to mention in your last calls, in the hypothetical scenario of IPO getting delayed further, you will be supported by Kotak. Is that understanding still correct?

M P Vijay Kumar

Correct.

Prateek Singh

Understood. My next line of question is around the digital services business. I think after a long time, we saw this business turn EBITDA positive. Do you think this is something which can sustain, or were there any one-off elements this quarter?

M P Vijay Kumar

It should get better from here. A lot of work has gone in and continues to happen here. The idea is for us to make our digital service entity portfolio of services largely AI-led one. As you know, this technology is scaling well so hopefully, this should be a sustainable performance going forward.

Prateek Singh

Understood. My last question is, based on your current footprint and land bank, what is the maximum design capacity, with ballpark range, you can reach without the need for further acquiring any land? Does it cap out at 300 MW or can we go higher

M P Vijay Kumar

No.

Prateek Singh

on the current land parcel that we have?

M P Vijay Kumar

Yeah. We should be able to do more than a gigawatt with the land bank which we have across seven cities.

Prateek Singh

Okay. Any update on the edge data centers which we alluded to over the last few calls, or is it still too early for that?

M P Vijay Kumar

Two edge data centers have gone live, which is in Lucknow and Mohali. That is Chandigarh. There are other two edge data centers where work is happening as we speak.

Prateek Singh

Thanks. My last question is on the Andhra data center. Is there any progress there, or that is something that we will focus on after our current set of projects on current land parcels?

M P Vijay Kumar

You are right. We will first deliver on our existing commitments but parallelly, we are working on the engineering part for the Visakhapatnam site, and we will take it up at the appropriate time.

Prateek Singh

Thanks. Thank you for answering my questions. All the best.

M P Vijay Kumar

Thanks, Prateek.

Prateek Singh

Thank you.

Operator

Thank you. Your next question is coming from Sourabh Arya from Oaklane. Your line is live.

Sourabh Arya

Yeah. Hi, sir. Am I audible? Hello.

M P Vijay Kumar

You are audible.

Sourabh Arya

Yeah. Hi.

M P Vijay Kumar

You are audible, Sourabh.

Sourabh Arya

First question. Yes, sir. First question is why QoQ there is decline in data center revenue. I think we added 5 MW last quarter, right?

M P Vijay Kumar

Yeah. Last quarter, when you added the 5 MW, it was largely for the enterprise customers. When you do it, there is an installation revenue which you actually get, consequent to which there was an increase. There was also a power revenue, which scaled up in that particular period from the existing customers.

Sourabh Arya

But how do we explain the decline? I meant to say.

M P Vijay Kumar

No, I was talking about why the previous quarter was higher.

Sourabh Arya

No, I see.

M P Vijay Kumar

Yeah. To put it the other way around, the current quarter, we did not have any implementation revenue, unlike the previous quarter. The power consumption revenue was little lower than the last quarter. Power revenue, as you know, is a passthrough. It doesn't impact the margin generation. Am I clear, Sourabh, there?

Operator

Thank you. Your next question is coming from Greg Burns from Sidoti. Your line is live.

Greg Burns

Hi. I guess just to follow up on that last question. It's more of just a timing issue with how the backlog's getting deployed as opposed to maybe a change in the trajectory of the data center business, correct?

M P Vijay Kumar

Yeah. The backlog orders will get delivered beginning this quarter. Over the next three quarters it will get delivered.

Greg Burns

Okay, great. I had a last question about the network services growth this quarter. It was a lot higher than we expected and more than we've seen in recent quarters. Was there anything specifically driving that? Is that a good level to build off of for our models?

M P Vijay Kumar

Yes. As far as the network is concerned, you'd recall that we started building our national long-distance fiber network on our own. Given the hyperscale data center growth happening in the country and the data center interconnect services as well, this business is seeing upside. We'll continue to stay focused on that business growth as well.

Greg Burns

Great. All right. Thank you.

M P Vijay Kumar

Thank you.

Operator

Thank you. Your next question is coming from Sourabh Arya from Oaklane. Your line is live.

Sourabh Arya

Hello. I actually got dropped.

M P Vijay Kumar

Yeah. Hi, Sourabh.

You were an-

You dropped. I was asking you whether I explained to you satisfactorily. You got it?

Sourabh Arya

No. Actually, I got dropped from the call.

M P Vijay Kumar

Okay. I will repeat, Sourabh. I will repeat. Unlike quarter one, this quarter, we did not have any enterprise implementation services income, which typically is a one-time income. That is one reason.

Sourabh Arya

Okay.

M P Vijay Kumar

Second is, in the previous quarter, there was a higher power consumption from the existing customers, and the power revenue was higher. This quarter it was relatively moderated, and hence the power revenue, which is a passthrough, was lower. Those are the two reasons why between the two quarters there is a revenue change.

Sourabh Arya

Okay. But capacity was more in this quarter versus the last quarter.

M P Vijay Kumar

Yeah. Correct.

Sourabh Arya

How should we think about then these capacities panning out in next two quarters? Because you said that most of the additions will happen in the second half.

M P Vijay Kumar

Yeah. In fact, we have communicated that there is 113 MW of contracts, which is capacity, which is scheduled for delivery. It will get delivered beginning this quarter over the next three quarters.

Sourabh Arya

Okay. Perfect. And sir, network business has grown very strongly while the

M P Vijay Kumar

Yeah

Sourabh Arya

margin declined. So how should one read this business in that sense?

M P Vijay Kumar

Yeah.

Sourabh Arya

In past you have guided it will grow. Yeah.

M P Vijay Kumar

Yeah. Network business should continue to see some bit of growth, corresponding to the data center growth as well. Because as the hyperscale data centers grow in India, the network connectivity between the data centers and for enterprises to connect to those data centers, that business will also see growth. And as I mentioned during my address, the network expansion which is happening is largely now for enabling AI workloads to be carried across the length and breadth of the country. And that's one of the reasons why we are seeing growth.

Sourabh Arya

When India's capacity moves from 1.5 GW-10 GW, that is what everybody is saying for next five years.

M P Vijay Kumar

Correct.

Sourabh Arya

Does it mean network business can grow in that line?

M P Vijay Kumar

Yes.

Sourabh Arya

Can it become 4x-5x?

M P Vijay Kumar

I'm not too sure about 4x-5x. Volume wise, probably yes, but not revenue wise, because the unit economics of that business is different.

Sourabh Arya

Okay. There is a pricing pressure always in this business.

M P Vijay Kumar

It's not pricing pressure, it's inherent for that nature of business because as you scale the unit economics, the costs are significantly lower.

Sourabh Arya

But can you put some context here if industry is growing from 1.5 GW-10 GW, what does it mean for network opportunity in terms of revenue?

M P Vijay Kumar

There are multiple legs of a network. One is the subsea cables, which come here because most of the data center capacity is for serving the global workloads which are there. There will be a subsea revenue. We don't participate in the subsea revenue. Then connectivity between the data centers in India. That business will see some growth for sure.

Sourabh Arya

Okay. I think then maybe the better question would be, among your three businesses, is it fair to say data center will grow highest and then network and then digital? Do you expect in some other way around?

M P Vijay Kumar

I don't want to make forward-looking, but if you look at the trend over the last two years and the way we have deployed capital, that's a reasonable conclusion you can arrive at. But there are businesses like the digital services, which has the potential to scale bigger. But let's wait and see as to when that will start delivering.

Sourabh Arya

Okay, perfect, sir. Thank you. Thank you very much.

M P Vijay Kumar

Okay. Thank you, Sourabh.

Sourabh Arya

All the best.

M P Vijay Kumar

Thank you.

Operator

Thank you. Your next question is coming from Prateek Singh from IIFL Capital. Your line is live.

Prateek Singh

Hi. Thanks for the opportunity again. Three questions. First, what is the update on the Vizag cable landing station? Has work started there or it is something which will make sense?

M P Vijay Kumar

Okay. The Vizag cable landing station, we have got the DoT approval now, and we will start work on the same.

Prateek Singh

Okay. Just to understand a bit more about the network services business, it is something where there would be multiple peers and competitors as well, right? Who can-

M P Vijay Kumar

Yeah

Prateek Singh

take part in the growing demand.

M P Vijay Kumar

Yeah. There are good peers. There are some four or five good peers who are there, and peers playing in different-

Prateek Singh

Understood.

M P Vijay Kumar

Yeah.

Prateek Singh

On the CapEx front, possible to quantify on the CapEx front on the first half spend or maybe this quarter's spend, how much is going into network and how much is going into digital?

M P Vijay Kumar

No, at this point of time, substantial amount of CapEx is on the data center. Then on the network side, probably we are about, 80:20 ratio.

Prateek Singh

How does it work? I mean, to satisfy more network demand, is it like we are sitting on capacity and we do not need to do CapEx for that? Sorry if I do not understand the business really well on the network side. How does it work?

M P Vijay Kumar

Yeah. On network side, we have a model of a satellite delivery of services. Having said that, we will increase our spend on the network side over time. We currently are focused on delivering our data center capacity, but we will continue to invest on network too, and you will see spend happening on that in due course.

Prateek Singh

Thanks. My last question is, this 113 MW is entirely in Rabale? If yes, which towers are they?

M P Vijay Kumar

It is in Rabale and in Noida. There is small capacity in Chennai as well.

Prateek Singh

Understood. Thanks a lot again.

M P Vijay Kumar

Sure. Okay. Thank you, Prateek.

Operator

Thank you. Once again, everyone, if you have any questions or comments, please press star then one on your phone. Please hold while we poll for questions. Thank you. That concludes our Q&A session. I will now hand the conference back to Raju Vegesna for closing remarks. Please go ahead.

Raju Vegesna

Thank you. Thank you for your time on this call. Have a great day. Thank you.

Operator

Thank you. Everyone, this concludes today's event. You may disconnect at this time, and have a wonderful day. Thank you for your participation.

Financials INR · E = consensus estimate · column links open the source filing

Revenue and net income

FY2023FY2024FY2025FY2026
Revenue $33.40B $35.63B $39.89B $44.88B
Revenue Growth — +6.7% +11.9% +12.5%
Gross Profit $9.20B $13.26B $14.97B $18.03B
Gross Margin 27.5% 37.2% 37.5% 40.2%
EBITDA $6.14B $7.17B $7.89B $10.29B
EBITDA Margin 18.4% 20.1% 19.8% 22.9%
Net Income $674.00M $169.00M -$785.00M -$1.37B
Net Margin 2.0% 0.5% -2.0% -3.0%
Diluted EPS $21.78 $5.46 -$12.60 -$18.84
EPS Growth -46.1% -74.9% -330.8% +49.5%
Operating Cash Flow $8.11B $5.94B $8.65B $7.18B
CapEx -$12.79B -$12.38B -$12.32B -$12.89B
Free Cash Flow -$4.68B -$6.44B -$3.67B -$5.71B
Cash $2.45B $3.54B $43.16B $42.10B
Total Debt $2.45B $3.53B $43.62B $42.51B
Enterprise Value $38.15M $31.62M $761.51M $1.34B

Ratios · FY2026

Valuation
P/E-63.46×
P/S1.93×
P/B4.57×
P/FCF-15.16×
EV/Sales2.79×
EV/EBITDA12.15×
FCF Yield-6.6%
Shareholder Yield-10.3%
Profitability
Operating Margin6.7%
Net Profit Margin-3.0%
Return on Equity-7.0%
Return on Invested Capital4.0%
Return on Assets3.5%
Health
Current Ratio0.74
Quick Ratio0.50
Debt / Equity2.25
Debt Ratio0.47
Net Debt$38.41B
Payout Ratio0.0%
Growth
Revenue 1Y Growth12.5%
Revenue 3Y CAGR10.3%
Diluted EPS 1Y Growth49.5%

Holders 48 institutions on file

InstitutionShares% of Shares OutValueChange QoQFiled
Theleme Partners Llp 1.28M 1.77% $17.04M 0.00% Nov 13, 2026
Cable Car Capital, Lp 1.23M 1.70% $16.39M 0.00% Nov 16, 2026
Acadian Asset Management Llc 102.53K 0.14% $1.37M -36.89% Nov 9, 2026
Liontrust Investment Partners Llp 77.75K 0.11% $1.04M -42.45% Nov 18, 2026
Allianz Asset Management Gmbh 75.99K 0.10% $1.01M 0.00% Nov 16, 2026
Envestnet Asset Management Inc 59.33K 0.08% $790.86K +5.18% Nov 16, 2026
Blackrock, Inc. 49.21K 0.07% $655.93K +6.27% Nov 13, 2026
Renaissance Technologies Llc 33.11K 0.05% $441.36K -37.41% Nov 12, 2026
Sbi Securities Co., Ltd. 26.39K 0.04% $351.74K -7.03% Oct 22, 2026
Tower Research Capital Llc (trc) 13.40K 0.02% $178.57K — Nov 16, 2026
Nomura Asset Management International Inc. 13.00K 0.02% $173.29K 0.00% Nov 16, 2026
Henry James International Management Inc. 11.35K 0.02% $151.23K -0.67% Oct 14, 2026
Citadel Advisors Llc 10.88K 0.02% $144.96K -18.73% Nov 16, 2026
Hennion & Walsh Asset Management, Inc. 10.64K 0.01% $141.89K — Oct 13, 2026
Ballentine Partners, Llc 10.04K 0.01% $133.83K — Nov 13, 2026

Insider and Congress trading All insider trades →

Insider trades · SEC Form 4

Latest 15 filings: 0 sales ($0) · 0 buys ($0)
DateInsiderTypeSharesPriceValueOwned afterFiling
Mar 18, 2026
filed Mar 26
Arun Seth
Director
— 0 — — 0 SEC ↗
Mar 18, 2026
filed Mar 25
Thomas Michael Bradicich
Director
— 0 — — 0 SEC ↗
Mar 18, 2026
filed Mar 18
Ananta Kotiraju Vegesna
CEO, Chairman & Md
— 0 — — 295.46M SEC ↗
Mar 18, 2026
filed Mar 18
Ananta Kotiraju Vegesna
CEO, Chairman & Md
— 0 — — 34.34M SEC ↗
Mar 18, 2026
filed Mar 18
Ananta Kotiraju Vegesna
CEO, Chairman & Md
— 0 — — 32.86M SEC ↗
Mar 18, 2026
filed Mar 18
Ananta Kotiraju Vegesna
CEO, Chairman & Md
— 0 — — 1.47M SEC ↗
Mar 18, 2026
filed Mar 18
Bala Saraswathi Vegesna
Director
— 0 — — 0 SEC ↗
Mar 18, 2026
filed Mar 18
Padmaja Chunduru
Director
— 0 — — 0 SEC ↗
Mar 18, 2026
filed Mar 18
Raju Paravasa Raju Vijay Kumar Muthu
Executive Director And CFO
— 0 — — 0 SEC ↗
Mar 18, 2026
filed Mar 18
Ram Sewak Sharma
Director
— 0 — — 0 SEC ↗

Historical data USD · newest first

DateOpenHighLowCloseChangeVolume