USMarketsToday.com
TEC

Teck Resources Limited

TECK · NYSE ·
$51.55+$1.08 ↗ 2.14%
At close: Nov 25, 4:00:03 PM EST
$51.50-$0.05 ↘ 0.10%
After-hours: Nov 25, 7:58:06 PM EST
Volume
Market Cap$24.92B
Open$48.73
Trailing P/E9.43
Day Range$48.29–$51.73
Dividend Yield0.68%
52W Range$42.54–$72.56
EPS$3.00
Volume4.00M
Avg Volume2.91M
50-Day Avg$62.63
200-Day Avg$60.83
Why is TECK moving?

Teck Resources rose about 2% as strong copper prices, highlighted in miners' recent quarterly results alongside new capacity plans, boosted sentiment toward copper-focused producers.

What analysts say

Updated 6h ago

Wall Street sentiment on Teck Resources (TECK) is constructive, with a Strong Buy consensus from 4 covering analysts: 3 Buy (75%), 1 Neutral (25%), and 0 Sell (0%). The average and median price target is $67.50, with a fairly tight range from $63 (JP Morgan) to $72 (StoneX). The most recent actions came on Oct 30, when StoneX reiterated Buy and raised its target to $72 from $67, and JP Morgan held its Neutral rating but lifted its target sharply to $63 from $47. That target had been raised steadily from $41 in October 2025. Deutsche Bank is also at Buy with a $68 target, after upgrading from Hold in September 2025. Sentiment is being shaped by strong copper-driven earnings and the pending Anglo Teck merger, which faces regulatory scrutiny in China. Near-term headwinds include copper price volatility and a labor dispute at a BC mine.

Bull vs Bear

Every version →
▲ Bull caseRecord Q3 2026 profit, repeated earnings beats, lowered copper and zinc cash cost guidance and upward FY2026 estimate revisions point to strong momentum. Zacks ranks the stock Buy, with consensus EPS rising to $4.45, suggesting earnings strength can carry into the coming year.[3][4][8]
▼ Bear caseEarnings are forecast to fall about 15% annually over three years, with revenue slightly declining and ROE only 8%. Analysts also project next-year EPS dropping about $1.00, implying current record profits are a peak well ahead of the metals and mining sector's growth.[1][9]

Notable price movement

All 18 moves →
Nov 259:24 PM ET
$51.55 ↗ 2.14% at Close·$51.50 ↘ 0.10% After Hours
Teck Resources shares closed higher, rebounding about 2% to $51.55 on the NYSE after a heavy sell-off, even as copper fell into bear-market territory (LME down 1.5% to $11,649.50, more than 20% below September's record). The metal has been pressured by an AI/tech rout, Fed-hike expectations and renewed US tariff worries, though tight physical supply and Deutsche Bank's view of a 2027 recovery offer some support. Teck is down roughly 26% since Sept. 30, while its Q3 adjusted EBITDA nearly doubled to C$2.3 billion and the Anglo American merger is described as on track. Analyst targets (about $61–$75 average) remain well above the current price. A strike at Highland Valley Copper and China regulatory approval risk remain overhangs. Shares ended with a wide intraday range ($48.29–$51.73) on above-average volume and were little changed after hours.
$50.47 ↘ 3.50% at Close·$50.47 ↗ 0.01% After Hours
Teck Resources shares closed lower as copper gave back Monday's Nvidia-driven rebound, with London copper falling to a 13-month low near $11,800/ton on AI-demand doubts, a strong dollar, expected Fed hikes and fresh US tariff announcements. Copper miners such as Freeport-McMoRan and First Quantum also fell, and the TSX closed lower on basic materials weakness. Teck fell 3.5% to $50.47 on above-average volume, with little change after hours. It is roughly 27% below its September high. Investor focus includes the pending Anglo American merger, the Highland Valley strike and a recent director purchase near $50.55. Analyst targets have barely moved, with MarketBeat's consensus at about $75 and a Hold rating.
$52.30 ↗ 7.84% at Close·$52.89 ↗ 1.13% After Hours
Teck Resources shares rebounded as copper miners rallied after Nvidia reinstated Jensen Huang as CEO, reviving the AI trade that had dragged copper into a bear market last week. Copper rose nearly 3% on the day, and BHP and Rio Tinto also gained. The bounce follows Friday's roughly 6% drop, when the stock closed at $48.48 with no company-specific news. A director bought 5,500 shares at about $50.55 on Nov. 20, and UBS has argued copper's dip is a buying opportunity, forecasting $14,500/t by March 2027. Copper remains well below its September peak, and analysts are still split on whether the selloff has bottomed. Shares closed up 7.84% at $52.30, volume was above average, and they edged higher after hours.
$51.58 ↘ 1.62% at Close·$51.28 ↘ 0.58% After Hours
Teck Resources is caught in a sharp copper-sector pullback, with the metal near seven-month lows after Wednesday's roughly 6% rout as AI and US-tariff trades unwound, the dollar strengthened and Chinese demand worries grew. Thursday's broad risk-off tone added pressure: the S&P 500 fell about 2% to fresh seven-month lows and all 11 sectors declined. Sentiment was also weighed by a Tudor 13F showing a full exit from Teck in Q3 and Stan Druckenmiller turning bearish on copper. Offsetting that, Chinese physical premiums hit records, and analysts see the move as macro-driven rather than a sign of demand collapse. Teck shares closed down about 1.6% and slipped a further 0.6% after hours. Analyst consensus remains Hold with a $75.25 average target, and Anglo American's pending merger with Teck remains in the background.
$60.19 ↘ 1.63% at Close·$60.50 ↗ 0.52% After Hours
Teck Resources shares closed lower as copper extended a fifth straight weekly decline, hitting near four-month lows on AI-investment worries after Nvidia CEO Jensen Huang's resignation and a hawkish Fed outlook. Company-specific pressure also came from the Highland Valley Copper strike, now in its third week, which spread to Vancouver Wharves, where the terminal operator sued the union after longshore workers refused to handle mine material. Teck says the mine is running at reduced capacity. Teck's solid Q3 results, lower 2026 cost guidance and pending Anglo American merger remain in the background. Shares closed down 1.63% at $60.19 and edged up slightly after hours.
$61.19 ↘ 3.90% at Close·$61.81 ↗ 1.01% After Hours
Teck Resources shares fell as copper slid to four-month lows, with LME copper down about 1.5% near $13,610/t, as hawkish Fed signals (a possible 50bp December hike), a stronger dollar and Nvidia CEO Jensen Huang's resignation hit AI-demand sentiment. Materials was among the weakest S&P 500 sectors (about -1.5%), and gold also dropped about 3%. Company-specific backdrop includes a strong Q3 (adjusted EBITDA +97%, lowered 2026 cost guidance), the pending Anglo American merger and the ongoing Highland Valley Copper strike, which began Oct. 24. Analyst consensus is Hold with a $75.25 average target. Shares closed down 3.90% at $61.19 and were up about 1% after hours.
$63.67 ↗ 1.30% at Close·$64.00 ↗ 0.52% After Hours
Teck Resources shares closed higher as copper miners recovered alongside a rebound in AI-linked risk appetite and persistent physical copper tightness in China (record Yangshan premium, depleted…
Why TECK moved on Nov 11 →
$62.85 ↘ 2.81% at Close·$62.85 ↗ 0.00% After Hours
Teck Resources shares gave back part of Monday's sharp copper-led rally, as hot US inflation data and hawkish Fed signals (Waller floating a possible 50 bp hike) lifted yields and the dollar and hit…
Why TECK moved on Nov 10 →
$64.67 ↗ 6.96% at Close·$64.67 ↗ 0.00% After Hours
Teck Resources shares jumped as copper miners rebounded in a broad market rally, with copper recovering part of last week's steepest weekly drop since March on tight physical supply in China (record…
Why TECK moved on Nov 9 →
$60.46 ↗ 0.92% at Close·$61.29 ↗ 1.37% After Hours
Teck Resources shares closed modestly higher, edging up after Thursday's roughly 7% slide, even as copper fell to its lowest since July on fears that a Democratic sweep of Congress could slow AI…
Why TECK moved on Nov 6 →
$59.91 ↘ 7.06% at Close·$60.00 ↗ 0.15% After Hours
Teck Resources shares tumbled as a tech- and AI-led rout hit Wall Street (S&P 500 -4.4%, Nasdaq -5.5%) and copper slid to a three-month low, with COMEX copper down about 2.4% and LME copper near…
Why TECK moved on Nov 5 →
$64.46 ↗ 4.29% at Close·$64.46 ↗ 0.00% After Hours
Teck Resources shares closed higher as a broad post-midterm relief rally lifted equities and a weaker dollar supported metals, with Toronto's materials sector leading gains and copper rebounding from…
Why TECK moved on Nov 4 →
$61.81 ↘ 1.48% at Close·$61.71 ↘ 0.17% After Hours
Teck Resources shares closed lower as copper slid to an 11-week low and materials lagged, with the S&P 500 materials sector down about 2% as a tech selloff and midterm-election uncertainty hit risk…
Why TECK moved on Nov 3 →
$62.74 ↗ 3.51% at Close·$62.74 ↗ 0.00% After Hours
Teck Resources shares closed up about 3.5% as copper miners rebounded from Friday's AI-driven selloff, with falling oil prices on US-Iran diplomacy and tight physical copper supply helping the group.
Why TECK moved on Nov 2 →
$60.61 ↘ 4.88% at Close·$59.78 ↘ 1.37% After Hours
Teck Resources' post-earnings reaction was dominated by a risk-off, AI-driven selloff and softer copper rather than its results.
Why TECK moved on Oct 30 →
$63.72 ↗ 1.08% at Close·$63.72 ↗ 0.00% After Hours
Teck Resources closed higher after a third-quarter beat.
Why TECK moved on Oct 29 →
$63.04 ↗ 1.22% at Close·$63.04 ↗ 0.00% After Hours
Teck Resources shares closed higher and were little changed after hours, as investors positioned ahead of Thursday's pre-market third-quarter earnings.
Why TECK moved on Oct 28 →
$62.28 ↗ 3.35% at Close·$62.28 ↗ 0.00% After Hours
Teck Resources shares closed higher as copper rebounded on AI-driven sentiment and tight supply, even with the Highland Valley Copper strike unresolved.
Why TECK moved on Oct 27 →
Largest moves in the past year from daily prices
Nov 23, 2026
Big RallyGap Up 9.1%
TECK gained 7.8% to close at $52.30, opening 9.1% above the prior close. Intraday range of $1.69 ($51.20 – $52.89) spanned 3.3% in a volatile session.
+7.8%
Nov 5, 2026
Sharp Drop
TECK fell 7.1% to close at $59.91. Intraday range of $5.47 ($59.85 – $65.32) spanned 9.1% in a volatile session. Volume reached 4.90M shares (1.8× the 20-day average). Closed near the day's low as sellers pressed into the close.
-7.1%
Aug 4, 2026
Big RallyGap Up 5.7%
TECK gained 7.5% to close at $64.74, opening 5.7% above the prior close. Intraday range of $2.28 ($63.24 – $65.52) spanned 3.6% in a volatile session.
+7.5%
Jul 30, 2026
Big RallyGap Up 6.9%
TECK gained 8.7% to close at $62.49, opening 6.9% above the prior close. Intraday range of $2.32 ($60.28 – $62.60) spanned 3.8% in a volatile session. Closed near the session high, with buyers in control into the close.
+8.7%
Jun 5, 2026
Sharp DropGap Down 3.4%
TECK fell 8.3% to close at $61.67, opening 3.4% below the prior close. Intraday range of $4.07 ($61.05 – $65.12) spanned 6.7% in a volatile session. Closed near the day's low as sellers pressed into the close.
-8.3%
May 15, 2026
Sharp DropGap Down 7.3%
TECK fell 6.2% to close at $61.35, opening 7.3% below the prior close. Recovered from the lows into the upper part of the range as dip buyers stepped in.
-6.2%
May 6, 2026
Big RallyGap Up 7.8%
TECK gained 7.3% to close at $62.01, opening 7.8% above the prior close. Volume reached 4.89M shares (1.6× the 20-day average).
+7.3%
Apr 8, 2026
Big RallyGap Up 9.0%
TECK gained 6.0% to close at $55.69, opening 9.0% above the prior close. Intraday range of $2.20 ($55.22 – $57.42) spanned 4.0% in a volatile session.
+6.0%
Mar 31, 2026
Big RallyGap Up 3.6%
TECK gained 7.1% to close at $51.75, opening 3.6% above the prior close. Intraday range of $2.10 ($49.75 – $51.85) spanned 4.2% in a volatile session. Closed near the session high, with buyers in control into the close.
+7.1%
Mar 19, 2026
Gap Down 8.8%
TECK fell 3.1% to close at $47.36, opening 8.8% below the prior close. Intraday range of $3.40 ($44.55 – $47.95) spanned 7.6% in a volatile session. Volume reached 8.01M shares (1.8× the 20-day average). Recovered from the lows into the upper part of the range as dip buyers stepped in.
-3.1%
Feb 3, 2026
Big RallyGap Up 5.5%
TECK gained 8.6% to close at $59.24, opening 5.5% above the prior close. Intraday range of $2.50 ($57.21 – $59.71) spanned 4.4% in a volatile session. Volume reached 7.31M shares (1.5× the 20-day average). Closed near the session high, with buyers in control into the close.
+8.6%
Jan 30, 2026
Sharp DropGap Down 4.4%
TECK fell 7.8% to close at $53.76, opening 4.4% below the prior close. Intraday range of $2.92 ($53.27 – $56.19) spanned 5.5% in a volatile session. Closed near the day's low as sellers pressed into the close.
-7.8%

Latest news

Price forecast 12-month price targets from 4 analysts

Price, past year Buy target Hold target Sell target Consensus high · average · low
Average price target
$67.50
▲ 30.9% upside
High$72.00 +39.7%
Median$67.50 +30.9%
Low$63.00 +22.2%
Current price$51.55

Change is measured from the current price. Targets are analysts’ 12-month views, not facts.

Analyst rating changes 4 analysts Forecast & rating history →

Recent rating actions

DateFirmAnalystActionRatingPrice Target
Oct 30 JP Morgan Bill Peterson Maintains Neutral $47 → $63
Oct 30 StoneX Nathan P. Martin Maintains Buy $67 → $72
Jul 28 JP Morgan Bill Peterson Maintains Neutral $46 → $47
Jul 9 JP Morgan Bill Peterson Maintains Neutral $48 → $46
Jul 2 Deutsche Bank Liam Fitzpatrick Maintains Buy $64 → $68
May 1 JP Morgan Bill Peterson Maintains Neutral $45 → $48
Feb 23 Benchmark Nathan P. Martin Maintains Buy $48 → $67
Dec 5 JP Morgan Bill Peterson Maintains Neutral $43 → $51
Oct 9 JP Morgan Bill Peterson Maintains Neutral $41 → $43
Sep 8 Deutsche Bank Abhi Agarwal Upgrades Hold → Buy $42

Research

Independent reports

Teck Earnings: Firm Sees Stronger Prices as It Awaits China Approval for Anglo Teck Merger
Morningstar Equity Research·Nov 1, 2026 bearish

Morningstar holds its C$57 fair value and says Teck trades about 50% above intrinsic value; stronger near-term earnings and a likely merger do not outweigh copper prices well above its assumed long-run level.

Mining Stocks: Raising Fair Values as Copper Hits Historic Highs
Morningstar Equity Research·Oct 11, 2026 bearish

Morningstar raises Teck’s fair value 13% to US$40.50 on stronger copper prices and a higher valuation multiple, but says elevated copper optimism leaves copper-exposed miners, including Teck, substantially overvalued.

Teck's FVE Raised but Shares Overvalued Due to Strong Copper Price and Pending Anglo American Merger
Morningstar Equity Research·Oct 8, 2026 bearish

Morningstar’s Teck company report raises fair value but still judges the shares overvalued, citing the strong copper price and pending Anglo American merger; it also flags potential weaker demand growth and lower commodity prices as China shifts from investment toward household consumption.

Teck Shares Driven by the Booming Copper Price and Its Upcoming Merger With Anglo American
Morningstar Equity Research·Jul 23, 2026 bearish

Morningstar identifies high copper prices and the proposed Anglo American merger as key drivers of Teck’s shares, while warning that China’s shift away from investment could weaken demand for its major commodities and pressure prices.

Mining Stocks: Mineral Resources Is the Best Value as We Update Our Assumed Prices
Morningstar Equity Research·Jul 13, 2026 bearish

Morningstar lifts Teck’s fair value estimate 3% to US$36 on higher zinc prices and currency effects, but says Teck and Anglo are roughly 60% overvalued amid strong copper-demand optimism.

Teck Shares Expensive as the Booming Copper Price Drives Overvaluation of Anglo American Shares
Morningstar Equity Research·Apr 19, 2026 bearish

Morningstar’s note frames Teck shares as expensive amid the copper-price boom and highlights the risk that China’s rebalancing toward household consumption could weaken demand growth and lower prices for its key commodities.

Analyst notes

Teck Earnings: Stronger Copper Prices and Volumes Drive an Impressive Result
Morningstar · Jon Mills · Jul 24, 2026
Base Metals Miners: Copper Bullishness Sees Little Value on Offer as We Update our Assumed Prices
Morningstar · Jon Mills · Jul 22, 2026
Teck Earnings: Benefitting From Favorable Copper and Zinc Prices
Morningstar · Jon Mills · Apr 30, 2026
Iron Ore Miners: Mineral Resources the Cheapest After Updating Our Commodity Price Assumptions
Morningstar · Jon Mills · Apr 20, 2026
Teck Shares Expensive as the Booming Copper Price Drives Overvaluation of Anglo American Shares
Morningstar · Jon Mills · Apr 20, 2026
Teck Earnings: Copper Bull Market Drives a Very Strong Result
Morningstar · Jon Mills · Apr 8, 2026
Iron Ore Miner Coverage Fairly Valued to Overvalued After Updating Our Commodity Price Assumptions
Morningstar · Jon Mills · Jan 27, 2026
Raising Teck's Fair Value Estimate Due to Stronger Copper and Zinc Prices
Morningstar · Jon Mills · Jan 16, 2026
Corporate Action: Anglo American and Teck Shareholders Vote in Favor of Merger
Morningstar · Jon Mills · Jan 6, 2026
Teck Earnings: Higher on Improved Copper and Zinc Prices
Morningstar · Jon Mills · Oct 29, 2025

Earnings Earnings history →

Next report · Q4 FY2026

DateFeb 18, 2027
EPS Est.$0.74
Revenue Est.$2.43B
Avg 1-Day Move±2.1%

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
Q3 FY2026 Oct 29, 2026 $1.00 $1.31 +31.0% $3.04B $3.17B +4.3% +1.1%
Q2 FY2026 Jul 23, 2026 $0.78 $1.35 +73.1% $2.38B $2.54B +6.5% +4.6%
Q1 FY2026 Apr 23, 2026 $0.76 $1.25 +64.5% $2.32B $2.83B +21.7% +2.5%
Q4 FY2025 Feb 19, 2026 $0.59 $0.98 +66.1% $2.21B $2.23B +1.0% -0.1%
Q3 FY2025 Oct 22, 2025 $0.39 $0.55 +41.0% $2.07B $2.43B +17.5% -1.6%
Q2 FY2025 Jul 24, 2025 $0.20 $0.27 +35.0% $1.59B $1.49B -6.7% -9.0%
Q1 FY2025 Apr 24, 2025 $0.25 $0.42 +68.0% $1.50B $1.61B +7.5% +3.9%
Q4 FY2024 Feb 20, 2025 $0.22 $0.33 +50.0% $1.82B $1.94B +6.6% +1.5%

Latest earnings analysis · Q3 FY2026 · Oct 29, 2026

Teck's Q3 2026 cash flow from operations rose to $1.6 billion and adjusted EBITDA doubled year over year to $2.3 billion, helped by higher production, lower unit costs, and another record quarterly average copper price.
Net cash increased by $655 million in the quarter and $1.7 billion over nine months. Liquidity was almost $11 billion at September 30, including $6.7 billion of cash.
The merger with Anglo American is progressing as planned, with final approval still pending from China's antitrust regulator. Expected completion remains within 12 to 18 months of the September 2025 announcement.
Severe weather hit the copper operations, including flooding, snow and wind-related power outages at QB and drought and wildfires at Highland Valley. QB's annual copper production guidance is unchanged, and its final planned 2026 shutdown was completed in September.
Full-year 2026 net cash unit cost guidance was lowered at the midpoint by 13 US cents per pound for copper and 35 US cents per pound for zinc, mainly on strong by-product prices. Production and capital expenditure guidance are unchanged. Highland Valley's mine life extension is over 25% complete and will support operations through 2046 at about 132,000 tons per year.

Earnings call · Q3 FY2026 · Oct 29, 2026 · 11:00 AM EDT

Full transcript →
≈ 47:03 · 85 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Operator

Ladies and gentlemen, thank you for standing by. Welcome to Teck's Third Quarter 2026 Earnings Release Conference Call. At this time, all participants are in listen-only mode. Later, we will conduct a question and answer session. To join the question queue, please press star then one on your touchtone phone. Should anyone need assistance during the conference call, they may signal an operator by pressing star then zero on their telephone. This conference call is being recorded on Thursday, October 29, 2026. I would now like to turn the conference over to Edwin Shadeo, Vice President, Investor Relations and Treasurer. Please go ahead.

Edwin Shadeo

Thank you, operator. Good morning, everyone, and thank you for joining us for Teck's Third Quarter 2026 Conference Call. Today's call contains forward-looking statements. Actual results may vary due to various risks and uncertainties. Teck does not assume the obligation to update any forward-looking statements. Please refer to slide two for the assumptions underlying our forward-looking statements. We will reference non-GAAP measures throughout this presentation. Explanations and reconciliations are in our MD&A and the latest press release on our website. On today's call, Jonathan Price, our CEO, will provide highlights for the third quarter of 2026. Crystal Prystai, our CFO, will follow with further details on our operational performance and financials for the quarter. Jonathan will then wrap up with closing remarks and an opportunity for Q&A. Over to you, Jonathan.

Jonathan Price

Thanks, Edwin, and good morning, everyone. We've delivered another quarter of significant earnings growth and robust cash generation, underlying the strength of our business. In the third quarter of 2026, we increased production, demonstrated resilience in execution, and benefited from another record quarterly average copper price. We significantly increased our cash flow from operations to CAD 1.6 billion, and doubled our adjusted EBITDA to CAD 2.3 billion compared to the same period last year. We continue to strengthen our balance sheet quarter by quarter, driven by significant cash flows from operations. We've increased our net cash position by CAD 655 million in the quarter, and by CAD 1.7 billion over the first nine months of the year. Our liquidity is almost CAD 11 billion as of September 30, including CAD 6.7 billion of cash.

Our focus remains on our key near-term priorities to drive shareholder value, and we are making continued progress against them. Our merger of equals with Anglo American to form a copper-focused global metals and minerals champion continues to progress as planned, and integration planning is advancing. We continue to engage constructively with China's antitrust regulator to obtain the final outstanding regulatory approval. Expected completion within 12-18 months of our September 2025 announcement remains unchanged. In parallel, we remain focused on disciplined execution, particularly on safe and reliable operational performance and delivery against our commitments. In the third quarter of 2026, our financial performance was strong despite a challenging operating environment at several of our sites. Our teams dealt with a wide range of severe weather events across our copper business.

Extreme weather conditions at Carmen de Andacollo and [Quebrada Blanca], with torrential rain and flooding and more than three times the area's historical annual average rainfall in a short period of time. Heavy rain, snow, and sustained high winds at QB operations in one of the driest regions in the world, and severe drought conditions and an extended wildfire season at Highland Valley. Throughout these events, the safety of our people remained the priority. While simultaneously dealing with multiple severe weather events and the resulting impacts on mining conditions, we safely recovered our operations in the quarter. Across our copper business, we increased production, lowered unit costs, and delivered strong margin growth, and our zinc business continued to contribute meaningful cash flow. We've lowered our 2026 annual cash unit cost guidance in both our copper and zinc segments, primarily as a result of strong by-product pricing year-to-date.

We lowered the midpoint of our net cash unit cost guidance by $0.13 per pound for copper and by $.035 per pound for zinc, which also reflects our strong operating discipline. Our 2026 annual production and capital expenditure guidance is unchanged. We continue to advance the work necessary to realize the full value of QB, which will ultimately come from stable and efficient operations and continuous improvement. QB's strong operating performance in the first half of the year continued in July, but heavy snowfall and high winds in August caused intermittent power outages, resulting in shutdowns of the concentrator, dewatering systems, and other critical equipment. Flooding of active mining areas reduced access to high-grade ore and impacted mine productivity into September. QB successfully completed its final planned shutdown for 2026 in September, supporting continued operational performance for the remainder of the year.

Despite the weather disruptions in the third quarter, QB's annual copper production guidance is unchanged. QB's resilience to severe weather events will continue to be enhanced through the remainder of 2026 and into 2027 as the mine matures and more mining phases are opened. QB's Tailings Management Facility, or TMF, development work continues to progress, and we commenced construction of Rock Bench 6 in the quarter, which I will cover in more detail in a later slide. The third quarter of 2026 was our fourth consecutive quarter with no TMF-related downtime in the concentrator, supporting improved asset utilization and operational consistency. We're advancing construction of the mine life extension at Highland Valley Copper, which will sustain operations at this important asset through to 2046. And supports average annual copper production of approximately 132,000 tons. Construction is now more than 25% complete.

At the same time, we're continuing to progress the copper growth project in our portfolio towards sanction readiness to generate shareholder value and strengthen optionality for future development opportunities. And we are pleased that San Nicolás received its main environmental impact assessment permits in July. Overall, our third quarter 2026 results showcase the underlying strength of our business and demonstrate our strong foundation as we advance towards completion of our merger with Anglo American. I'll now provide an update on each of our key near-term priorities, starting with the merger with Anglo American on slide five. The merger is progressing as planned towards completion. The parties are working collaboratively towards securing the remaining required regulatory approval, and we are continuing to engage constructively with SAMR in China and are responding to their information requests.

Integration planning continues to advance with teams focused on day one readiness, maintaining safe and reliable operations, and ensuring business continuity while preparing the combined company to realize the strategic and operational benefits of the transaction. Significant progress has been made, including establishing the future executive leadership team for Anglo Teck, defining the fundamentals of its operating model and advancing integration plans. On July 30, we announced Anglo Teck's future executive leadership team, which brings together a highly experienced and complementary set of leaders from both companies. The leadership who will be responsible for Anglo Teck's mining and production businesses across Brazil, Chile, Peru, North America, and South Africa was also confirmed. These appointments will take effect immediately upon completion of the merger. During the quarter, S&P and the TSX announced that certain foreign issuers with a strong Canadian presence will be eligible for full inclusion in Canadian indices.

We expect Anglo Teck will be an important part of the Canadian investment landscape and, if confirmed, the ability to achieve full inclusion in Canadian indices is a significant milestone, enabled by having headquarters in Vancouver and expected listing on the Toronto Stock Exchange and significant operations and ongoing investment in Canada. The transaction continued to progress as planned and steady execution against the merger roadmap supports the expected close within 12-18 months of our September 2025 announcement, which remains unchanged. We expect completion of the merger to be approximately 11 trading days from fulfillment or waiver of the remaining applicable precedent conditions. Turning to our safe and reliable operational performance and starting with safety and sustainability on slide six.

In the third quarter of 2026, our quarterly high potential incident frequency rate improved to 0.06, equivalent to our 2025 annual rate, which was tied for Teck's best ever annual performance. The Highland Valley Copper Mine Life Extension Project has a strong safety record, having achieved over 1.5 million hours worked without a high potential incident or lost time injury. I am personally very proud and impressed that during the severe weather events, our team responded quickly and safely with no high-risk incidents reported. Our teams not only kept people safe, maintained essential services, and restored our operations as conditions allowed, they also assisted regional recovery efforts by providing equipment and operators to help clear roads and restore access in affected communities. I would like to take a moment to acknowledge that a fatality occurred on October 27 at Antamina, in which Teck holds a non-controlling interest.

We are deeply saddened by this event and offer our condolences to the family, friends and colleagues of the deceased. Teck is supporting the organization and learnings from the investigation will be shared across our company and across the sector so we can learn together to improve the safety of our people. In sustainability, we announced that Teck had been named to the Forbes World's Top Companies for Women 2026 list for the second time on October 7. This list recognizes organizations that are highly rated by female employees and demonstrate a commitment to advancing women in the workplace. Slide seven summarizes our operational results for the third quarter of 2026. Overall, we sustained our operating performance while dealing with severe weather events across our copper business.

Compared with the same period last year, we grew our copper production by 11% to 116,000 tons, with increases at all operations except Carmen de Andacollo, which have an extended suspension of operations due to extreme weather. While Red Dog zinc production declined by 13% to 107,000 tons due to lower grades, as expected in the mine plan, refined zinc production at Trail Operations increased 18% to 62,000 tons. Antamina zinc production was down 70% due to a lower ratio of copper zinc ore, as expected in the mine plan and reflected in our annual 2026 guidance. Turning to costs at the bottom of the slide and noting continued strong cost performance in the quarter. In copper, net cash unit costs improved 15% from a year ago to $1.77 per pound in the quarter. Year-to-date, our net cash unit costs are $1.72 per pound.

In zinc, unit costs were $0.27 per pound in the quarter, reflecting lower volumes at Red Dog as expected. We continue to benefit from strong by-product prices and year-to-date, we're at $0.30 per pound. Higher by-product prices, together with strong operating discipline, have allowed us to lower our 2026 cost guidance for both copper and zinc. Copper net cash unit costs for 2026 are now expected to be between $1.80 and $2 per pound. In zinc, we've reduced our guidance roughly in half, with net cash unit costs now expected to be between $0.30 and $0.40 per pound. Crystal will take you through the details shortly. Overall, we've delivered copper growth and cost discipline in the face of a challenging operating environment in the third quarter, demonstrating the resilience of our operations.

There are no changes to our copper or zinc production guidance for 2026, including for QB, despite the impact of severe weather in the third quarter. On October 24th, a strike commenced at Highland Valley. Contingency plans are in place, and HVC continues to operate at a reduced capacity. The impact on production depends on the duration of the labor action, and we do not expect any significant impact on construction timelines for the mine life extension project. Our focus is on maintaining safe and environmentally responsible operations while working towards a new collective agreement that is fair to employees and supports the long-term competitiveness of the operation. More broadly, the weather we experienced in the third quarter is a reminder of the very real impacts of climate change and of why building resilience into our operations matters.

We continue to adjust our planning processes and operating assumptions to account for climate-related risks, and our plans consider a range of scenarios. Turning now to QB on slide eight. QB's operating performance has been strong, excluding the impacts of the recent severe weather. QB's solid execution in the first half of the year continued through July, with key operating metrics consistent with or ahead of those used in our guidance for this year. However, severe weather in August caused intermittent power outages and downtime at the concentrator and affected our dewatering systems and other critical equipment. Wet conditions continued into September, reducing mine productivity and limiting our access to higher-grade ore. As a newer operation, QB is predominantly operating in a single phase of the mine per the mine plan, resulting in limited operational flexibility to respond to severe weather conditions.

These weather impacts, along with a planned maintenance shutdown in September, are reflected in QB's third quarter operating results. Asset utilization was 79%, throughput averaged 117,000 tons per day, and recoveries were just over 81%. On a year-to-date basis, QB's operating metrics remain consistent with those used in our 2026 annual production guidance, which is unchanged. Completion of the final plant shutdown for the year in September supports continued operational performance for the remainder of the year, and work is continuing on performance improvements for recoveries. As the mine plan advances through the fourth quarter and into 2027, multiple mining phases will be opened, enhancing operational flexibility and ore sourcing optionality and resulting in improved reliability and resilience. Turning to an update on QB's TMF on slide nine. As you can see in the photos, development work on the TMF continues to advance.

The third quarter of 2026 marks our fourth consecutive quarter with no TMF-related downtime. Sand deposition has improved significantly from a year ago, and in July, we achieved our highest monthly deposition rate. Construction of the secondary cyclone station is expected to further improve sand deposition performance and provide additional operational flexibility. As previously disclosed, we brought forward material placement originally planned for 2027 into 2026 and commenced construction of Rock Bench 6 in Q3. This allows us to install the permanent TMF pipeline infrastructure, which began in October. The updated scorecard on slide 10 summarizes our latest progress on QB's TMF. We expect to complete all of our near-term TMF development objectives by the first quarter of 2027. We are working hard to advance the three remaining major components. Commissioning of the secondary cyclone system is expected in the first quarter of 2027.

Construction of Rock Bench 6 and installation of the permanent TMF pipeline infrastructure are also expected to be completed in the first quarter of 2027. The photo on the right shows installation of the jacking header, which is part of the permanent pipeline infrastructure and will mechanically raise the tailings and sand pipelines once completed. Successful completion of these three remaining components of the TMF will support more efficient and optimized TMF performance and enable steady state operations at QB. Turning now to the mine life extension at Highland Valley on slide 11. Construction is progressing well, and the project is now more than 25% complete. More importantly, construction of the project is proceeding safely with more than 1.5 million hours worked without a high potential incident or lost time injury. Work is underway across the project, including tailings and power infrastructure, earthworks, pipelines, and brownfield work.

Towards the end of the third quarter, we began a planned temporary shutdown of one grinding line to allow for upgrades to the processing plant, and we expect that work to be completed in January 2027. Our project capital guidance is unchanged, CAD 900 million-CAD 1.2 billion for 2026 and CAD 2.1 billion-CAD 2.4 billion in total. We invested CAD 230 million of project capital in the third quarter and CAD 672 million year-to-date. In line with the mine plan, capitalized stripping activity for the project is expected to continue ramping up in the fourth quarter. I'll now hand over to Crystal, who will take you through the financial results in more detail.

Crystal Prystai

Thanks, Jonathan. Good morning, everyone. Starting with the overview of Q3 2026 financial performance on slide 13. Overall, we had strong financial performance in the quarter, reflecting increased production, disciplined execution, and record copper prices, which averaged $6.40 per pound. Compared with the same period last year, we doubled our adjusted EBITDA to CAD 2.3 billion, driven by significantly higher copper and zinc prices, higher byproduct revenue, and lower smelter processing charges. Our adjusted EBITDA margin increased to 51%, up from 35% a year ago. We generated CAD 1.6 billion of cash flow from operations, nearly 2.5x the CAD 647 million we generated in Q3 2025. During the quarter, we recorded a pre-tax impairment reversal of CAD 888 million on Trail Operations. This reflects higher expectations for long-term commodity prices, stronger market fundamentals for strategic metals, and increased cash flow from our optimized feed strategy.

Turning to the key drivers of our higher profitability in Q3 2026 on slide 14. Higher commodity prices, primarily copper and zinc, were the largest contributor, adding just over CAD 1 billion to adjusted EBITDA compared with a year ago. Higher co-product and byproduct pricing, mainly silver, added another CAD 198 million, and lower smelter processing charges added CAD 50 million. These gains were partly offset by lower zinc volumes at Antamina and Red Dog, in line with our mine plans, which reduced adjusted EBITDA by CAD 126 million. Turning to our copper segment on slide 15. Despite severe weather, our copper business generated significant profit and delivered strong margin growth, demonstrating operational resilience. Gross profit before depreciation and amortization more than doubled to CAD 1.6 billion, with a margin of 65%. This was primarily driven by another record quarterly average copper price.

Copper production grew 11% compared with the same period last year to 116,000 tons, with increases at QB, HVC, and Antamina. Higher production at Highland Valley and Antamina reflects higher copper grades in line with our mine plans. QB production of 47,000 tons was higher than the same period last year. However, it was lower than in Q2 2026, reflecting the severe weather impact in the quarter and limited flexibility while we are predominantly mining in a single phase. Carmen de Andacollo operations were suspended for an extended period in Q3 due to extreme weather and returned to full operations by the end of September. Copper net cash unit costs improved 15% to $1.77 per pound, reflecting strong cost performance, lower treatment charges, and higher byproduct credits.

Looking forward, we have lowered our 2026 copper net cash unit cost guidance to $1.80-$2 per pound from $1.85-$2.20 per pound to reflect strong performance and byproduct pricing year-to-date. Our annual copper production guidance is unchanged. We continue to expect QB to produce between 200,000-235,000 tons this year, despite the impact of severe weather in the third quarter. At Highland Valley, we expect 2026 production towards the high end of our guidance range of 115,000-135,000 tons, despite the strike. At Antamina, we continue to expect 2026 production to be within our guidance range of 95,000-105,000 tons. As a result of the extreme weather in Q3, we expect production at Carmen de Andacollo to be at the low end of our 45,000-55,000 ton guidance range.

Turning to our zinc segment now on slide 16. Our zinc business continues to generate significant value. Gross profit before depreciation and amortization increased 41% to CAD 638 million, with a margin of 31%. This was primarily driven by higher zinc prices and higher byproduct revenues. Red Dog's production declined by 13% to 107,000 tons due to lower grades in line with the mine plan, and Red Dog sales were within our previously disclosed guidance range at 247,000 tons. Refined zinc production at Trail Operations increased 18% to 62,000 tons. Trail Operations profitability improved significantly again this quarter, with gross profit before depreciation and amortization of CAD 169 million, up from CAD 54 million a year ago, reflecting our optimized feed strategy and strong commodity prices. The zinc net cash unit cost increased by 59% to $0.27 per pound, driven by lower volumes at Red Dog as expected.

Higher byproduct revenues, especially from silver, partly offset the increase, and year-to-date unit costs continued to be below our previously disclosed guidance range. As a result of strong cost performance and higher byproduct pricing, we have improved our 2026 zinc cash unit cost guidance. Total cash unit costs are lowered to between $0.70-$0.80 per pound, down from $0.80 to $0.90. Net cash unit costs are lowered to between $0.30 and $0.40 per pound, down from $0.65 to $0.75. Looking forward, we expect Red Dog's shipping season to be completed by early November and Red Dog sales to be between 65,000 and 75,000 tons in Q4 2026, reflecting the normal seasonality of sales. Our zinc production guidance is unchanged.

Based on strong year-to-date performance at Red Dog, we expect our 2026 zinc in concentrate production to be at the high end of our guidance of 410,000 to 460,000 tons. We also expect our 2026 refined zinc production at Trail to be at the high end of our guidance. We significantly improved our copper EBITDA margins compared to the same period last year, from 42% to 67%, primarily driven by record copper prices, higher production and sales volumes, and lower copper net cash unit costs. We also increased our zinc EBITDA margin from 28% to 30%, primarily driven by higher zinc prices, stronger by-product revenues, and our continued focus on feed optimization at Trail. The ongoing improvements in our EBITDA margins demonstrate the underlying strength of our business. Looking more closely now at our unit costs on slide 18.

Year-over-year, our net cash unit costs were lower in copper and higher in zinc. The decline in copper unit costs was driven by strong cost discipline with lower cash cost of sales. Lower smelter processing charges were also a benefit. The contribution from by-products remained strong, though lower year on year as the benefit of higher by-product prices was offset by lower by-product volumes. Higher zinc net cash unit costs were driven by higher cash cost of sales as a result of lower volumes at Red Dog, as expected in our mine plan, with a small offset from lower smelter processing charges. Higher diesel costs have negatively impacted our operating costs this year, particularly in our copper segment, and at the same time, by-product revenues continue to provide a material benefit to our unit costs.

As I noted on the last slide, based on our performance year-to-date, we have reduced our 2026 unit cost guidance for both our copper and zinc segments. We have provided sensitivities of our net cash unit cost to by-product prices and to WTI oil prices as a proxy for diesel. In copper, our net cash unit costs are most sensitive to WTI and silver. For every $10 per barrel change in WTI, our annual copper net cash unit costs are expected to move $0.03 per pound. For every $10 per ounce change in the silver price, our annual copper net cash unit costs are expected to move $0.02 per pound. In zinc, our net cash unit costs are most sensitive to silver.

For every $10 per ounce change in the silver price, our annual zinc net cash unit costs are expected to move $0.05 per pound. Our exposure to diesel prices is lower in our zinc segment, where every $10 per barrel change in WTI is expected to move our annual net cash unit cost by only $0.01 per pound. Red Dog purchases diesel for the full year during each shipping season. Most of this year's supply was delivered in the third quarter, and the operation has now started using it. That diesel was purchased at higher prices than last year. We are maintaining our strong focus on cost discipline and productivity. In today's inflationary environment, value creation isn't just about growing tons, it's about protecting margins and generating attractive returns. Turning to our balance sheet on slide 19.

We've continued to strengthen our balance sheet while funding the Highland Valley Copper Mine Life Extension Project. This is driven by our strong cash flow from operations, which were CAD 1.6 billion in the quarter. As a result, our net cash position increased by CAD 655 million in the quarter and by CAD 1.7 billion year-to-date to CAD 1.9 billion. Our liquidity was CAD 10.9 billion at the end of September, including CAD 6.7 billion of cash and our undrawn $3 billion sustainability-linked revolving credit facility. We returned CAD 61 million to shareholders in the quarter due to payment of our regular base quarterly dividend of CAD 0.125 per share. We continue to maintain investment-grade credit ratings, and we continue to reduce debt through our scheduled semi-annual repayments under the QB project finance facility.

The ongoing strength of our balance sheet provides a strong foundation as we advance towards the launch of Anglo Teck. I will now pass it back to Jonathan for closing remarks.

Jonathan Price

Thanks, Crystal. I will wrap up on slide 21. It is an exciting time at Teck. Into the final quarter of the year, our focus is clear. Finish 2026 strong and deliver on our commitments. Our priorities in the near term are unchanged. Disciplined execution, safe and reliable operations, and continuing to unlock the potential of our assets. This quarter's results demonstrate the quality of our business and the strong foundation we have built as we advance towards Anglo Teck.

We will be entering our next chapter from a position of strength, built on the foundation of a high-quality critical minerals portfolio with safe and productive operations and attractive short, medium, and long-term copper growth optionality, backed by a very strong balance sheet. We are moving towards completion of the merger with Anglo American and progressing towards the creation of a new global critical minerals champion and top five copper producer.

With that, over to you, operator, for questions.

Operator

Thank you. To join the question queue, please press star then one on your touch-tone telephone. You will hear a tone acknowledging your request. We ask that you please limit yourself to one question and one follow-up. If you are using a speakerphone, please ensure you lift the handset before pressing any keys. If you wish to remove yourself from the question queue, you may press star then two. The first question comes from Orest Wowkodaw with Scotiabank. Please go ahead.

Orest Wowkodaw

Hi, good morning. Jonathan, I am wondering if you can give us a bit more color on the current status of the regulatory approval in China. Specifically, there have been some media reports not that long ago that China is looking for security of copper concentrate offtake. I am just wondering if you can confirm that, and is that the only thing China is looking for?

Jonathan Price

Hi, Orest. Thank you for the question. As you'd expect, I can't say much about the nature of the discussions we're having with the regulator in China. I'd say that the process with SAMR is unfolding very much in the normal course. We continue to respond to information requests, and we continue to expect completion within 12-18 months from the date of announcement. We're, of course, looking forward to receiving that approval so we can complete the merger with Anglo American. Unfortunately, Orest, I can't really say more than that about the nature of those discussions.

Orest Wowkodaw

Okay. Could you maybe then just comment in terms of, if you can't comment on the nature of just where the status is? I assume it's a back-and-forth process in terms of requests for information and your response. Could you characterize maybe where things are at in that process? Are we in the late stages or are we still call it in the midst of negotiations?

Jonathan Price

Yeah. Again, Orest, unfortunately, I'm not going to sort of unpack the details of the process and the engagements other than to say that it's a constructive engagement. We continue to have confidence in receiving that approval within the timeline that we set out of 12-18 months from announcement. On that basis, we're closer to the end than we are to the beginning. Aside from that, there's really no additional color that I can provide.

Orest Wowkodaw

Okay. Thanks very much.

Jonathan Price

Thanks, Orest.

Operator

Next question comes from Liam Fitzpatrick with Deutsche Bank. Please go ahead.

Liam Fitzpatrick

Good morning, Jonathan team. Two questions. Firstly, just on QB, it seems like it's the grade uplift that's going to be key to hitting the production range or guidance for next year. So what's the level of confidence in that grade uplift, and when will that start to come through? Is it the early part of 2027 or potentially later in the year? And then second question is on copper concentrate sales into next year. Can you give any color in terms of the strategy, whether you're still looking to lock up the bulk of volumes under an annual benchmark, whatever that turns out to be, or whether you're shifting the book more towards shorter term or spot sales? Thank you.

Jonathan Price

On the QB piece, Liam, as we've noted, we'll have significantly more optionality in the mine as we move through this quarter, but also into next year as we open up a second and third phase in the mine. Of course, we'll be able to access grades, but we expect to see them to be relatively stable throughout the course of next year. It will also, of course, give us enhanced blending optionality across the different ore types, which will help us with recoveries ultimately. So this is all reflective of a maturing mine and the operational flexibility that we'll continue to have as we go forward there. In terms of copper concentrate sales, I mean, we'll continue very much in the normal course in terms of contracting with customers.

But I'll just ask Ian, our Chief Commercial Officer, whether he has any further comments to make on pricing mechanisms.

Ian Anderson

Only just saying thanks for the question, Liam. Of course, the existence and preservation of the copper benchmark is still a bit at question, and so won't comment on where those negotiations might result with both other customers and other producers. But would say that we carefully balance our book between both existing long-term contracts and spot sales. That's gone well this year, and we don't see a change for next year.

Liam Fitzpatrick

Okay. Thank you.

Jonathan Price

Thanks, Liam.

Operator

The next question comes from Chris LaFemina with Jefferies. Please go ahead.

Chris LaFemina

Hi, thanks. Hey, guys. Congratulations on another good quarter. Maybe following up on what Liam asked about the guidance. So, when you first laid out the guidance for QB this year, there is a lot of people in the market questioning whether you would be able to hit the targets, and you are showing that you are comfortably hitting the targets. Even in a quarter when you had horrific weather, you are still producing at a level that is effectively within the guidance range. It appears, with the benefit of hindsight, that the guidance was relatively conservative. Now your 2027 and 2028, particularly 2028 overall copper guidance, is for a pretty significant decline in production. Part of that is grade related. I am wondering if we should assume the same level of potential conservatism in that guidance as well. Is the risk of that leaning more to the upside? Thanks.

Jonathan Price

Yeah, thanks for the question, Chris. Look, when we established our guidance, we, as you know, anchored it very much in observable performance at the operation. But we did also include, as we worked through the forward guidance years, improvements in that performance, which are built into those plans. The 2028 year and the lower guidance there has always been a function of grade and a function of the mine plan. That is not materially different as we see it today compared to when we guided to that previously. I think we had, as I mentioned, a stellar first seven months of the year. I think the mine was performing very, very well. We were meeting all of the metrics that we set out, in some cases marginally exceeding those.

We have had a couple of challenging months due to weather effects, as you note in Q3, and the focus now is on full recovery of operations and a strong fourth quarter. I would not describe that guidance as conservative. I would describe it as reflective of what is a complex system. Tier one mines are complex systems, and an ongoing improvement in the underlying performance metrics required to deliver those numbers. As you see in our numbers today, we have not made any change to the 2027 and 2028 guidance, signaling our comfort with those numbers being appropriate. Of course, we always continue to evaluate as things change and performance changes. But right now, we are comfortable with the numbers we have.

Chris LaFemina

Thank you. Good luck.

Jonathan Price

Thank you, Chris.

Operator

The next question comes from Myles Allsop with UBS. Please go ahead.

Myles Allsop

Great. Thank you. Maybe just first on QB again. When is the next maintenance shutdown expected to take place? Is it Q1 or Q2 next year? Maybe on Red Dog as well. Obviously, we have guidance out to 2028, 250,000 tons, so continuing to fall. How long is the life of the existing operation, and when do you need to approve the sustaining project to avoid a full closure of the operation?

Jonathan Price

Thanks for those questions, Myles. On the first one, the next shutdown at QB is in the first quarter of next year. As mentioned, we do not have one this quarter, which is important for us. I think it was a very comprehensive shutdown in September. That went very well in terms of the activities that were undertaken, and it gives us important operational continuity through the back end of the year. In terms of Red Dog, generally, we have seen an end of the current mine life there at around 2031. Of course, we continue to review that to see if there is additional reserve available to extend that life. But I think that is the best working assumption at this point in time. We are working very hard on understanding the potential for the mine life extension there.

We have two world-class ore bodies within about 15 km of the existing operations at Red Dog. Very good grades, and very rich in some of the specialty metals that have been so important to our profitability at Trail. We continue to evaluate that. We are in the PFS stage. We are working on opening up the portal there to get better access to those resources. And sanction will be several years from now is probably the best way to put that at the moment. We have to complete pre-feas and get through feasibility study, until we get to that decision. It is a way out, but it is something the projects and operations teams are working very hard on.

Myles Allsop

Just be clear. On QB, is it going to be two or three maintenance shuts in 2027? And on Red Dog, just a quick follow-up there as well. With the opening up these new ore bodies, is it going to be like a three, four-year construction? If we are going to avoid a zero in 2032, we need to get there by 2027, 2028 in terms of the approvals.

Jonathan Price

On the first question, just in shutdowns, we would expect to have three major shutdowns at QB next year. You will recall that when we started up the operation, they were quarterly. We are sort of extending the time between shutdowns now. That would be the expectation for next year. Of course, with Red Dog, we are working hard to try and avoid a production gap at that mine. That is what we are driving towards. Of course, that would be the ideal outcome. That will be a product of many things, including the existing mine plan and of course the progress of the project. We will be able to say more about that in due course.

Myles Allsop

Thank you.

Jonathan Price

Thanks, Myles.

Operator

The next question comes from Carlos De Alba with Morgan Stanley. Please go ahead.

Carlos De Alba

Yeah, thank you. Good morning, everyone. Just maybe on the zinc side, any comments on what the expectations you have for zinc TC/RC next year, just given what we have seen recently in China and also globally, I guess. Then, if you could provide any more color on the CGF investment at Trail. I think it was presented as equity-like, but do you have any more details if it will be equity or what you mean equity-like? Thank you.

Jonathan Price

Carlos, thank you very much. I will hand over to Ian for the zinc TC/RC or TC conversation.

Ian Anderson

Thank you, Carlos, for that question there. I think, really, there are a few things that have happened there coming out of LME, and we think that zinc is a positive story. Certainly, it performed very strongly in 2026. You saw pricing peak at about $4,000 a ton in Q3. In fact, zinc was LME's best-performing metal for the year. Rightly, as you point out, that supply story is starting to get more attention. I think what you're seeing is something that has growing similarities to copper, so highly negative treatment charges. We are expecting our treatment charges to continue the direction that you've seen in the spot market, in 2027, which answers your question. Certainly, there's not enough concentrate to meet smelter needs. You're seeing Chinese smelters pulling hard on concentrate imports whenever there's material available.

As well, the trading houses are starting to come into it. Really, I think that challenge is driven by maintaining supply in existing mines. You can see an example of that with Antamina based on the existing mine plan, lower in zinc production for the year. On the whole, in the zinc market, mines are depleted faster than new ones are being added. You're also not seeing the elastic supply that would come from smaller Chinese operations coming into the market. China similarly has been challenged in terms of their imports, particularly for obvious reasons, both in Iran and with reference to Russia. Essentially, zinc supply is about the same as we've seen a decade ago. We're also seeing some demand implications on the finished side, particularly in North America for 2027. Overall, I think that's a good success story.

The pieces on zinc, in terms of fundamentals, this is an asset that, of course, or a product that's consumed in its use. As you start to see infrastructure spend flow through as it has in the world, and in the era of climate change, I think that in a hotter, wetter world, the world needs more zinc. So we're looking forward to the future of that commodity.

Jonathan Price

Yeah. Just to move on to your question about the CGF funding, Carlos, as you know, that's been very much centered around germanium, antimony, and gallium, and increases of production for each of those metals at Trail. We continue to be working very constructively with the Canadian government on that and with the Canada Growth Fund. We haven't finalized those discussions yet. Of course, we'll announce them when we do. They are very interested in supporting the expansion of that capacity which we know is for small markets and comes with some risk. So we're working with them on the nature of funding that will reflect both the opportunity and the risk associated with those investments. But nothing more to communicate at this stage.

Carlos De Alba

Thank you. Jonathan, if I may just follow up on QB. How's October ramping up after the production in September? In particular, I think that was the only operation where you didn't highlight if you expect to be at the low end or the high end of the production, unchanged production range. Any color there? Thank you.

Jonathan Price

Look, the operation is recovering well from the challenges we had through August and September, and as I said, we hope to finish the year strong here and get that back to sort of steady state and full rates. But yeah, things have improved significantly as we've worked through the last couple of months.

Carlos De Alba

Thank you.

Operator

The next question comes from Craig Hutchison with TD Cowen. Please go ahead.

Craig Hutchison

Hi. Good morning, guys. Let me just follow up from the last question. As you highlighted weather issues in Q3, have you had any weather-related issues at either QB or Carmen de Andacollo creep into Q4 at this point, or has it been fairly steady state?

Jonathan Price

No, it's been pretty steady state, Craig. The weather in Chile generally has been quite up and down, including through the month of October, but nothing has had a direct impact on our operations.

Craig Hutchison

Okay, great. Then just on Highland Valley, the work that you're doing at the mill, the mill upgrades, the upgraded flotation circuit, what's the timing around that completion? Once it's done, what are you guys hoping to achieve from maybe a throughput and a recovery perspective? Thanks.

Jonathan Price

Yeah, thanks for that. That is an AG to SAG conversion, essentially, which will allow us to process harder material more effectively. The timeline for that is Q1. Of course, it is complicated when you are doing these things inside a constrained operating environment, but that work is going well. That conversion is well underway right now, and as I said, we plan to have that finished in the first quarter.

Craig Hutchison

Okay, so the plan would be just to sort of maintain the steady-state throughput, considering you will be dealing with harder ore?

Jonathan Price

That is exactly right. Yes.

Craig Hutchison

Okay. All right. Thank you.

Jonathan Price

Thank you, Craig.

Operator

Thank you. We are out of time for further questions. I will now hand the call back over to Jonathan Price for closing remarks. Please go ahead.

Jonathan Price

Thank you very much. That wraps up our third quarter of 2026 conference call. As always, please feel free to reach out to Edwin and the IR team with any further questions. So thank you again for joining us and enjoy the rest of your day.

Operator

This concludes today's conference call. You may disconnect your lines. Thank you for participating and have a pleasant day.

Financials CAD · E = consensus estimate · column links open the source filing

Revenue and net income

FY2022FY2023FY2024FY2025
Revenue $17.32B $6.48B $9.07B $10.76B
Revenue Growth +35.6% -62.6% +40.0% +18.7%
Gross Profit $8.57B $1.11B $1.61B $2.66B
Gross Margin 49.5% 17.2% 17.7% 24.7%
EBITDA $8.66B $1.15B $1.72B $4.01B
EBITDA Margin 50.0% 17.7% 18.9% 37.2%
Net Income $3.30B $2.31B $283.00M $1.07B
Net Margin 19.0% 35.6% 3.1% 10.0%
Diluted EPS $6.19 $4.59 $0.78 $2.83
EPS Growth +16.6% -25.8% -83.0% +262.8%
Operating Cash Flow $7.98B $4.08B $2.79B $1.48B
CapEx -$5.47B -$4.34B -$2.64B -$2.06B
Free Cash Flow $2.52B -$256.00M $155.00M -$583.00M
Cash $845.00M -$560.00M $6.57B $4.10B
Total Debt $7.74B $7.60B $5.48B $4.86B
Enterprise Value $33.57B $37.07B $28.45B $32.89B

Ratios · FY2025

Valuation
P/E23.24×
P/S2.99×
P/B1.28×
P/FCF-55.11×
EV/Sales3.06×
EV/EBITDA8.21×
FCF Yield-1.8%
Shareholder Yield5.1%
Profitability
Operating Margin20.9%
Net Profit Margin10.0%
Return on Equity4.0%
Return on Invested Capital4.0%
Return on Assets3.1%
R&D to Revenue0.00
Health
Current Ratio2.54
Quick Ratio1.79
Debt / Equity0.19
Debt Ratio0.11
Net Debt-$150.00M
Payout Ratio17.6%
Growth
Revenue 1Y Growth18.7%
Revenue 3Y CAGR-14.7%
Revenue 5Y CAGR3.7%
Diluted EPS 1Y Growth262.8%
Diluted EPS 3Y CAGR-23.0%

Revenue · FY2025

Copper
$6.62B 61.5%
Zinc
$4.14B 38.5%

Holders 599 institutions on file

InstitutionShares% of Shares OutValueChange QoQFiled
Principal Financial Group Inc 21.30M 4.41% $1.41B -7.41% Nov 2, 2026
Vanguard Capital Management Llc 13.15M 2.72% $866.06M +0.58% Nov 13, 2026
Hancock Prospecting Pty Ltd 10.30M 2.13% $677.52M 0.00% Nov 16, 2026
Bank Of Montreal /can/ 9.62M 1.99% $633.40M +17.22% Nov 9, 2026
Fil Ltd 8.95M 1.85% $589.01M +128.65% Nov 10, 2026
Ubs Group Ag 8.67M 1.79% $570.67M -40.60% Nov 10, 2026
Goldman Sachs Group Inc 8.59M 1.78% $565.14M -1.41% Nov 16, 2026
Nomura Holdings Inc 8.53M 1.76% $561.00M +18.38% Nov 16, 2026
Mirae Asset Global Etfs Holdings Ltd. 7.26M 1.50% $478.94M -5.60% Nov 16, 2026
Mackenzie Financial Corp 7.16M 1.48% $471.48M -1.62% Nov 2, 2026
Davis Selected Advisers 7.14M 1.48% $469.77M -14.62% Nov 10, 2026
Cibc Asset Management Inc 6.83M 1.41% $452.95M +1.22% Nov 5, 2026
D. E. Shaw & Co., Inc. 6.73M 1.39% $442.65M +8.20% Nov 16, 2026
Hbk Investments L P 6.31M 1.31% $415.15M +9.30% Nov 16, 2026
Wellington Management Group Llp 6.30M 1.30% $415.35M +117.47% Nov 25, 2026

Insider and Congress trading All Congress trades →

Politicians’ trades

All politicians →
TradedPoliticianTypeAmountOwner
Jul 23, 2024
filed Aug 12 · 20d later
Jonathan Jackson
D House · IL-1
Sell$15K–$50KJoint
Jul 9, 2024
filed Aug 12 · 34d later
Jonathan Jackson
D House · IL-1
Buy$15K–$50KJoint

Historical data USD · newest first

DateOpenHighLowCloseChangeVolume