USMarketsToday.com
ANT

Antofagasta plc

ANTO.L · LSE · United Kingdom
$2,707.00+$114.00 ↗ 4.40%
At close: Nov 27, 4:35:27 PM GMT
Volume
Market Cap$26.69B
Open$2,720.00
Trailing P/E21.11
Day Range$2,683.00–$2,732.00
Dividend Yield2.14%
52W Range$2,467.00–$4,475.00
EPS$1.26
Volume1.23M
Avg Volume1.13M
50-Day Avg$3,310.14
200-Day Avg$3,678.36
Why is ANTO.L moving?

Antofagasta jumped as surging copper prices lifted mining stocks, helping the FTSE 100 to its biggest weekly gain in about eight months.

Bull vs Bear

Every version →
▲ Bull caseConsensus targets sit far above the current price. Investing.com shows an average 12-month target of about 3,806p, roughly 40% upside, with Citi, JPMorgan and Berenberg rated Buy at 41 to 45. Simply Wall St also puts the shares well below its DCF fair value.[8][2]
▼ Bear caseThe shares look expensive on earnings multiples. The P/E of 19.6x compares with a peer average of 16.2x and an industry average of 12.6x. Analysts are not within a statistically confident range of agreement. Deutsche Bank sits at Hold and trimmed its target to 30, which signals limited conviction.[7][8]
Largest moves in the past year from daily prices
Nov 23, 2026
Sharp DropNew 52-Week LowGap Down 3.4%
ANTO.L fell 8.1% to close at $2,546.00, opening 3.4% below the prior close. Intraday range of $157.00 ($2,521.00 – $2,678.00) spanned 6.2% in a volatile session. Set a new 52-week low of $2,521.00. Closed near the day's low as sellers pressed into the close.
-8.1%
Nov 17, 2026
Sharp DropGap Down 2.6%
ANTO.L fell 7.9% to close at $2,782.00, opening 2.6% below the prior close. Intraday range of $186.00 ($2,763.00 – $2,949.00) spanned 6.7% in a volatile session. Volume reached 2.47M shares (2.4× the 20-day average). Closed near the day's low as sellers pressed into the close.
-7.9%
Aug 12, 2026
Sharp DropGap Down 5.0%
ANTO.L fell 6.8% to close at $3,756.00, opening 5.0% below the prior close. Intraday range of $199.34 ($3,756.00 – $3,955.34) spanned 5.3% in a volatile session. Volume reached 2.04M shares (1.8× the 20-day average). Closed near the day's low as sellers pressed into the close.
-6.8%
Aug 3, 2026
Big RallyGap Up 2.5%
ANTO.L gained 6.8% to close at $3,931.00, opening 2.5% above the prior close. Intraday range of $217.17 ($3,766.30 – $3,983.47) spanned 5.8% in a volatile session.
+6.8%
May 14, 2026
Sharp DropGap Down 4.1%
ANTO.L fell 10.7% to close at $3,810.00, opening 4.1% below the prior close. Intraday range of $290.00 ($3,810.00 – $4,100.00) spanned 7.6% in a volatile session. Closed near the day's low as sellers pressed into the close.
-10.7%
May 12, 2026
Big RallyGap Up 3.1%
ANTO.L gained 8.7% to close at $4,299.00, opening 3.1% above the prior close. Intraday range of $236.00 ($4,063.00 – $4,299.00) spanned 5.8% in a volatile session. Closed near the session high, with buyers in control into the close.
+8.7%
May 5, 2026
Big RallyGap Up 3.4%
ANTO.L gained 7.2% to close at $3,818.50, opening 3.4% above the prior close. Intraday range of $231.50 ($3,681.00 – $3,912.50) spanned 6.3% in a volatile session.
+7.2%
Apr 7, 2026
Big RallyGap Up 17.2%
ANTO.L gained 9.9% to close at $3,777.00, opening 17.2% above the prior close. Intraday range of $297.50 ($3,732.50 – $4,030.00) spanned 8.0% in a volatile session.
+9.9%
Mar 31, 2026
Big RallyGap Up 9.4%
ANTO.L gained 4.7% to close at $3,482.00, opening 9.4% above the prior close. Intraday range of $164.69 ($3,475.31 – $3,640.00) spanned 4.7% in a volatile session.
+4.7%
Mar 22, 2026
Big RallyGap Down 3.8%
ANTO.L gained 7.3% to close at $3,373.00, opening 3.8% below the prior close. Intraday range of $437.00 ($2,978.00 – $3,415.00) spanned 14.7% in a volatile session. Volume reached 2.34M shares (1.6× the 20-day average). Closed near the session high, with buyers in control into the close.
+7.3%
Feb 17, 2026
Big RallyGap Up 2.6%
ANTO.L gained 10.6% to close at $4,000.00, opening 2.6% above the prior close. Intraday range of $340.00 ($3,660.00 – $4,000.00) spanned 9.3% in a volatile session. Closed near the session high, with buyers in control into the close.
+10.6%
Feb 1, 2026
Gap Down 8.2%
ANTO.L fell 0.2% to close at $3,640.00, opening 8.2% below the prior close. Intraday range of $320.00 ($3,345.00 – $3,665.00) spanned 9.6% in a volatile session.
-0.2%

Latest news

Research

Independent reports

Strong prices alone won’t solve all underlying problems
AlphaValue Independent Equity Research·Nov 2, 2026 bearish

AlphaValue argues Antofagasta’s more than 25% retreat from its 2026 highs does not mean the sell-off is over, citing renewed AI-market concerns and debt-related worries. The report reiterates a negative investment view.

Strong H1 results marred by 2026 production guidance downgrade
AlphaValue Independent Equity Research·Aug 12, 2026 bearish

Despite strong first-half results, AlphaValue sees the 2026 copper-production guidance cut as a material concern: extreme weather in Chile caused the downgrade, and the report warns of further implications. The thesis is bearish, focused on production risk outweighing the positive results.

Time to (re-)assess the bitter reality
AlphaValue Independent Equity Research·May 6, 2026 bearish

AlphaValue reiterates its Sell view despite raising its target price by more than 15%. It argues that ambitious long-term fundamental assumptions and still-maxed relative-valuation premiums leave the shares unattractive.

2025 was extraordinarily euphoric; now time for reality check
AlphaValue Independent Equity Research·Feb 16, 2026 bearish

AlphaValue argues that even extraordinary 2025 operating results failed to satisfy market expectations, with the shares falling about 7% around the results. The report’s framing is cautious: strong reported performance alone did not resolve the market’s concerns.

DON’T BET YOUR SHIRT ON ANTOFAGASTA (SELL; 17% DOWNSIDE)
AlphaValue Independent Equity Research·Nov 18, 2025 bearish

AlphaValue rates Antofagasta Sell, arguing that the share-price surge—about 69% year to date versus roughly 18% for its mining sector—reflects excessive euphoria and leaves 17% downside.

Earnings Earnings history → · Earnings calls →

Next report · H2 FY2026

DateFeb 16, 2027
EPS Est.$0.95
Revenue Est.$4.71B
Avg 1-Day Move±—

EPS: estimate vs actual

Earnings history

QuarterDateEPS Est.EPS ActualSurpriseRevenue Est.Revenue ActualSurpriseNext-Day Move
H1 FY2026 Aug 13, 2026 $0.55 $0.65 +18.2% $3.36B $3.38B +0.6% —
H2 FY2025 Feb 17, 2026 $0.62 $0.61 -1.5% $3.51B $3.57B +1.5% —
H1 FY2025 Aug 14, 2025 $0.32 $0.35 +8.5% $2.80B $1.39B -50.3% —
H2 FY2024 Feb 18, 2025 $0.32 $0.32 +0.0% $2.92B $2.92B 0.0% —
H2 FY2023 Feb 20, 2024 $0.26 $0.26 +0.5% $2.32B $2.28B -2.0% —
H1 FY2023 Aug 10, 2023 $0.34 $0.27 -19.1% $2.32B $2.76B +19.0% —
H1 FY2022 Aug 11, 2022 $0.23 $0.22 -7.5% $2.07B $2.08B +0.3% —
H1 FY2021 Aug 19, 2021 $0.52 $0.49 -6.6% $2.67B $2.60B -2.6% —

Latest earnings analysis · H1 FY2026 · Aug 13, 2026

H1 2026 EBITDA rose 27% to 2.84 billion with an industry-leading 63% EBITDA margin; net cash cost fell 8% despite inflationary pressure on diesel and sulfuric acid, keeping full-year net cash cost guidance unchanged at 1.15-1.35 per pound; interim dividend of 30.1 cents, up 80-81% year-on-year, consistent with 35% minimum payout policy.
Full-year copper production guidance revised down to 625,000-655,000 tonnes due to severe winter storms at Pelambres (a state of catastrophe event, the most severe in the mine's history, requiring removal of ~5 million m3 of snow), with grade deferrals expected into late 2026/early 2027; guidance also factors in contingency for continued adverse weather through remainder of winter.
Centinela second concentrator project remains on schedule (commissioning in 2027, ramp-up in 2028) and on budget, despite additional geotechnical sealing work needed in the flotation area; 2026 development CapEx guidance of 3.4 billion reaffirmed, with peak capital spend now passed; sustaining CapEx expected to remain in the 1-1.5 billion range over the next couple of years, with total CapEx trending toward sustaining levels by 2028.
Approved a 900 million desalinated water pipeline investment at Pelambres to eliminate reliance on continental water by mid-2028, supporting a potential mine life extension to 2051; existing water infrastructure also has latent capacity to support throughput increases at Centinela, including a permitted expansion path to 150,000 tonnes/day already covered under the current environmental permit.
Long-term copper market outlook remains constructive, with global demand expected to grow by approximately 8 million tonnes by 2035 versus supply growth of only about 4 million tonnes, implying a significant medium-term shortfall; company reiterated confidence in Twin Metals progress following reversal of a mining ban in the area, and noted no change to full commodity price exposure strategy (company does not hedge input costs such as diesel or sulfuric acid).

Earnings call · H1 FY2026 · Aug 13, 2026 · 9:00 AM EDT

Full transcript →
≈ 54:36 · 125 paragraphs
Prepared Remarks
Q&A
Read the full transcript
Operator

Hello, and welcome to Antofagasta's 2026 half year results call. We will start today's session with a short introduction from Antofagasta, to be followed by a question and answer session. If you have a question, we ask that you please use the raise hand function at the bottom of your Zoom screen. If you have joined us via telephone, please press star nine to raise your hand and star six to unmute and mute. Once your name has been announced, you may unmute and ask a question. Please stay muted when not asking a question. You may also type a written question at any time in the Q&A box at the bottom of the screen. I will now hand you over to Rob Simmons in Antofagasta's London office to introduce today's speakers.

Rob Simmons

Thank you. Good morning, good afternoon, everybody. Welcome to our half year call for 2026. We are here today with our Chief Executive, Iván Arriagada, our CFO, Mauricio Ortiz, and our Vice President of Sustainability, Alejandra Vial. In terms of process today, Iván will start with a short introduction, and then we will move straight into Q&A, and we will aim to wrap up within one hour. Iván, over to you.

Iván Arriagada

Thank you, Rob, and hello everyone, and thank you for joining this year's results call. I know you will have seen this morning the release and presentation. Before I take your questions, as Rob was mentioning, I would like to say a few highlights about the results of the first half of 2026. Firstly, I would like to start with safety as we always do. This remains our first priority and the foundation of our strategy. I am pleased to share with you that we have now completed five years without a fatal or serious accident across our operations and projects, and this is and remains our key priority. This safety culture also guided us to the orderly response that we had to the severe weather condition that we experienced at Pelambres in July, and we will refer more to that during the call.

The resumption of the operations at the mine progressed in a safe and orderly manner, and we will talk about that a bit more. Going now to the first half of the year. The first half was marked by another period of strong performance for Antofagasta, with operational discipline and favorable pricing translating into a 27% increase in EBITDA to $2.84 billion. An industry-leading EBITDA margin of 63%, which is amongst the highest that we have ever recorded. Cash flow from operations was up also 53%. All of this enabled us to continue to deliver value to our shareholders through an interim dividend, which is consistent with our policy of 35% minimum earning distribution of $0.301, which represent an 80% or 81% increase on last year. So we have delivered, according to our policy, an increase of above 80% on our dividend.

Now, during this period, we've also seen, as is well known, inflationary pressures across the sector, particularly for inputs like diesel and sulfuric acid. But despite this, we've delivered a reduction in net cash cost of 8%, reflecting our cost discipline, productivity gains, and our meaningful by-product contributions, which is a very key element of both Centinela and Pelambres districts. As a result, our full year guidance for net cash cost remains unchanged for the year between $1.15 and $1.35 per pound. Due to the impact of the storms last month, and in anticipation of harsher than normal winter, full year copper production is now expected to be in the range of 625,000 tons-655,000 tons for the year. Our strong balance sheet remains a key feature of Antofagasta, and we are very well-placed to deliver value through our leading organic copper growth pipeline.

We have this pipeline fully funded. It's low risk brownfield growth program, which is intended to deliver a 30% increase in volume once commissioning is complete in 2027. I'm pleased to report that construction and pre-commissioning activities, both at the second concentrator at Centinela and in the future growth enabling projects at Pelambres, remain on track. At Sal de Vida during the period, we also approved a $900 million investment in a water pipeline to transition away from continental water by mid-2028, securing a stable future and supporting potential life mine extension to 2051. Just to close now, let me say a few words about the market. Copper is increasingly essential to global growth, driven by long-term macro trends, which we have covered in the past, electrification, grid expansion, new technologies like AI and data centers.

Global copper demand is expected to grow between now and 2035 by approximately 8 million tons, while copper supply is expected to grow by about 4 million tons. This gap makes it clear that there will likely be a copper shortfall over the medium term of significance. We think with our industry-leading program for tier 1 copper mines in a premier jurisdiction, we are confident that we're well and uniquely positioned to capture this long-term value opportunity. Against this good market background, in summary, we've had a good set of financial results for the first half. We remain on track for our projects and therefore have continued to deliver our results. With that, I'll pass back to the operator for any questions that you might have.

Operator

Ladies and gentlemen, we will now begin the Q&A session. If you would like to ask a question, we ask that you please use the raise hand function at the bottom of your Zoom screen. When it is your turn to ask a question, you will receive a prompt to be promoted as a panelist. Please accept, wait a moment, and once you have been introduced, you may unmute yourself, turn your video on, and ask your question. If you want to withdraw your question, please lower your hand using the raise hand function in the Zoom app. If you've called in on a phone, please press star nine to raise your hand and star six to mute and unmute. You may also submit written questions in the Q&A chat function at the bottom of the webinar screen. Our first question comes from Jason Fairclough with Bank of America.

Please go ahead.

Jason Fairclough

Good morning, guys. [Non-English content]. Thanks for the call today. Look, two questions from me. The first one is on the Centinela project. A second just on the impact of the storms. On Centinela, I've got a couple of bears on the stock who are saying that you've quietly pushed this back a little bit, that the ramp-up is now drifting, and it's really the ramp-up is not going to start until the year after next. Is that the right way to read it? If that's true, is there any cost impact from this?

Iván Arriagada

Okay. Let me address that. Jason, thanks for joining the call. The Centinela second concentrator project is progressing very well in terms of its construction and there are even for some subsystems pre-commissioning activities taking place. We've always said that 2027 is the year in which we will fully complete the commissioning activities and commence the ramp-up, and therefore that is unchanged. So we're not indicating any change with respect to that. We've not been precise about the timing in which that cutoff between commissioning and ramp-up will commence, but we will be more specific as we continue to advance the project and move towards completion. But it's intended that the commissioning and the ramp-up both happen in 2027, the beginning of the ramp-up. So when exactly will that happen?

It's something that we will share as we move towards completion of the commissioning phase next year. But no, from that point of view, the project is advancing well, and there is no change.

Jason Fairclough

Okay.

Iván Arriagada

The storms, just to be clear, you mentioned the storms at the beginning. I would say that the storms that we had, which are quite unique in nature, have impacted primarily the central part of Chile, so not the north of Chile. We did not see meaningful impact in Antucoya, Zaldívar, or Centinela. As I say, they were focused on the central part of Chile and primarily, in fact, in the region where Pelambres is located. Amongst the central regions that were impacted, where Pelambres is was the only one which was considered a state of catastrophe by the government, considering the impact of the snow and the water in that region, in elements like public road and other public infrastructure.

Jason Fairclough

Just to follow up, Iván. So you're saying it was quite, let's say, regionalized to the Pelambres region. I know you have lots of contacts across the industry. Is there anything else that we should think about that might be coming down the pipeline that maybe people haven't fully understood in terms of the impact? I guess with that, do you feel like your new guidance is conservative, or is there more downside risk?

Iván Arriagada

I think the way that we've looked at this is that we are sort of halfway through winter, so there's still a period of winter that needs to be completed, which could bring severe weather condition. The key issue is that we've got the El Niño phenomenon now happening. It does not happen every year, but this year it's been here and it's been extremely severe. Just to put things in perspective, in the region where Pelambres is, and for Pelambres, in fact, this has been the more severe weather event in its history. So in the guidance that we've built, we've got essentially the ramp-up of activities, and in essence, in some places in the mine, we are continuing to do that as we sort of remove the snow and prudently ensure that the conditions which are in place are safe to operate.

We've built into the guidance as well a contingency possibility that there is a weather condition which continues to be adverse throughout the balance of the winter. So, we think of it, and you should think of it in that way. It does factor in the fact that we still have a period to go, and we could have bad weather in that period, and therefore that's factored into the range as we have disclosed it.

Jason Fairclough

Okay. Fantastic. Thanks very much, Iván.

Operator

Thank you. Our next question comes from Ian Rossouw with Barclays. Please unmute to ask your question.

Ian Rossouw

Thanks everyone. Can you guys see me? Hello?

Iván Arriagada

No, but we can hear you well, but we can't see you. Yeah.

Ian Rossouw

Oh, I don't have a video button to press, but thanks very much. Just wanted to follow up on Jason's question. Obviously, if you look in the status update, you've omitted the sentence, "The project remains on budget and on schedule." You give a bit more details about the additional works that's required in the flotation and concentrator area due to geotechnical work. Can you maybe just give a bit more color on that, please? It seems like the storm issues at Pelambres was only part of the explanation for the downgrade. I guess you've given a bit more color on your conservatism going forward, but just wanted to get a sense of was there anything else, I guess, that's been tracking slightly below budgets, in terms of grade or mine plans, and how we should think about that going into 2027.

If you look at the slide deck from your site visit, I think you were intimating, let's say, roughly a 4% or 5% increase in production into 2027. Should we still expect that, or does small delay at the Centinela concentrator basically mean production might be flat? Thank you.

Iván Arriagada

Yeah. Okay. Let me address first the weather event. As I said before, in the case of Pelambres, we've sort of built the contingency component of the balance of the weather period that's still behind. Just to address your comment, what we've seen, in essence, is that recovery of the full production at the mine, because we're doing it, as I said before, in a safe and prudent and orderly way, it does take or span a bit longer time. To put things in perspective, the amount of snow that we've seen in the mine is about 5 million cubic meters. So that is material that needs to be removed, and so we're orderly doing that. So we're back into the main phases, but there are phases in the mine that we still have to fully clear.

Therefore, what we will see is a shift in grade, because we were into a zone in which we have a progressively higher grade. So with the balance of the year, some of that will shift, will be deferred, and we will be picking up either towards the very end of the year or early next year. Therefore, the guidance does reflect that. So it's the impact of the days that we've been down, plus it's the fact that the activity in the mine will resume and is resuming with certain progression, which means that the grade that we had expected will probably see some deferral. That's factored into the guidance range. Now, with respect to the Centinela project, as I mentioned before, the project is progressing well.

I think our project schedule calls for completion of commissioning in 2027, and I think we've been consistent in that. There is no change to that timeline, nor are we envisaging a change in the project cost as disclosed in the table that you have, and which is included in the release. We're not seeing any change there. We are obviously approaching the end of construction as we sort of moved into the second half and into 2027, which are the more challenging work streams because they involve integrating subsystems, they involve doing pre-commissioning tests and the like. But the fact that we remain on schedule and on budget is still the case.

In the case of the flotation cell, what's happened is that certain soil conditions have revealed that they require extra sealing for optimal conditions, and we're lucky that we've sort of identified that now, and we're able to address that now. That work is happening already, will happen within the schedule that has been provided. From that point of view, we still see fully that the project is, as I say, commissioned in 2027, and then that we sort of start the ramp-up. Which when we had the site visit, we also said that 2028 is the year in which we will see the ramp-up fully in force and completed. So commissioning 2027, ramp-up 2028, that remains unchanged.

Ian Rossouw

Okay. Thank you very much.

Operator

Thank you. Our next question comes from Daniel Major with UBS. Please go ahead.

Daniel Major

Hi there. Can you hear me okay?

Iván Arriagada

Yeah.

Daniel Major

Great. Thank you. Yes, a couple of questions. The first one is maybe a follow on slightly to Ian's question, but on a different item. I guess the market's going to be focusing on the CapEx and production guidance for 2027 that you provide with your Q3. If you're thinking about CapEx, you've indicated directionally CapEx should be coming down. Could you just try just a little bit more sort of building blocks to that. You spent $3.3 billion at Centinela to date. Would you expect to have spent the majority of the budget there by the end of the year? And where do you see normalized sustaining CapEx across the group, and how would you expect that to be trending into next year, just to give us a sense of the sort of quantum of step down in CapEx next year?

Iván Arriagada

Yeah. Yeah, we will provide guidance in the third quarter, but I will say a few comments and then pass on to Mauricio for more color. But what we see is that we've essentially passed peak capital spend for the project, and therefore, the trend is that we should see a lower number in 2027. But there's still capital spend to go in the project this year and next. As I was saying, 2027 is a year in which we will be very much focused on integrating the systems and then doing the commissioning work. But Mauricio, you may want to put more color into the components. Again, we will disclose that in more detail in quarter three, but maybe we can give Daniel some color beforehand now.

Mauricio Ortiz

Hi, Daniel. How are you?

Daniel Major

Yeah.

Mauricio Ortiz

Just a bit more of color. Starting with the sustaining CapEx. Sustaining CapEx has been in the range of $1 billion-$1.5 billion, and we will stay there for the next couple of years. That is regarding sustaining CapEx. Touching base on development CapEx. Big CapEx is now behind. Remember that last year we ran at $2.7 billion. This year, our guidance is $2.4. We are well-aligned to achieve that guidance for 2026. There is some tail CapEx related to Centinela on 2027, and I will say in 2028 onward, we will be basically running at sustaining CapEx plus any additional growth alternative that we may pursue. But at this stage, what we have in our directional guidance, as Iván mentioned, much more precise number we will provide later in the year.

But directionally, Dan, that is what we have, 2026, 2027, some tail CapEx related to the project, and 2028 roughly aligned with the sustaining CapEx.

Daniel Major

Okay, so by 2028, we should definitely, if your sustaining CapEx is $1 billion-$1.5 billion, assume CapEx is less than $2 billion. Is that a fair assumption?

Mauricio Ortiz

That is a number that we are going to provide in 2027.

Daniel Major

Okay.

Mauricio Ortiz

But that is the direction of the travel.

Daniel Major

Okay.

Mauricio Ortiz

Bear in mind that this number $1 billion-$1.5 billion is based in 2023, when we kick off our investment program. So that maybe could be something to factor in.

Daniel Major

Okay. That's useful. Thank you. And then just maybe a few specific questions, probably one for Mauricio. One, you booked an additional $630 million of lease liabilities into the net debt during the period. Is that number going to continue to increase as the water project is completed at Centinela, or could you give any guidance on the cadence around the other items in the net debt? That's the first one. The second one is the cash tax, a few hundred million dollars higher than the P&L in the first half. Would that reverse? And then the third, I noticed I don't think Marubeni made any contributions to the CapEx during the period. Why is that, and what should we be factoring in for that line item going forward?

Mauricio Ortiz

Okay. Well, let me start with the water system. I want to tie in that answer with what Iván mentioned. The project is progressing well. One of the milestones during the first half of the year was actually the first water. Centinela second concentrator already secured its water supply. That is why the translate on that in our accounting is the lease accounting of that subsystem. Remember that we outsourced this to a third party. They completed, and now we are booking the lease of the equivalent amount. Interesting also, Dan, is that this facility will provide the water for the second concentrator, and there is also latent capacity to increase throughput in the district if there is other opportunity to pursue. That is very attractive, and that is basically the explanation on why we are booking this.

Short answer to your question of is will the number keep increasing? The short answer is no, because that is the full amount of what the third party invested. On cash tax, basically, we have the settlement of our 2025 fiscal year. Remember that how the system works in Chile, you pay proportional monthly payments during the year, and then you have a settlement in April, and that is basically what we have in our cash flow this first half. Bear in mind that the second half of last year, we witnessed an important increase in copper prices, and then that, of course, increased as well our tax charge that was settled in April. Regarding to capital contribution to Centinela. Centinela operating at $0.70 per pound as a net cash cost, is generating attractive cash from the operation.

I would say that we are facing contributions and debt drawdowns in a value-accretive way in order to minimize costs for the operation. We are facing the three source of liquidity in order to optimize the financing.

Daniel Major

Okay, thanks. Just to follow up on the cash tax, I am assuming you will accrue tax payables then in the second half, that you will pay out first half of next year. There should be a positive differential between cash and P&L tax in the second half. Is that correct?

Mauricio Ortiz

No.

Daniel Major

Yeah.

Mauricio Ortiz

That's correct. No.

Daniel Major

Okay. Great, thanks. I'll go back in the queue, let someone else have a go. Thanks again.

Iván Arriagada

Thanks.

Mauricio Ortiz

Thank you.

Operator

Our next question comes from Maxime Kogge with ODDO BHF. Please go ahead.

Maxime Kogge

Yeah. Good afternoon, gentlemen. I hope you can hear me. I had a first question. This is on sulfuric acid because it's quite of a huge topic at the moment. You have some vulnerability there given the size of your leaching operations. Can you give us some sense, perhaps, of the sulfuric acid consumption by mine? Is there any big difference between the three mines that are using sulfuric acid? I think you're quite efficient there compared to peers, but any more precise view on that? What's your view into 2027 production for leaching? Because in 2026, you're still protected by the benchmark for sulfuric acid, but in 2027, this will be reset. Are you ready perhaps to keep the bit of production at Centinela to concentrate or versus leaching? Any view on that would be helpful.

Iván Arriagada

Yeah. On the sulfuric acid, obviously as a consequence of the political events, we've seen an increase in the sulfuric acid spot price during the first half, which is what you were referring to. We don't source sulfuric acid directly from the Middle East, but from other regions. Therefore, we have not had an issue with the security of the supply into our mines. They are fairly distributed, I would say, between Antucoya and volume is fairly distributed between Antucoya, Zaldívar and Centinela. Therefore, we've had the acid that's been required. Now, obviously, higher prices reflecting the conditions that we've seen in the sulfuric acid market. I think we're now seeing those conditions that have stabilized at a higher acid price level, but we see signs that may be easing.

We have generally term contracts. Therefore, we're not fully exposed to the spot price, but we have some volume of significance, which is in fact built into those contracts. As we've secured the volumes for 2027, obviously, those prices are more reflective of current conditions, but are not exactly the spot price because they are driven by the long-term commitments involved in our contracts. We expect essentially to be able to have the acid that we need to be able to operate, as we have in 2026 for 2027, and therefore, continue to deliver on our hydro operations. Now, we will provide guidance for next year in quarter three. I wouldn't like to go into breaking down how much will our leaching operations expect to produce next year, because that's the subject of the next quarter.

But as I say, we've secured the volume needed this year, so we have no interruption on the basis of securing the supply. Our prices are based on long-term contracts, and therefore, we've not seen the same increase that you will witness in spot prices. We have secured volume for next year, which reflects partly the spot price increment. As I've mentioned before, we've seen also that in the spot price, the conditions have moderated slightly. Our outlook is that things will gradually improve from this point onwards.

Maxime Kogge

All right, thank you. Second one, this is on TC/RCs. I think in the latest call, you said that about 70%-80% of your contracts were based on the benchmark and the remaining 20%-30% based on spot. Since then, you have apparently been able to negotiate a higher benchmark for H2 based entirely on index prices. Does it mean that the proportion of index prices is now predominant in your sales structure? Any view you might have on the 2027 benchmark, will it still be there according to you, or is it now gone forever with the whole system, the whole marketplace switching to the next pricing?

Since you buy some sulfuric acid from the smelters and you sell to them the concentrate, is there some way to tie the two aspects perhaps to prevent significant rises in sulfuric acid costs? That's the second one.

Iván Arriagada

With respect to TC/RCs, let me say that we negotiate those under term contracts as well. As we've said, some people call that benchmark system, but we, as I say, based our conditions on contracts which are negotiated between the parties every year, and those are term contracts. We will continue to use those contracts for that purpose. The basis on which pricing is agreed may evolve and change considering the market conditions. Because that's commercially sensitive, obviously won't be specific about that. That's as much as I can say on TC/RCs. It's a favorable market for miners. We have long-term relationships with many smelting clients in very mature markets. We have term contracts under which we secure the supply and the conditions on those.

Maxime Kogge

Okay. I stop there. Thank you.

Operator

As a reminder, if you'd like to ask a question, we ask that you please use the Raise Hand function at the bottom of your screen. When it is your turn to ask a question, you will receive a prompt to be promoted as a panelist. Please accept, wait a moment, and once you've been introduced, you may unmute yourself, turn your video on, and ask your question. Our next question comes from Ioannis Masvoulas with Morgan Stanley. Please press star six to unmute. Ioannis, please press star six to unmute your phone line.

Ioannis Masvoulas

Hello. Hello, can you hear me now?

Iván Arriagada

Yeah, we can hear you now, Ioannis.

Ioannis Masvoulas

Excellent. Excellent. Iván and Mauricio, thank you very much for the presentation. Most of my questions have been answered, but maybe one question on hedging. I understand the majority of your asset exposure has been already locked in for 2026. If prices were to remain elevated going into 2027, would you still employ the same strategy of hedging the majority of your exposure? Maybe have you changed your hedging consideration on the diesel side? If, again, diesel prices were to remain elevated, how would you think about potentially hedging for 2027, which is something you haven't done in 2026? Thanks very much.

Iván Arriagada

Yes. Thanks for the question. We generally do not hedge our commodity inputs prices. We believe that as much as we're exposed to copper price and gold and moly price and silver price through the commodities that we sell, we are best served to protect our margins if we remain exposed to the commodities that we buy, including, in this case, oil and assets. We do have long-term commercial relationships on the basis of term contracts that provide for security of supply and competitive long-term pricing mechanisms. But we do not, as a general practice, hedge our input costs like fuel and others.

Ioannis Masvoulas

Okay. Thank you for that. Maybe just to follow up on the asset side, based on the structure of the term contracts, how much of the spot price exposure will be reflected into your 2027 cost base?

Iván Arriagada

That's dependent on each contract and operation, but we would expect that trend to obviously be reflected in those prices. How much? That's very contract specific and not something that I can share openly, because it depends on the contracts specifically. But the trend that you would expect to see is that if we've seen a significant increase in the spot price, an important proportion of that would be reflected, but depends on the contract.

Ioannis Masvoulas

Thanks very much, Iván, and best of luck.

Iván Arriagada

Thank you.

Operator

Our next question comes from Ben Davis with RBC. Ben, please press star six to unmute.

Ben Davis

Hello?

Iván Arriagada

Hello. Yeah, we can hear you.

Ben Davis

Hi. Yes, it's Ben here from RBC. Just a couple of quick questions from me. One, it'd be great just to get some more color on the Twin Metals project. I mean, it bouncing back and forth in the courts, just how you see that playing out for the next couple of years or so. Then just quickly also, obviously the storm that we had was a huge outlier in terms of the severity of it. But has winter weather, in general, been getting worse over the past few years, or do you put any score to the fact that this is some sort of El Niño effect or anything else? Any color there would be helpful. Thank you.

Iván Arriagada

Yeah. So with respect to Twin Metals, as we've shared in the past, we continue to see the project as an attractive one. In the current public policy environment in the U.S., we believe that we have the ability to make some significant progress. I think what happened is, as you would know, that the withdrawal that had been passed, which banned mining in the area, has been reversed, which is good news. Then we are basically working in recovery of the leases for the main Maturi area and essentially working on the terms and conditions under which those would be handed back. So once we do that, we would expect to be able to have the ability to progress some of the other aspects which are significant around initiating permitting. So we continue to have conviction around our ability to develop this over the years.

It's what we've called a long-dated option, but we still think that every step that we can make advancing this, and especially in the current environment, is something that we should take the opportunity to do. On the storm, I would say that it is what we think quite unique in the sense that, again, in the history of Pelambres, this is, in our records, probably the most severe event that we've had. Now, whether winters have been becoming more worse or severe, the pattern that we're observing is that we've had, in fact, a prolonged drought in the region where Pelambres is, which spanned 12 years, in which there was very little rain. And that's now being combined with very intense rain and snow events like the one we've had here, which basically happened in a very, very compressed and short period of time.

So we have both extremes, a persistent drought, which I think it's the sort of underlying condition that we expect to continue to see, and for which we have essentially developed the water solution that you know, which involves that we are increasingly becoming independent in our water supply from continental sources. And probably combined from what we've seen now because of El Niño, which does not happen every year, in which we've had a very, very significant rain and snow event in a very compressed period of time. If you look at our infrastructure at Pelambres, we did not have any significant impact or damage into our infrastructure or equipment.

But obviously the issue that's impacted us most is the fact that we, for safety and prudence reason, did an orderly halt or suspension of activities and are doing an orderly as well ramp-up back of activities, which, in the case of the mine, because of the amount of snow, involves cleaning up certain areas from snow, and some of them which are very high in the mountain take a little bit more of time. So it's unique in that sense, and it's very different to the prevalent condition, which is drought. But as always, we've done this in a safe manner, and the issue has been more removing the 5 million cubic meters of snow, which is a lot of material for any mine. And doing that in an orderly way so that we can begin mining in all sections.

We're essentially back, but we've got some areas in which we still have to do some clearing of snow, and that means that our grade fed into the plant in the balance of this year will be slightly lower at Pelambres than we had originally anticipated, and hence the change in the guidance.

Ben Davis

Got you. That's very helpful. Just a quick follow-on on Twin Metals. Can I just confirm, is there any works happening outside of the kind of, obviously, the legal cases? Are you doing any study or exploration work at the asset?

Iván Arriagada

We are. We are doing work in preparation of updating our pre-feasibility. So there's some work being done there, and we're also doing some, and continue to do some, drilling in other properties that form part of the Twin Metals complex but are not located in Maturi. In other places where we hold valid exploration licenses, we're still. Yeah, we are doing some drilling.

Ben Davis

That's great. Thank you very much.

Operator

The next question comes from Matt Greene, Goldman Sachs. Please unmute to ask your question.

Matt Greene

Hey, good morning. Thanks for taking my question. Mauricio, perhaps a couple for you. You flagged here just some of the inflationary consumable pressure you're seeing on your operating costs, but just wondering if you can maybe touch on where you're feeling some of the pressure on your CapEx, because you are going through a number of earthwork-intensive projects with the Encuentro development, the Pelambres pipeline TSF. If you could just touch on are you seeing a lot of pressure on the CapEx side of the business? I know you've locked in a lot of your sort of EPCM contracts, but if you just touch on where you're seeing some pressure there, because I guess it's quite encouraging to see that your CapEx guidance is unchanged.

Mauricio Ortiz

Well, I would start remembering how our portfolio looks like this year. So it's roughly $2 billion of development CapEx associated to Centinela second concentrator and Pelambres. I remember that we announced these two projects. One of the key feature of this project that we were able to lock in the bulk of the cost on contracts with EPC contractors. So there is little exposure to diesel prices on those big projects. Where we have exposure to diesel prices is in mine development. But the people at the operation, our teams at the operations are doing a good job optimizing the routes and the diesel consumption. So we do have exposure to diesel. We do have some inflationary pressures driven by higher fuel prices. Yes, basically isolated in the mine development.

But I can see today a risk to be outside of the number that we guide for total CapEx for 2026.

Matt Greene

Okay. That's great. Thank you. Then just on your unit cost year-on-year, your controllable costs have increased almost as much as the external pressures you're facing here. Appreciate some of that. It relates to some of the operational performance. But can you just touch on how much of this is transitory versus how much is actually structurally coming into the business?

Mauricio Ortiz

Well, if you have a look at our net cash cost, basically, we were able to reduce 8%, $0.10 per pound year-on-year. That is a strong performance driven by two things, mainly one, the byproducts, the other one is the competitiveness program. That is a key feature as well of Antofagasta. We do have some inflationary pressures, but we are absorbing with these two factors. And the one that we are going to improve significantly on the second half is production. So I'm confident that we are going to deliver on our guidance on net cash cost for the full year.

Matt Greene

Got it. That's great. Thanks, Mauricio.

Operator

Thank you. I'll now hand over to Rob Simmons for written questions. Rob, please go ahead.

Rob Simmons

Thank you. First written question comes from Patrick Jones at JPMorgan. The new administration in Chile has passed legislation to cut corporate tax rates. What impact do you expect this to have on the company's effective tax rate going forward?

Iván Arriagada

Okay. That's the question, Rob, yeah?

Rob Simmons

Correct.

Iván Arriagada

Yeah. Okay, that's still legislation which is in the process of being considered and approved in Congress, so it's still not in place. It does essentially include a reduction in the corporate income tax rate from the current 27% to 23% over a period of a few years. If that is enacted, we would get the benefit of that reduction. Although our total tax when it includes withholding tax, because withholding tax operates as a top-up tax, would not change. But we would get that benefit at the corporate tax level. Not when, as I say, when we top up for dividend purposes. So it's likely to be more of a temporary benefit. We would, however, get the benefit on our deferred tax calculations, which is something that we should review when, and if this is turned into law.

Overall, the direction of this is positive in the sense that we think it reduces the levy of taxation, some of it transitory. From that point of view, it does introduce an extra element of competitiveness, which is very important. Generally, the bill where this is homed is one which has got that inspiration of being able to promote investment and business activity and employment. So positive from that point of view.

Rob Simmons

Thank you. The second written question comes from David Radclyffe at Global Mining Research. The question is as follows: You have had your 19% stake in Buenaventura for more than two years now. Is there any additional clarity that you can provide in terms of strategy? Are you considering taking profits or distributing shares to Antofagasta shareholders to realize the value?

Iván Arriagada

In Buenaventura, I think we've had an entry at a good point in time. The purpose we had was to be able to build a beachhead in Peru. We like Peru for mining purposes. Alongside our share in Buenaventura, we have our own exploration team looking for opportunities. Since we've joined, the company has done well. Certainly, the price conditions have been beneficial and we've seen an important benefit out of joining Buenaventura. We continue to work with the company, with its board and management. We are members of the board. In fact, Mauricio and myself sit in the Board, and therefore continue to work to develop the projects that they have. Obviously we're very interested in the possibilities and opportunities that they have in copper.

But we see this with the perspective of the opportunities that we can jointly continue to work on and develop. That remains unchanged from a strategic point of view. Granted that we do recognize that the results have been very positive since we went into the company.

Rob Simmons

Yeah. Thank you. The final written question is as follows: You mentioned a strong EBITDA margin of 63%, which is a historical record. Will this stronger margin persist or is it largely the result of the stronger pricing of the by-product metals this quarter?

Iván Arriagada

Yeah. Certainly our focus remains on keeping the competitiveness of our costs. We have very competitive costs, net cash costs, which involve both elements. One, the discipline with which we manage our cost base, and also the benefit of our by-products. We continue to work on this. We've also shared that we have a competitiveness program, which is delivering results, and after many years of having been in place, it continues to deliver results. Going forward, we won't change the focus on cost, which is behind a strong EBITDA margin. We have also the startup, when the project is finished, of the second concentrator at Centinela, which gives us extra scale and the ability to continue to reduce unit costs. Part of the strategy around the development of the second concentrator is actually moving Centinela to the first quartile.

Cost management and cost competitiveness across the board will continue to be a key priority, which is what we believe will sustain the higher EBITDA margins that we've recorded. Now, obviously, those margins are also dependent on prices. But our view is that we control our costs, we work to reduce them and keep them competitive. That is the best strategy which will serve us well throughout the cycle. It's very much a feature that we are on top of, and it's a priority that we continue to systematically work on.

Operator

Thank you. That concludes the written questions. We have one final question from Ian Rossouw with Barclays. Please unmute to ask your question.

Ian Rossouw

Thanks. Can you guys hear me? Sorry, my video is still not working.

Iván Arriagada

Yeah.

Ian Rossouw

Just a follow-up for Mauricio, and sort of basically alluding to what Dan was asking. Is the intention still to draw down entirely on that $2.5 billion project finance facility for the Centinela second concentrator? I'm just thinking, obviously, you didn't in the first half draw down on that facility at all, given the strong cash flow. If Centinela generates another good year of cash flow next year, could you also still fund that from operating cash flows, or is the intention to fully utilize that $2.5 billion facility?

Mauricio Ortiz

Well, Ian, we have a plan, and we announced the plan, and we are delivering according to the plan. Yeah. Time differences are just time difference. Along with a strong engineering design, we also design a very strong financial strategy to deliver Centinela second concentrator. We're executing. If there is time difference, it's just time difference. Yeah.

Ian Rossouw

Okay. The plan's still to draw down fully on that project facility.

Mauricio Ortiz

Draw down, yes.

Ian Rossouw

Brilliant. Thank you very much. That is all.

Mauricio Ortiz

Yes.

Operator

We have had a follow-up question come in from Daniel Major with UBS. Please unmute to ask your question.

Daniel Major

Hi, guys. Do not know if I have got the camera option, but can you hear me okay?

Iván Arriagada

Yes, we can.

Mauricio Ortiz

Yeah, we can.

Daniel Major

Yeah, okay. Cool. Thanks. Yeah, just final one. Just a reminder, I know you are obviously focused on delivering the current phase of the Centinela expansion, but in the past, you've talked of your multi-phased expansion and the additional optionality the ore body has. Can you just remind us where the permitting would sit with that in terms of medium to longer term? What permitting would be required to incrementally expand the concentrator again on a longer-term time horizon?

Iván Arriagada

Yeah. I mean, the permit that we have in place includes the current phase, which is the construction of the concentrator, and also an increase up to 150,000 ton a day of capacity. Yeah. So essentially, all of that is covered in the current mother permit, if you want. So that's the answer. Both these phases are included. Mm-hmm.

Daniel Major

Okay, thanks. Mauricio, you alluded to it earlier. Would you have additional water infrastructure capacity to take up to 150,000 tons as well?

Mauricio Ortiz

Yeah, there is additional water infrastructure capacity to increase throughput, yeah, in both concentrators.

Daniel Major

Okay. Great. Thanks a lot.

Operator

Thank you. There are no further questions. I therefore hand back to Iván for closing comments.

Iván Arriagada

Thank you. Well, thank you for joining us today. I hope that we've sort of addressed your questions and queries. But if we haven't, please feel free to reach out to Rob in our London office should you have any further questions. Just to summarize, then we think we've delivered a set of strong financial results on the basis of our focus on cost and also on a favorable set of market price conditions. We continue to make good progress on our projects. Just to reiterate something which has been asked, in the case of the second concentrate, we expect to complete the commissioning in 2027 and ramp up the operation in 2028. In the case of Pelambres, we also, in terms of the growth-enabling project, are making good progress, and expect to largely commission that infrastructure next year.

Because of the severe weather event, we've adjusted our production guidance. But we've done and confronted this event, which is quite unique in the history of Pelambres, in a very safe and orderly manner. That's the way that we've accomplished our shutdown and are ramping up operations in a very prudent way. Because we are in the half of winter, we are then factoring in to our new range the possibility of there being more conditions associated to the winter in what's left. With that, again, thank you very much, and we're happy through our London office to continue any further questions and dialogue. Thank you very much.

Operator

This concludes today's call. Thank you everyone for joining. You may now disconnect.